Full-Time

Wiring Technician

Posted on 9/11/2025

Crusoe

Crusoe

501-1,000 employees

Harnesses flare gas for on-site HPC

Compensation Overview

$20 - $25/hr

+ Restricted Stock Units

Tulsa, OK, USA

In Person

Category
Electrical Engineering (1)
Requirements
  • 0-2+ years of prior experience in an electronic assembly environment or as an electrician’s apprentice, demonstrating a foundational understanding of assembly and wiring.
  • Ability to read and understand a wide range of blueprints, wiring diagrams, and schematics accurately.
  • Must have a reasonable understanding of fundamental electronic/electrical theory.
  • Ability to occasionally lift, lower, push, and pull materials up to 50 lbs.
  • Must be highly detail-oriented to ensure accuracy in wiring and assembly.
  • Must be a collaborative team player willing to take on additional roles and responsibilities as needed.
  • This position is designated a safety-sensitive position and/or is located in a safety-sensitive facility. Drug and alcohol program participation is required. Must be able to pass a background check.
Responsibilities
  • Utilize basic hand tool skills, adhere to PPE (Personal Protective Equipment) guidelines, perform drilling and tapping of metal components, employ correct fastening techniques, accurately measure materials, and expertly perform wire stripping, crimping, and cutting tasks.
  • Read and interpret control and electrical manufacturing drawings to a competent level, ensuring accurate wiring and assembly.
  • Work diligently to meet and exceed accepted safety and quality standards in all tasks performed.
  • Develop a strong understanding of industry-standard manufacturing procedures for efficient and effective assembly.
  • Prepare cables for seamless installation within control panels and related equipment.
  • Create clear and accurate labels and cable tags using both electronic and handheld label machines for proper identification.
  • Understand the principles of cable sizing and utilize the correct ferrule and crimp sizes for secure and reliable terminations.
  • Mechanically lay out electrical and electronic components onto sub-panels according to drawings and securely mount them.
  • Develop a basic understanding of the fundamental differences between power and control wiring systems.
  • Be able to read and understand HPI (likely a Crusoe internal standard) drawings and possess a working understanding of cable color coding conventions.
  • Effectively liaise between project engineers and other project team members regarding manufacturing processes and drawing standards.
  • Gain a basic understanding of field cabling techniques and methods for securing cables, conduit, cable trays, and trunking.
  • Install and mount various field devices, accurately terminating cables to instrumentation, marshaling cabinets, and junction boxes as required.
  • Assemble, wire, and loom cables according to Crusoe’s internal HPI standards for organized and reliable wiring harnesses.
  • Understand the importance of maintaining sufficient material levels to ensure uninterrupted manufacturing processes.
Desired Qualifications
  • Completion of a vocational program or certification in electrical wiring or a related field.
  • Familiarity with specific industry wiring standards beyond basic understanding (e.g., IPC-WHMA-A-620).
  • Basic knowledge or experience in bending and installing electrical conduit.
  • Prior work history in a high-volume manufacturing setting.
  • Ability to check and make minor modifications to drawings as needed.

Crusoe Energy Systems captures wasted flare gas from oil and gas sites and uses it to generate electricity on-site, powering modular data centers for high-performance computing tasks. This setup enables clients to run compute-heavy workloads such as artificial intelligence, machine learning, and cryptocurrency mining using fuel captured from the same site. The company’s model has two parts: helping energy producers reduce flaring by turning stranded gas into usable power, and selling cloud computing services to customers around the world. In short, Crusoe pairs energy capture with on-site computing to provide affordable, low-carbon computing power. Unlike traditional data-center operators, Crusoe owns and controls the energy-to-compute chain—from gas capture to data processing—creating a direct link between the energy and technology sectors and offering a clear environmental benefit alongside access to compute resources.

Company Size

501-1,000

Company Stage

Series D

Total Funding

$1.1B

Headquarters

Denver, Colorado

Founded

2018

Simplify Jobs

Simplify's Take

What believers are saying

  • Google joined Crusoe in November 2025 for $40B Texas investment.
  • Crusoe Cloud's MemoryAlloy delivers 9.9x faster AI inference.
  • DRO unlocks revenue from underutilized renewables for partners.

