Full-Time

Staff Field Engineer

Commercial Operations

Posted on 5/15/2025

Form Energy

Form Energy

501-1,000 employees

Iron-air multi-day energy storage systems

Compensation Overview

$148k - $183.6k/yr

Berkeley, CA, USA + 1 more

More locations: Minneapolis, MN, USA

In Person

Travel to client or project sites 50-80% of the time.

Category
Mechanical Engineering (1)
Required Skills
Python
SQL
Requirements
  • B.S. in Electrical Engineering, Mechanical Engineering, or equivalent experience
  • 7-10 years of experience in renewable energy system commissioning or service engineering roles
  • Strong understanding of SCADA communication protocols such as Modbus and DNP3, networking design and operation, power plant control systems, battery management systems, and utility relay and metering equipment
  • Prior experience with troubleshooting electrical/electronic and mechanical systems, such as HVDC power converters, HVAC systems, and/or fluid delivery systems
  • Familiarity with distributed, industrial-grade control systems that use microcontrollers and CAN bus communications or equivalent
  • Ability to manipulate large data sets using SQL, Python, or equivalent
  • Superior written and verbal communication skills
  • Proven cross-functional leadership and collaboration skills
  • Excellent attention to detail and ability to produce clear and concise technical documentation
  • Valid driver’s license
  • Ability to move up to 50 lbs
Responsibilities
  • Develop and operationalize the commissioning, preventative maintenance, troubleshooting, and repair processes for Form’s fielded battery systems
  • Execute commissioning and field service tasks on internal test beds and at commercial customer project sites
  • Perform remote and on-site diagnostics and troubleshooting of equipment using custom software, SQL, data acquisition and energy management software
  • Create test routines using Python or equivalent that evaluate the health of operating battery systems
  • Define data signatures that identify unhealthy subsystems in Form’s batteries and incorporate them into Form’s fleet monitoring tools
  • Design and build custom electromechanical tooling required to troubleshoot and repair fielded battery systems
  • Work closely with Form’s Product Engineering and Product Management teams to develop a deep technical understanding of the product and its application
  • Support and lead cross-functional efforts to determine the root cause of field failures and to drive permanent resolution of these issues with Manufacturing and Engineering teams
  • Work closely with Form’s software development team to define and develop digital tools to interfacing with battery equipment
  • Travel to client or project sites 50-80% of the time

Form Energy develops and sells energy storage systems designed for long-duration use in the electric grid. Its main product is an iron-air battery that can store electricity for up to about 100 hours, offering a cost-effective alternative to traditional power plants and enabling a fully renewable grid. The system works by storing energy chemically in iron and air, allowing electricity to be released when needed over multi-day stretches, with a focus on scalable manufacturing and system integration to meet utility and municipal needs. The company differentiates itself by pursuing low-cost, multi-day storage on a large scale, leveraging iron as a plentiful material to deliver affordable, reliable energy storage compared to conventional approaches. Its goal is to support deep decarbonization of the electric system by providing reliable, year-round renewable power through affordable energy storage and deployment alongside grid infrastructure.

Company Size

501-1,000

Company Stage

Series F

Total Funding

$1.6B

Headquarters

Somerville, Massachusetts

Founded

2017

Simplify Jobs

Simplify's Take

What believers are saying

  • Crusoe's 12 GWh deal starts 2027 deliveries, adding to 75 GWh pipeline with Google.
  • Form Factory 1 in Weirton ramps production, employing 400 for AI data center demand.
  • Ireland's 10 MW/1,000 MWh project operational by 2029 expands global manufacturing.

What critics are saying

  • Powin's LFP scaling undercuts iron-air on cost and speed within 6-12 months.
  • Crusoe's Redwood hybrid reduces Form reliance, capping repeat orders in 12-24 months.
  • 50-70% efficiency lags lithium-ion, stalling utility contracts in 18-36 months.

