Full-Time

Senior Manager Plant Design Integration

Plant Design Integration

Posted on 11/20/2025

Kairos Power

Kairos Power

501-1,000 employees

Designs, licenses, and demonstrates advanced reactors

Compensation Overview

$201.3k - $251.6k/yr

Albuquerque, NM, USA + 1 more

More locations: Alameda, CA, USA

In Person

Category
Engineering Management (1)
Required Skills
Management
Requirements
  • Associate’s or Bachelor’s degree in either mechanical engineering, mechanical engineering technology, drafting and design, chemical engineering, or other related design discipline.
  • 12+ years of experience in plant or process plant design facilities, such as refineries, chemical, petrochemical facilities, clean tech industries, or nuclear.
  • 7+ years of leadership experience, including managing managers and scaling multidisciplinary engineering organizations.
  • Demonstrated success in leading large-scale design projects, with exceptional communication, collaboration, and decision-making skills.
  • Hands-on experience with 3D plant design and modeling software (e.g., AVEVA PDMS/E3D, SmartPlant 3D, AutoCAD Plant 3D, Navisworks) and plant simulation tools (e.g., APROS or other simulation platform).
  • Experience designing with high-temperature molten salt or other high-temperature fluid systems is highly desired.
  • Familiar with the application and scope of ASME B31.1 and B31.3 Piping Code pertaining to Power equipment and facility design.
Responsibilities
  • Drive execution of strategic direction through integrated engineering roadmaps, programs, and workflows; oversee execution across multiple complex design projects with a focus on consistency, quality, and delivery.
  • Lead, mentor, and develop managers and technical leads, ensuring that multidisciplinary teams are aligned, resourced, and performing at a high level while actively promoting Kairos Power’s engineering values and culture.
  • Establish and enforce plant design integration standards, tools, and processes to ensure reliable, scalable, and efficient execution across all projects.
  • Identify and address program-level risks, conflicts, and bottlenecks early; resolve execution challenges and provide actionable insights to leadership for strategic decisions.
  • Build organizational capability by growing engineering talent; coach managers to strengthen leadership depth within the organization.
  • Drive effective collaboration across Plant Layout, Process Design, Piping, Civil, Structural, Mechanical, Electrical, and Instrumentation functions to achieve integrated outcomes.
  • Champion continuous improvement, adoption of advanced design tools, and process innovations that enhance efficiency and technical quality.
  • Provide leadership with data-driven recommendations on program performance, resource needs, and prioritization tradeoffs to support strategic decision-making.
  • Performing administrative tasks as required.
Desired Qualifications
  • Experience designing with high-temperature molten salt or other high-temperature fluid systems is highly desired.
  • Familiar with the application and scope of ASME B31.1 and B31.3 Piping Code pertaining to Power equipment and facility design.

Kairos Power designs, licenses, and demonstrates advanced nuclear reactors, headed by the KP-FHR which uses fluoride salt coolant and high operating temperatures to generate electricity. The system focuses on low water use and near-zero carbon emissions, pursuing an integrated path from design to regulatory licensing and demonstration to prove safety and economics. The company distinguishes itself by aiming to beat natural gas on cost and by a clear licensing/demo program coupled with environmental and grid-resilience performance. Its goal is to scale safe, affordable nuclear technology through government support, investments, licensing deals, and long-term service agreements to help decarbonize electricity.

Company Size

501-1,000

Company Stage

Grant

Total Funding

$20K

Headquarters

Alameda, California

Founded

2016

Simplify Jobs

Simplify's Take

What believers are saying

  • Google-TVA deal secures 50 MWe offtake for Hermes 2 by 2030.
  • DOE Nuclear Dominance program accelerates TRISO fuel supply by 2033.
  • BWXT partnership scales commercial TRISO production for deployments.

What critics are saying

  • Hermes 1 completion slips to 2029, delaying Hermes 2 operations.
  • TerraPower's 42-month Wyoming reactor steals Google data center contracts.
  • NRG PALLAS tests expose TRISO cracking, forcing NRC redesigns.

What makes Kairos Power unique

  • KP-FHR uses TRISO pebble fuel and Flibe salt coolant from Oak Ridge origins.
  • First NRC-permitted power-producing Gen IV reactor with Hermes 2.
  • Factory-built modules from Albuquerque campus enable modular SMR assembly.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Paid Vacation

401(k) Company Match

401(k) Retirement Plan

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

2%

2 year growth

1%
NucNet
Sep 3rd, 2025
Kairos And BWXT To Collaborate On Commercial Production Of Triso Nuclear Fuel

Kairos is developing Generation IV fluoride salt-cooled high-temperature reactor (KP-FHR) technology.

Chattanooga Times Free Press
Aug 18th, 2025
TVA, Google team up on advanced nuclear reactor project

Kairos Power will sell electricity to the Tennessee Valley Authority through an agreement announced Monday, and TVA will pass clean energy credits to its customer Google, which operates two data centers in the region.

Teknovation.biz
Jun 3rd, 2025
Ornl And Elementl Power Collaborate On A Data-Driven Approach For New Nuclear

Oak Ridge National Laboratory (ORNL) and Elementl Power have teamed up to advance a data-driven siting approach for advanced nuclear projects. The work started through a U.S. Department of Energy... The post ORNL and Elementl Power collaborate on a data-driven approach for new nuclear appeared first on Teknovation.biz.

Teknovation.biz
May 8th, 2025
Kairos Power Completes First Installation Of Nuclear Safety-Related Concrete For The Hermes Low-Power Demonstration Reactor

Kairos Power announced on Thursday that the company has completed the first installation of nuclear safety-related concrete for the Hermes Low-Power Demonstration Reactor, marking the start of “nuclear construction” on... The post Kairos Power completes first installation of nuclear safety-related concrete for the Hermes Low-Power Demonstration Reactor appeared first on Teknovation.biz.

NEI Magazine
Mar 28th, 2025
NRG PALLAS to test fuel for Kairos SMR

Netherlands research institute NRG PALLAS has signed a contract with US-based Kairos Power to assess materials and fuels that will be used in the small modular reactors (SMRs) Kairos is developing to power Google data centres.

INACTIVE