Full-Time

Senior Construction Manager

Posted on 7/4/2026

Vantage Data Centers

Vantage Data Centers

1,001-5,000 employees

Wholesale data center campuses for hyperscalers

No salary listed

Port Washington, WI, USA

In Person

Fully on-site in Port Washington, with approximately 10% travel that may increase as business needs evolve.

Bachelor's

Category
Architecture & Civil Engineering (1)
Required Skills
Forecasting

Get referred to Vantage Data Centers

See people who can refer or advise you

Requirements
  • A bachelor's degree in Construction Management or a related field, or equivalent experience.
  • A minimum of 7 years of experience leading construction projects of increasing complexity.
  • Proven experience managing civil, structural, architectural, mechanical, electrical, and plumbing construction scopes.
  • Strong leadership, organizational, and decision-making skills.
  • The ability to work in a fully on-site role in Port Washington, Wisconsin.
  • The ability to travel approximately 10%, with travel potentially increasing as business needs evolve.
  • The ability to occasionally stand, walk, sit, use hands to handle or feel objects, reach with hands and arms, climb stairs, balance, stoop or kneel, talk, hear, and lift or move up to 25 pounds.
Responsibilities
  • Lead management of project scope, safety, schedule, stakeholders, and budget across assigned capital projects.
  • Drive construction delivery through pre-construction, design development, permitting and entitlements, competitive bidding, team selection, construction oversight, commissioning, and project closeout.
  • Lead multiple projects and deliverables concurrently while maintaining alignment with corporate objectives.
  • Translate job requirements into execution with minimal supervision and independent judgment.
  • Implement and enforce project quality controls and safety programs through understanding of partner contracts and design documents.
  • Lead the site safety program, including conducting and reporting on two required weekly HRA site walks.
  • Perform or supervise regular safety walks to ensure contractor compliance with environmental, health, and safety policies.
  • Ensure construction execution complies with the Basis of Design, specifications, codes, lease requirements, and regulatory standards.
  • Develop requests for proposals and manage overall project budgeting.
  • Submit monthly project financial reporting, including forecasting, cash flow, and variance analysis.
  • Review monthly contractor billing and perform job walks to substantiate progress.
  • Develop, lead, maintain, and support negotiation of contracts with new and existing vendors.
  • Collaborate with design teams, contractors, Operations, and clients to coordinate delivery.
  • Coordinate logistics and planning for owner-furnished, contractor-installed equipment.
  • Lead commissioning activities for critical systems integration across new and existing data centers.
  • Ensure complete handoff of physical data center assets and project documentation to Operations.
  • Maintain awareness of mission-critical facility operations and uptime requirements.
  • Serve as a leader and mentor to employees, promoting accountability, collaboration, and professional development.
  • Capture and drive lessons learned, process improvements, and cost and schedule optimization initiatives throughout the project lifecycle.
  • Perform additional duties as assigned by Management.
Desired Qualifications
  • Seven to ten years of construction project leadership experience.
  • Data center construction experience.
  • Experience with multi-prime or alternative procurement delivery models.
  • Proficiency with Procore, Cx Alloy, and Primavera P6.

Vantage Data Centers builds and operates large-scale wholesale data center campuses for hyperscalers, cloud providers, and large enterprises. Its core product is flexible, scalable data center space (white space) within campuses that range from 64 to 150 megawatts of power, designed to be rapidly provisioned for clients’ growth (often within six months). The company uses standardized, flexible designs to ensure predictable performance, high efficiency, and minimized downtime, while prioritizing sustainability in partnership with clients. Vantage differentiates itself through its focus on large-scale wholesale campuses, rapid deployment, scalable capacity, and energy-efficiency commitments across its North American and European markets. Its goal is to help major customers quickly and reliably scale their IT infrastructure with energy-conscious, scalable data center space, backed by a strong investor base and a footprint in key markets.

Company Size

1,001-5,000

Company Stage

Debt Financing

Total Funding

$27.1B

Headquarters

Denver, Colorado

Founded

2010

Get referred to Vantage Data Centers

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • August 13, 2026 South Wales AI deployment with Nebius expands leased demand.
  • July 2026 Texas Frontier reached $22 billion financing talks for a 1.4GW campus.
  • August 2026 Ohio and Nevada starts add 2.5GW+ capacity pipeline across hyperscale markets.

What critics are saying

  • July 2026 San Antonio groups threatened Clean Air Act suits over gas turbines.
  • July 2026 Irish filings showed €151.7 million compensation exposure from Dublin delays.
  • Permitting backlash in Wisconsin, Newport, and Cheyenne threatens timelines; grid and water constraints can kill Project Latigo.