What makes Form Energy unique

  • Form Energy's iron-air batteries store energy for 100 hours using reversible rusting of iron.
  • Iron-air technology uses abundant iron, water, and air, costing less than 1/10th of lithium-ion.
  • Multi-day dispatch complements lithium-ion, enabling year-round renewable grid reliability.

Help us improve and share your feedback! Did you find this helpful?

Benefits

100% of medical, dental, & vision premiums

HSA & Flexible FSA

Generous PTO

Employee resource program

Parental leave

Commuter benefits account

Stock options

Equity

401k

Profession development budget

Life & disability insurance

Growth & Insights and Company News

Headcount

6 month growth

-2%

1 year growth

0%

2 year growth

1%
pv magazine USA
Apr 13th, 2026
People on the move: ECA Solar, Powin, form energy and more.

People on the move: ECA Solar, Powin, form energy and more. Job moves in solar, storage, cleantech, utilities and energy transition finance. Image: pv magazine / Churchill Living The Solar Energy Industries Association (SEIA) announced the addition of ECA Solar, a leading distributed generation developer, to its board of directors. The board addition comes as several states, including Virginia, Illinois, Massachusetts, New Jersey and Maryland, among others, have advanced legislation to deploy more distributed solar to keep energy prices down for Americans. "We are proud to join forces with the premier association for solar and storage in America," said CEO and Founder Todd Fryatt, ECA Solar. "Last year, cumulative installed solar capacity in the United States reached 279,000 Megawatts, and SEIA is a driving force behind all these energy infrastructure projects. The nation's energy independence and dominance is now directly tied to the United States having thriving storage and solar industries." Americans for a Clean Energy Grid (ACEG), a leading non-profit advocacy coalition focused on transmission expansion, announced that Christina Hayes will conclude her service as Executive Director effective later this month. Under her leadership, ACEG became a pivotal force in federal transmission reform and FERC-level policy; the board has launched a national search for a successor to lead the organization as it enters a critical phase of implementation for regional grid planning and the "Connect the Grid Act." Powin, a global provider in battery energy storage platform solutions, announced the appointment of James Marshall as Senior Vice President of Global Supply Chain. A veteran of the semiconductor and high-tech manufacturing industries, Marshall is tasked with optimizing Powin's international LFP cell procurement and logistics to support the rapid scaling of its Centauri and Stack hardware platforms across North America and Europe. Intersect Power, a developer and owner-operator of utility-scale clean energy projects, announced the appointment of Sarah Devine to its Board of Directors. A expert in international project finance with a background at top-tier law firms, Devine joins the board as Intersect Power accelerates its pivot toward complex hybrid assets, including co-located green hydrogen production and large-scale solar-plus-storage installations. Form Energy, a developer and manufacturer of multi-day iron-air battery systems, announced that Arumugam Manthiram has joined the company as a Technical Fellow and Advisor, effective April 9, 2026. A world-renowned battery chemist and longtime collaborator of Nobel laureate John Goodenough, Manthiram joins the team as the company ramps up production at "Form Factory 1" in West Virginia to provide technical oversight on the long-duration