What critics are saying

  • Texas revokes Goodnight air permits, halting construction in 3 months.
  • CoreWeave undercuts pricing by 30%, seizing 70% AI market in 6 months.
  • Google terminates partnership after emissions backlash in 6 months.

What makes Crusoe unique

  • Crusoe captures flare gas to power modular AI data centers on-site.
  • DFM achieves 99.9% combustion efficiency versus flares' 91.1%.
  • Vertically integrates energy capture with HPC and cloud computing.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at Crusoe who can refer or advise you

Benefits

Industry competitive pay

Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents

Paid life insurance, short-term and long-term disability

Parental leave

Stock options in a fast-growing, well-funded technology company

Pet-friendly offices

Teladoc

401(k) with a 4% match

Unlimited time off

Cell phone reimbursement

Tuition reimbursement

Company paid commuter benefit; $100 per month

Calm

Company News

Condé Nast
Apr 2nd, 2026
Google-backed Texas data center to emit 4.5M tons of CO₂ yearly via private gas plant

A Google-backed data center in Texas will be partly powered by natural gas turbines emitting 4.5 million tonnes of greenhouse gases annually, equivalent to adding over 970,000 petrol cars to the road. The Goodnight campus in Armstrong County is being built by AI infrastructure company Crusoe, which Google joined in November as part of a $40 billion Texas investment. According to state air permit applications, the facility's fifth and sixth buildings will use private, off-grid gas power, though Google says it has no contract in place for this energy. The project reflects a broader trend: data centers are driving a US natural gas boom, with nearly 100 gigawatts of gas-fired power currently in development solely for such facilities. Several planned projects would emit even more, with OpenAI and Oracle's New Mexico facility potentially generating 14 million tonnes yearly.

Crusoe
Dec 24th, 2024
Crusoe Closes $600M in Series D Round at $2.8 Billion Valuation to Power AI

Crusoe is on a mission to align the future of computing with the future of the climate.

Benzinga
Oct 29th, 2024
Crusoe Energy Secures $500M Investment

Crusoe Energy, a data center startup, secured a $500 million equity investment led by Peter Thiel's Founders Fund, valuing the company at approximately $3 billion. The investment supports Crusoe's expansion in AI infrastructure and coincides with a $3.4 billion deal with Blue Owl Capital for a new data center in Texas. Crusoe uses waste natural gas to power its centers, reducing emissions. Thiel's Founders Fund continues to invest in AI and cryptocurrency sectors.

VentureBeat
Jul 4th, 2024
From Code To Impact: Crusoe’S Hackathon Reveals Ai’S Power To Drive Change In Energy And Beyond

We want to hear from you! Take our quick AI survey and share your insights on the current state of AI, how you’re implementing it, and what you expect to see in the future. Learn More. In a 24-hour hackathon hosted by Crusoe Energy and Lowercarbon Capital, developers demonstrated the remarkable speed at which AI can tackle longstanding challenges in the clean energy sector. The event, held in San Francisco on June 28-29, 2024, showcased how AI tools can compress months or years of traditional work into mere hours, potentially revolutionizing clean energy deployment.The winning team, Verdigris, exemplified this swift transformation by developing an AI system that addresses key barriers in home electrification. Their tool analyzes mortgage data to identify qualified homeowners for zero-cost upgrades and generates personalized marketing materials, including AI-created images of homes with proposed improvements. This level of personalization and automation could significantly accelerate the adoption of home energy upgrades.Team Verdigris’ winning moment    Credit: Crusoe Verdigris’s system integrates with bank databases to access mortgage information, income data and property details

VentureBeat
Jun 24th, 2024
How Gradient Created An Open Llm With A Million-Token Context Window

Don’t miss OpenAI, Chevron, Nvidia, Kaiser Permanente, and Capital One leaders only at VentureBeat Transform 2024. Gain essential insights about GenAI and expand your network at this exclusive three day event. Learn More. In a recent collaboration, AI startup Gradient and cloud compute platform Crusoe extended the “context window” of Llama-3 models to 1 million tokens. The context window determines the number of input and output tokens a large language model (LLM) can process. Big tech companies and frontier AI labs are locked in a race to extend the context windows of their LLMs. In a few months, models have gone from supporting a few thousand tokens to more than a million in less than a year

INACTIVE