What makes Vantage Data Centers unique

  • 2026 financing mix spans Ares, Barclays, SMBC, and securitizations across regions.
  • January 2026 Welsh ABS tap extends Vantage’s industry-first EMEA data-center securitization structure.
  • August 2026 Reuters reported a possible $100 billion IPO, proving global scale.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Flexible Work Hours

Remote Work Options

Professional Development Budget

Wellness Program

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-1%

2 year growth

0%
Wyoming Tribune Eagle
Sep 3rd, 2026
Commissioners approve zone change for Vantage Data Center south of Cheyenne.

Commissioners approve zone change for Vantage Data Center south of Cheyenne. CHEYENNE - Data center development is continuing to boom across Laramie County as local governing bodies approve zone changes, permit requests, site plans and more. The most recent is the approval of a zone change request for the proposed Vantage data center south of Cheyenne. The Laramie County Board of County Commissioners approved the zone change at a meeting Tuesday for land 12 miles south of the capital city planned to hold developer Vantage Data Center's Project Latigo. Vantage officials requested the land be rezoned from Land Use (LU) to Planned Unit Development (PUD). If the approval process continues to progress, the 480-megawatt data center would be built on an 1,835-acre site along Terry Ranch Road. Laramie County Planning and Development Director Jason Arnold said the zone change will establish a framework for the development of a data center campus and supporting infrastructure, such as mechanical cooling plants, onsite power generation and more. The change also includes an onsite workforce accommodation component to house workers during the construction phase. "The subject property is currently assessed as agricultural," Arnold said. "The surrounding area consists of a mixture of range land and commercial uses. The PUD district is intended for industrial uses requiring buffering, secure operations and associated accessory uses that cannot readily fit into general commercial or mixed use districts." Vantage Senior Government Affairs Manager Matt Clark said the company was founded in 2010, and is headquartered in Denver. He said Vantage currently operates data centers in the U.S. and worldwide. "We deliver our data centers in a proven flexible manner that meets many customer needs," Clark said. "We serve many of the world's leading technology partners and leaders. And we, most of all, are committed to be a long-term partner in any community in which we build, making sure that we engage with the community in a way that limits the impact and brings the maximum return on investment." Clark said he anticipates the data center will bring up to 2,000 jobs to the local community with an investment of up to $20 billion when it's completed. Tim Denenberg, Vantage's market development director, said Vantage intends to use Wyoming natural gas in order to keep investment in the state, as well as a closed-loop cooling system to cut down on water use. Water will be drawn from onsite wells. In Vantage's permit application, the company states that for every 100 gallons of water used, 110 will be restored. "So, essentially, Vantage plans to invest in projects that will restore water into the existing aquifers, things such as flood plain and wetland restoration that essentially allow water that's not currently being restored to get restored," Denenberg said. "... Other examples might be helping invest in agriculture improvements, irrigation ways to make those more efficient." Denenberg said he hopes to begin construction next year, and said that it will continue into 2030. "This is really one of the first steps for us on the entitlements and the permitting for the project," Denenberg said. "And with that, again, really looking forward to continuing the dialogue with the community. We want to be transparent with our plans, and open about how this can be beneficial and how we can work together to make this really local to Laramie County." Commissioners approved the zone change request unanimously. Commission Chairman Gunnar Malm said that through meetings with Vantage officials, he can see that they are committed to giving back to Laramie County. "When we talk about these large industrial projects, or Laramie County in general, when we meet with folks, we tell them Wyoming and Laramie County are open for business, but you have to be willing to enter into a Wyoming relationship," Malm said. "... I think we've long looked as a community for industry that not only uses Wyoming resources to produce and power the nation, but produce power that was utilized right here in Laramie County." Let the news come to you. Get any of our free email newsletters - news headlines, sports, arts & entertainment, state legislature, CFD news, and more. Alyssa Tolman is the Wyoming Tribune Eagle's local government/business reporter. She can be reached at 307-633-3167 or [email protected].

South Wales Argus
Sep 3rd, 2026
Newport residents raise concerns over Vantage data centre.