storage chemistry that will stabilize the grid. The #1 trusted provider of fully-furnished apartments nationwide, Churchill Living delivers tailored workforce housing solutions for renewable energy projects with an expansive inventory and award-winning customer service. Job of the week: NABCEP PV Design Specialist WSB - Littleton, MA Forge ahead with WSB. We seek a NABCEP PV Design Specialist who will be responsible for developing comprehensive electrical and mechanical designs for commercial, industrial, and utility-scale solar photovoltaic (PV) systems. This role supports the preconstruction phase by producing accurate, code-compliant designs and documentation. The specialist collaborates closely with electrical engineers and solar analysts to ensure the delivery of efficient, high performing system design, construction phase by producing accurate, code-compliant designs and documentation. Our office is located in Littleton, MA. What You Will Do: * Develop complete PV system designs, including mechanical layouts for mounting structures and detailed electrical system configurations (modules, inverters, wiring, etc.). * Conduct site assessments and evaluate shading, orientation, and racking opportunities to support system layout decisions. * Prepare construction-ready design documentation, including electrical schematics, single-line diagrams, mechanical layouts, and site plans. * Ensure all designs comply with applicable local, state, and federal codes, including the National Electrical Code (NEC). * Utilize modeling and simulation software to optimize design performance and system efficiency. * Support permitting processes by preparing and submitting required design packages and responding to jurisdictional inquiries. * Collaborate with project managers, engineers, and analysts during project development and design refinement. What You Will Bring: * A NABCEP PV Design Specialist (PVDS) Board Certification. * Or a Bachelor's degree in Electrical Engineering, Renewable Energy, Engineering Technology, or related field; or equivalent technical training and experience. * 2+ years of experience designing industrial, or utility-scale solar PV systems. * Familiarity with the pre-construction phases of PV project development, including design, assessment, and permitting. * NABCEP PV Design Specialist (PVDS) Certification required. * Proficiency with AutoCAD (or similar CAD platforms). * Proficiency with power system design and modeling software (e.g., Etap, CYMCAP, WinGIS, PSCAD, PSS/E, CDEGS). * Strong understanding of electrical engineering fundamentals and design tools. * Work is primarily performed in an office environment with standard office equipment. * Occasional travel or field visits may be required to support project needs or stakeholder collaboration. This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected]. The pv magazine editorial team includes specialists in equipment supply, manufacturing, policy, markets, balance of systems, and EPC. Your email address will not be published. Required fields are marked * By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment. Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so. You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled. Further information on data privacy can be found in our Data Protection Policy. pv magazine USA offers daily updates of the latest photovoltaics news. We also offer comprehensive global coverage of the most important solar markets worldwide. Select one or more editions for targeted, up to date information delivered straight to your inbox. * Hold Ctrl or Cmd to select multiple editions. * Read our Data Protection Policy.

MLQ.ai
Mar 25th, 2026
Crusoe secures deal for long-lasting batteries to power data centers.

Crusoe secures deal for long-lasting batteries to power data centers. March 25, 2026 at 2:18 PM - by MLQ Agent Key points. * Crusoe agreed to purchase 12 gigawatt-hours of 100-hour iron-air batteries from Form Energy, with deliveries starting in 2027123. * Batteries will be manufactured at Form Energy's facility in Weirton, West Virginia, to power Crusoe's AI data centers independently of the grid34. * The deal supports Crusoe's 'Bring Your Own Capacity' strategy for projects like Stargate, aiming to enhance grid reliability and protect ratepayers4. * Form Energy has over 75 GWh of projects under agreement, following a 30 GWh deal with Google valued at about $1 billion13. * Announcement made at CERAWeek 2026 in Houston on March 2434 Crusoe, an AI infrastructure provider, has secured a deal for 12 gigawatt-hours of iron-air batteries from Form Energy to power its data centers. The batteries, capable of discharging for up to 100 hours, will begin delivery in 2027 and support Crusoe's grid-independent operations amid rising AI power demands1234. Deal details and technology. The agreement reserves volume, pricing, and delivery terms for Crusoe, enabling deployment of Form Energy's iron-air batteries, which use iron, water, and air to store energy through oxidation and de-rusting processes 24. These systems provide multi-day discharge, contrasting with typical four-hour lithium-ion batteries 1. Production will occur at Form Energy's Form Factory 1 in Weirton, West Virginia, where manufacturing expansion began last year 23. Deliveries to Crusoe start in 2027, following Form's first pilot in Minnesota set for 2026 35. Strategic context for Crusoe. Crusoe's purchase aligns with its Bring Your Own Capacity approach, securing power alongside compute to speed AI infrastructure rollout and reduce grid reliance 34. This supports projects like Stargate and includes a separate expansion with Redwood Materials for second-life battery microgrids 156. The strategy insulates ratepayers from cost increases and bolsters grid reliability, echoing the U.S. administration's 'build, bring, or buy' directive 4. Crusoe aims to lock in lower-carbon electricity for AI workloads amid grid constraints 1. Form Energy's momentum. Form Energy, which has raised $1.4 billion and is pursuing a $500 million funding round, now has over 75 GWh of commercial projects, including a 30 GWh Google deployment in Minnesota estimated at $1 billion 123. The Crusoe deal, likely worth hundreds of millions, marks Form's second major sale and underscores multi-day storage's role in energy-intensive sectors 12. CEO Mateo Jaramillo stated, 'This partnership with Crusoe demonstrates how multi-day energy storage can unlock new capacity for data centers' 4. Crusoe's Cully Cavness added, 'This agreement reinforces our commitment to energy innovation' 4. Long-Duration storage viability. Iron-air batteries address a core challenge in AI data center expansion: securing reliable, long-duration power without overburdening grids. Crusoe's 12 GWh commitment, following Form's Google project, validates the technology's commercial viability for hyperscale users, potentially shifting data center operators from short-duration lithium-ion reliance to multi-day alternatives 12. This deal highlights cost dynamics, with implied pricing in the hundreds of millions based on the $1 billion Google benchmark, suggesting economies of scale as Form ramps production 12. By pairing storage with renewables, Crusoe mitigates intermittency, enabling off-peak energy purchases and peak-time dispatch, which could lower operational costs over time 45 . The partnership also signals a broader industry pivot toward 'energy-first' AI infrastructure. Crusoe's BYOC model decouples data center growth from grid upgrades, allowing faster deployment in constrained regions like Texas and Nevada 45. For Form, the order accelerates manufacturing optimization and second-generation battery development for higher throughput and reliability, positioning it amid surging demand from AI and utilities 25. This move reinforces U.S. domestic production, with West Virginia jobs tied to the Weirton factory 34. Battery deployment timeline. Deliveries beginning in 2027 will test iron-air batteries at scale for Crusoe's AI facilities, potentially paving the way for broader adoption if performance matches 100-hour claims 23. Form's pipeline of over 75 GWh, including Crusoe's share, positions it to capture a growing segment of data center storage needs, especially as AI power consumption projections climb 3. Success here could prompt similar deals from competitors, accelerating multi-day tech integration. Grid operators and utilities may see reduced peak strain from such deployments, aligning with policy pushes for resilient infrastructure 4. Crusoe's dual deals with Form and Redwood suggest a hybrid storage strategy, blending iron-air for duration with second-life systems for density, which could evolve into standardized off-grid models for AI campuses 16. Form's funding round and manufacturing upgrades will be key milestones, with 2026 focused on pilot execution and 2027 on Crusoe-scale projects 25. Market reaction will hinge on cost competitiveness versus alternatives amid AI's electricity surge. Iran war triggers rush to irs-approved "golden retirement" Accounts. Markets react unpredictably during conflicts - millions of investors are moving retirement funds into gold for safety. Gold holds value during uncertain times. It returned 64% in 2025, crushing the S&P 500 by more than 3x. Now a little-known IRS-approved program lets you move your 401(k), IRA, or TSP into gold without taxes or penalties. Anchor Point Research released a free guide explaining how it works. Further sources. Written with AI assistance, verified and edited by its team. Questions? Contact MLQ.ai.

Crusoe
Mar 24th, 2026
Form Energy and Crusoe announce agreement for 12 gigawatt-hours of iron-air batteries for AI data centers.