Newport residents raise concerns over Vantage data centre. A data centre towering over nearby homes is already causing distress and daily disruption for residents. Located at the end of their gardens in Newport, South Wales, the Vantage Data Centre in Duffryn is set to cover over 46 acres when construction finishes later this year. Residents have described persistent noise, construction traffic, and concerns about long-term impacts on their health, property values, and quality of life. Vantage Data Centre overlooking the family housing estate in Newport. (Image: WALES NEWS SERVICE) Dale Johnston, 59, who has lived next to the site with his wife for more than 20 years, said: "They are there 8am every morning. "There is continuous noise from machines and they don't finish until 6pm. "They don't give us a break from it all. "It has made my wife ill with worry." The couple has lost more than just peace and quiet. Mr Johnston said: "We have lost the sun. We used to see it setting behind our house and now it is hidden behind the site." He is also worried about what will happen once the data centre is operational. Mr Johnston said: "Construction is supposed to end this year. "We don't know what it will all sound like when they have all the fans running when it opens. "I made sure they put up a wooden fence in my garden for some privacy and they planted some trees. "They clean our windows once a month but that's it. "We have monthly meetings with Vantage but they are going to stop after Christmas and what will happen then? "It feels like Newport City Council just rubber-stamped the whole thing without thinking about the people living here." Fury over plans for massive data centre amid fears it will send house prices plummeting Other residents share his concerns. Amanda Young, who lives on the same street, said: "It used to be a nice, quiet area but with more data centres coming in, we kind of don't know what they're going to bring with them. "My biggest concern is the noise, the visual impact and whether it will affect house prices. "Whichever window you look out, you can see it. "When you're sitting in the lounge, you can actually see it there." A 79-year-old neighbour, who has lived in the area for 51 years, described the dramatic change to the landscape. He said: "There used to be cows in the garden and I could see to Cardiff from here. "I don't think that it will all get used once it is built. "I think everybody is throwing money at AI and nobody has stopped to think what is the long-term future of it. "Is it really going to help the people of Newport? "Is it really going to stop rough sleeping or benefit people here?" The rise of artificial intelligence has triggered a boom in data centre construction across the UK, with the government describing them as critical national infrastructure. However, questions have been raised about their environmental impact, including demands on electricity, water, and the national grid. The scale of the data centre looming over the nearby houses (Image: WALES NEWS SERVICE) A spokesman for Vantage Data Center said the company is "committed to being a good neighbour" and works closely with local authorities to manage "construction activity, including traffic, noise and lighting" while incorporating "measures designed to protect the local environment." Newport City Council said it ensures that planning applications consider impacts on biodiversity, lighting, noise, and construction traffic. A Welsh Government spokesman said: "Any proposed data centre development remains subject to the existing planning system and environmental regulation, with robust checks and balances in place to ensure that environmental and community impacts are properly considered before consent is granted. "Investment in data centres has the potential to create new economic opportunities and support skilled employment, while strengthening Wales' attractiveness as a leading destination for advanced digital investment." The Newport campus will consist of three data centres designed to meet the growing demand for digital infrastructure driven by artificial intelligence. Residents remain concerned about the long-term effects on their community and environment once the site becomes fully operational.

NBC4i
Aug 12th, 2026
Fairfield County data center draws skepticism, alternative utility plans.

Fairfield County data center draws skepticism, alternative utility plans. Posted: Aug 12, 2026 / 05:30 AM EDT Updated: Aug 11, 2026 / 09:48 PM EDT MILLERSPORT, Ohio (WCMH) - Construction is underway in Fairfield County on a new $2.1 billion data center that left some residents hesitant. "It's like selling the soul of the town for the promise of 'progress' that never actually shows up for the people who live here," Millersport resident Zack Gorsuch told NBC4 when the project was first announced. "I'm all for innovation, but not at the cost of our land, our peace and our future." Vantage Data Centers is behind the $2.1 billion data center campus in Millersport, to include four data centers, two security buildings and one administrative warehouse. Construction began in May, with underground utilities and preparation for the first building commencing this month. Some residents said they are wary of how quickly the project moved and assumed secrecy with the project. The project will be built on 350 acres annexed from neighboring Walnut Township in 2025. Vantage said it will create 50 full-time jobs and 2,500 construction jobs. The company is also providing community updates through a website and social media page to explain its process further to community members. See previous data center coverage in the video player above. Some residents said they are concerned by the land acquisition process. Vantage got the land in February from a company called Lancaster Newark Road OH 21 LLC. According to state business records, Lancaster Newark Road OH 21 LLC was registered by attorneys, a common choice for companies that want to keep their affiliations anonymous. In February, Lancaster Newark Road OH 21 LLC merged with Vantage. Lancaster Newark Road OH 21 LLC only had the land for about two months, as it bought the site from Licking Fairfield Corp in December. The company appears to buy and sell farmland in Licking and Fairfield counties. Licking Fairfield Corp has been active for at least 40 years, according to state records. Vantage representatives said the campus addresses many common concerns about data centers, such as water and power use. Vantage uses a closed-loop cooling system in its data centers. Closed-loop systems are often recommended as they circulate water through sealed pipes so as not to expose it to air, minimizing evaporation and water use. The Millersport campus will use about 5.5 million gallons of water per year, roughly the same consumption as 75 homes. According to the Environmental and Energy Study Institute, a large data center using more traditional cooling systems can consumer up to 5 million gallons per day. Vantage is leasing land to Advanced Power to develop the Fairfield Energy Center. The center would provide on-site power using natural gas and is being financed independently, so the company said it should not impact local utility rates. The Public Utilities Commission of Ohio still needs to grant final approval for the energy center and is accepting public feedback. Common concerns from residents are the preservation of local property, possible contamination and a signed NDA between Vantage and public officials limiting public knowledge. Stacey Keller-Clements lives 1.5 miles from the plant and is among the roughly two dozen residents voicing concerns to PUCO. Keller-Clements said she is concerned about air pollution from the power plant and the speed of the process to build the center without a full understanding of possible health and environmental consequences. "As a parent, you want your kids to have more than you did, and I am just here fighting for my kids to have what I already did," Keller-Clements said. "Fresh, clean air to breathe and water that isn't contaminated with chemicals that we cannot detect or have the technology to do so." PUCO continues to accept public comments on the energy center. Vantage said construction will continue into early 2030.