Form Energy and Crusoe announce agreement for 12 gigawatt-hours of iron-air batteries for AI data centers. Partnership advances speed to power, domestic manufacturing, and U.S. leadership in the AI-energy nexus Table of contents Houston, TX - March 24, 2026 - Form Energy, an American energy storage company, and Crusoe, the AI factory companyindustry's first vertically integrated AI infrastructure provider, today announced a strategic capacity agreement to deliver 12 gigawatt-hours of multi-day energy storage systems to support the rapidly growing power needs of AI data centers starting in 2027. The announcement was made at CERAWeek 2026 in Houston, Texas, widely regarded as the energy capital of the world. Under the agreement, Crusoe has secured reserved volume, pricing, and delivery terms, ensuring access to Form Energy's iron-air battery technology as it scales its AI infrastructure. This agreement reflects Crusoe's Bring Your Own Capacity (BYOC) approach to AI infrastructure, where power is developed and secured alongside compute to accelerate deployment and reduce reliance on constrained grid capacity. This scalable model supports utility growth, insulates ratepayers from cost increases, and strengthens grid reliability. Aligned with the Administration's call to "build, bring, or buy" power, this structure highlights a new, energy-first model for delivering AI infrastructure at speed. Together, Form Energy and Crusoe are accelerating speed to power, strengthening domestic manufacturing, and scaling American innovation to meet rising electricity demand, positioning the United States to lead in the critical AI-energy nexus. All battery systems will be manufactured at Form Energy's Form Factory 1 in Weirton, West Virginia, supporting American jobs and reinforcing U.S. leadership in advanced energy manufacturing. "Powering the AI economy requires reliable, scalable, and cost-effective energy solutions," said Mateo Jaramillo, Co-founder and CEO of Form Energy. "This partnership with Crusoe, a market leader in energy-first AI infrastructure, demonstrates how multi-day energy storage can unlock new capacity for data centers while strengthening domestic manufacturing and delivering the firm, reliable power needed to support the next generation of AI infrastructure." "The future of AI depends on access to abundant, reliable power delivered at speed," said Cully Cavness, Co-founder, President, and Chief Strategy Officer at Crusoe. "This agreement with Form Energy reinforces Crusoe's commitment to energy innovation and establishes a new model for securing energy infrastructure at scale, enabling us to meet growing demand while building a more resilient and sustainable system." This announcement reflects accelerating commercial and manufacturing momentum as demand for reliable, large-scale power continues to grow. Form Energy has launched production at its first high-volume manufacturing facility in Weirton, West Virginia and commenced delivery of its first commercial pilot system in Minnesota, with the full project expected to come online in 2026. The company has over 65 GWh of commercial projects under agreement, including multiple large-scale deployments that rank among the largest energy storage projects by energy capacity announced globally, demonstrating the critical role of multi-day storage in enabling grid reliability and unlocking new capacity for energy-intensive industries. The agreement with Crusoe builds on this momentum, highlighting a new model for scaling firm, reliable power to support the next generation of AI infrastructure. About Form Energy: Form Energy is an American company driving innovation in energy storage technology and manufacturing. Form Energy's multi-day energy storage solutions are designed to ensure a clean, secure, and reliable electric grid, even during prolonged periods of stress on the grid. Form Energy's first commercial product is an iron-air battery system that can cost-effectively store and discharge energy for up to 100 hours. Made from some of the safest, most affordable, and most abundant materials on the planet - low-cost iron, water, and air - Form's battery system is a sustainable, safe, and scalable answer to the world's growing need for grid security and resiliency. About Crusoe: As the AI factory company, Crusoe is on a mission to accelerate the abundance of energy and intelligence. The company provides a reliable, scalable, cost-effective, and environmentally friendly solution for AI infrastructure. By harnessing large-scale clean energy, building AI-optimized data centers, and delivering an AI cloud platform, Crusoe empowers its customers to build the future faster. March 24, 2026 Crusoe and Redwood Materials Expand Strategic Partnership, Scaling to 7x the Original AI Infrastructure Density March 24, 2026 Crusoe Named to Fast Company's List of the World's Most Innovative Companies of 2026

WTOV
Mar 18th, 2026
Form Energy to deploy 10-megawatt, 1,000-megawatt-hour battery system in Ireland.

Form Energy to deploy 10-megawatt, 1,000-megawatt-hour battery system in Ireland. by Nickayla Wiggins Wed, March 18, 2026 at 6:34 PM WTOV - NW form The company plans to deploy a 10-megawatt, 1,000-megawatt-hour battery system in Ireland. WEIRTON, W.Va. - Form Energy is taking its first major step beyond the United States with a new battery storage project in Ireland, an agreement company officials say marks a milestone for Ireland's energy future and a turning point for the company's manufacturing operation in Weirton. The company plans to deploy a 10-megawatt, 1,000-megawatt-hour battery system in Ireland. Form Energy has been working on the project for five years and formally signed the agreement on St. Patrick's Day. "For the city of Weirton, this is going to be the first international project that we build here at Form Factory One," Ted Wiley, president of Form Energy. said. "And that marks our transition from a domestic battery manufacturer to a global one." Wiley said the initiative makes Weirton an exporter again and will be the first time the company goes international. He also said the project would be a major step forward for Ireland's current energy system. "This is the first multi-day storage battery that they will deploy in service of making their grid more stable and more reliable," Wiley said. According to the company, the project will be used to demonstrate the value of multi-day energy storage and help Ireland meet its energy targets. Peter Lynch, CEO of Future Energy Ireland, said Ireland currently has limited interconnection and a complex energy system, and he described how the technology could help. "It can make a major impact in improving the reliability of the grid, avoiding congestion and helping with affordability, and future proofing what the grid and the energy system should be over the next 10, 20, 40 years," Lynch said. Lynch said Form Energy has grown significantly in a short period of time and that the initiative was needed to build a larger portfolio of projects. "We have very big ambitions for modern day storage in Ireland. So if we can be successful with this first project, than the sky is the limit," Lynch said. Officials said they are hoping to have something operational by 2029. SPONSORED CONTENT MORE TO EXPLORE

Tech in Asia
Feb 27th, 2026
Google pays US startup Form Energy $1b for 100-hour battery

Google pays US startup Form Energy $1b for 100-hour battery. Google has agreed to pay about US$1 billion, according to The Information, for iron-air batteries from startup Form Energy for a new Minnesota data center powered by wind, solar, and battery storage. The batteries are capable of delivering 300 MW continuously for about 100 hours, helping stabilize renewable energy flow. Form Energy has developed the technology over several years and built a factory in West Virginia. This deal marks its first major customer, according to The Information. CEO Mateo Jaramillo said the startup is raising a US$500 million funding round and plans to go public next year. Form Energy has raised a total of US$1.4 billion to date, according to PitchBook. Food for thought. Implications, context, and why it matters. A tariff structure makes this battery deal possible. * A special tariff lets Google cover all costs for 1.9 GW of new clean energy plus grid upgrades through a Clean Energy Accelerator Charge (CEAC) 1. * Minnesota rules require large new energy users to avoid raising rates for Xcel Energy's existing customers, and this setup meets that bar 2. * Xcel Energy, the Minnesota utility on the project, can add newer options like Form Energy's iron-air batteries, long-duration energy storage that can discharge power for days, without treating them as too costly under standard regulation 3. * Google has used this clean transition tariff before to fund enhanced geothermal projects in Nevada 4. Google provides a template for how big tech can power data centers with clean energy. * AI-driven growth is pushing electricity demand higher, and some tech firms have turned to new fossil-gas plants for data centers 5. * This agreement offers another route, with a large buyer acting as the lead customer for a storage technology that needs scale. * The purchase covers an iron-air battery system that can supply 300 MW for about 100 hours, which speeds up a startup's manufacturing plans 6. * The approach lets tech companies pay for the long-duration storage needed for 24/7 carbon-free operations, while avoiding slower market paths that have held back these tools 4. How would you feel if you could no longer use Tech in Asia? Share, tag us, and land on our Wall of!

INACTIVE