Ramboll
Aug 11th, 2026
Data Centre Magazine cover story: Ramboll's and Vantage Data Center's biodiversity work.

Data Centre Magazine cover story: Ramboll's and Vantage Data Center's biodiversity work. Ramboll and Vantage Data Centers partnered to develop a biodiversity strategy for Vantage's Port Washington, WI, campus, that may help provide much needed habitat diversity for an endangered bumblebee. On the cover of their August 2026 issue, Data Centre Magazine featured Ramboll's and Vantage Data Centers's work at Vantage's Lighthouse Campus in Wisconsin, where O'brien & Gere Limited partnered on integrating biodiversity into data center development, and in the process aid in bringing back the endangered Rusty Patched Bumble Bee. Key highlights. * Ramboll partnered with Vantage Data Centers to develop a biodiversity strategy for the company's Lighthouse Campus in Port Washington, WI * The project includes restoring an ecologically diverse habitat for the endangered Rusty Patched Bumble Bee * Biodiversity enhancements were integrated into site planning and design, demonstrating how environmental stewardship and digital infrastructure can advance together * Data center developers are in a unique position to help restore and improve local ecology and biodiversity while meeting growing demand for digital infrastructure Technology Achieve sustainable growth at pace with a single, proven partner. O'brien & Gere Limited support data center excellence by managing the full lifecycle of your facilities, from site selection, concept, and design through build to operations.

Data Center Dynamics
Aug 6th, 2026
We Energies begins work on three renewable projects slated to help power Vantage's data center in Port Washington, Wisconsin.

We Energies begins work on three renewable projects slated to help power Vantage's data center in Port Washington, Wisconsin. 50 percent of generation is expected to serve the data center August 06, 2026 Wisconsin electrical utility We Energies has started construction on three renewable energy and battery storage projects in Wisconsin, with around half of their combined capacity earmarked to supply a major AI data center campus in Port Washington. The projects comprise a 150MW solar and 50MWh battery storage project in Rock County, a 110MW wind farm spanning Iowa and Grant counties, and a 75MW battery energy storage facility in Walworth County. The projects are expected to be completed by the end of 2027. Chicago-based Invenergy will develop the facilities before transferring ownership to Wisconsin utilities. We Energies will hold the majority ownership stake, with the remainder shared between Madison Gas & Electric and Wisconsin Public Service. Approximately 50 percent of the generated capacity of each of the projects has been allocated to the under-development $15 billion Port Washington campus being developed by Vantage Data Centers, Oracle, and OpenAI. First announced in October, Vantage is developing the 672-acre campus for OpenAI and Oracle as part of the AI firm's Stargate initiative. The site will total 902MW and 2.5 million sq ft (232,255 sqm) across four buildings at full build-out. Set to go live in 2028, the campus will use closed-loop liquid cooling. According to We Energies, the utility currently has more than 3GW of solar and wind capacity and around 600MW of battery storage either operating, under construction, or awaiting regulatory approval. The utility recently approved a large load tariff for customers such as hyperscale data centers, which will require them to fund the dedicated generation and transmission infrastructure built specifically to serve them, rather than passing those costs on to other utility customers. The tariff was approved by the Wisconsin Public Service Commission earlier this year. Vantage previously committed to underwrite 100 percent of the power infrastructure investment with a dedicated electricity rate. More in north america.

INACTIVE