BBluecore Energy builds small modular reactors on floating barges to deliver clean power to coastal ports, nearby infrastructure, AI data centers, and communities without years of fixed-site construction. Its barges carry modular nuclear reactors that can be moved to where power is needed, with design work underway for NRC and Coast Guard certification and fuel procurement planned through national-lab partnerships. The company differentiates itself by deploying floating reactors that can be towed to different sites and by pursuing early, hands-on regulatory engagement and collaborations with government agencies, ports, and industry partners. Its goal is to provide flexible, portable nuclear power at scale by certifying floating plants and expanding deployment through partnerships and funded product development.
Work here?Claim your company
We're working on gathering enough insights on this company, check back soon!
Industries
Company Size
11-50
Company Stage
Seed
Total Funding
$50M
Headquarters
Long Beach, CA
Founded
2026
See people who can refer or advise you
Total Funding
$50M
Above
Industry Average
Funded Over
2 Rounds
Industry standards
Strike at busiest US port just days away as talks continue. The Pacific Maritime Association and ILWU Local 26 have extended their agreement through 5 p.m. Pacific on Wednesday, November 4, postponing a potential work stoppage at Los Angeles and Long Beach. Negotiations continue with federal mediators, but the underlying dispute remains unresolved. The agreement covers about 250 port watchmen and is separate from the coastwide longshore contract. PMA warns that a strike could disrupt terminal operations if other workers honor picket lines; the extension moves the previous November 1 deadline back by three days. Original Article from FreightWaves | Written by Stuart Chirls Note: The articles in this newsletter are shared solely to keep its members informed on issues affecting the maritime community. Their inclusion does not constitute endorsement of any article's conclusions, recommendations, or viewpoints. National News A possible November 1 walkout by port watchmen could disrupt cargo operations at Los Angeles and Long Beach as contract talks continue. October 30, 2026 National News The Port of Los Angeles moved more than 1 million TEUs in September, the busiest month in its 118-year history. October 15, 2026 National News U.S. Maritime Administrator Capt. Stephen M. Carmel toured Bluecore Energy's Pier D facility at the Port of Long Beach, where the nuclear startup is developing small modular reactors for floating energy barges. The visit included a demonstration of the company's SMR test pressure vessel. September 21, 2026
US floating nuclear startup buys uranium for its first maritime reactor system stored at the largest commercial nuclear fuel facility in the US. Latest videos. Bluecore Energy, a maritime nuclear energy company developing compact, water-cooled nuclear power systems, today announced significant progress across several critical elements of its first system, including the purchase of low-enriched uranium (LEU) from WMC, continued pre-application engagement with the U.S. Nuclear Regulatory Commission and U.S. Coast Guard, and advancement of its maritime classification pathway with the American Bureau of Shipping (ABS). The milestones come less than three months after Bluecore Energy emerged from stealth and weeks after the company announced a $50 million seed financing. Together, they represent continued progress in moving Bluecore Energy's technology from engineering and non-fueled hardware development toward fuel fabrication, testing, validation, and future deployment. "We've moved quickly since launching Bluecore Energy, but speed only matters if it is paired with rigor. We are putting the pieces in place across fuel, testing, engineering, safety, regulation and maritime classification at the same time. That is what it takes to turn this technology into a real system, and ultimately deliver reliable, zero-emission energy where it is needed most." - Kofi Asante, Founder and CEO, Bluecore Energy Securing enriched uranium through WMC. Bluecore Energy has purchased uranium hexafluoride (UF[6]) enriched to 4.95% uranium-235 from WMC, establishing an important part of the company's nuclear fuel pathway as it advances development of its first system. The material is currently held at a U.S. nuclear fuel facility outside the state of California while Bluecore Energy advances its plans for future fuel fabrication, testing and validation. UF[6] is the required form of uranium during the enrichment stage of the nuclear fuel cycle. During the fuel fabrication stage, the UF[6] is converted into uranium dioxide, or UO[2], which can then be fabricated into fuel pellets and assembled into nuclear fuel. For Bluecore Energy, securing the enriched uranium represents a tangible step beyond reactor design and non-fueled hardware development and toward the physical fuel infrastructure required for future fueled testing. "As a leading intermediary in the global nuclear fuel market, WMC is excited by the emergence of marine nuclear and proud to bring our expertise to a new generation of reactor developers like Bluecore Energy. Establishing a reliable nuclear fuel supply is a fundamental part of moving any reactor program forward. Bluecore Energy is approaching that work with the seriousness and long-term thinking the nuclear industry requires, and we look forward to continuing to work together." - Per Jander, Director, WMC nuclear fuel team WMC operates across the front end of the global nuclear fuel cycle, including uranium, conversion and enrichment products, and supports customers across procurement, logistics, storage, financing and processing. Building safety, regulatory and maritime classification pathways in parallel. Bluecore Energy is developing its safety, regulatory and maritime classification pathways alongside its engineering and testing program. In August, the company began pre-application engagement with the U.S. Nuclear Regulatory Commission, presenting a conceptual overview of its design and discussing its regulatory strategy with NRC staff. Bluecore Energy's pre-application activities are listed on the NRC website. The U.S. Coast Guard also participated in the meeting, shortly after the NRC and Coast Guard signed a memorandum of understanding establishing a framework for coordination between the agencies on civilian maritime nuclear projects. Bluecore Energy continues to engage with both agencies as it advances the nuclear and maritime considerations associated with future commercial deployment. "Fuel is obviously fundamental to building a nuclear energy system, but what matters just as much is the environment and process around how you test it. Having access to the expertise and infrastructure at the largest commercial nuclear fuel facility in the U.S. allows us to approach this next phase with the rigor it requires. Our goal is not simply to move fast. It is to create and deliver zero-emission energy as safely and quickly as possible." - Megan Moyette, Licensing & Safety Lead, Bluecore Energy (13-year U.S. Navy nuclear submarine officer) In June 2026, Bluecore Energy received an Approval in Principle from ABS for its floating nuclear power plant design, marking the first ABS AIP awarded to a U.S.-designed floating nuclear power plant. The AIP assessment evaluated the concept against the intent of applicable ABS Rules and Guides and established an Approval Road Map outlining the technical requirements and considerations to be addressed as the design progresses through subsequent stages of development. Bluecore Energy is now advancing several key workstreams in parallel. Engineering, nuclear safety, fuel qualification and testing, federal regulatory engagement, and maritime classification requirements are being integrated to support the development of the company's first system. Building maritime nuclear energy at the Port of Long Beach. Bluecore Energy is headquartered inside the Port of Long Beach, where the company is developing its first maritime nuclear energy system and conducting research and development on a non-fueled maritime reactor module prototype. Bluecore Energy does not operate an active nuclear reactor or store nuclear fuel at its Port of Long Beach headquarters. On September 15, Bluecore Energy opened the doors of its headquarters to more than 100 leaders and guests across government, maritime, nuclear energy, infrastructure, investment, technology and the Long Beach community for the inaugural Bluecore Energy Summit. The event brought together Bluecore Energy Founder and CEO Kofi Asante; Long Beach Mayor Rex Richardson; Port of Long Beach CEO Dr. Noel Hacegaba; and Slauson & Co. Managing Partners Ajay Relan and Austin Clements for a conversation about growing energy demand, the role nuclear energy can play in meeting it, and the opportunity presented by maritime deployment. Following the conversation, guests toured Bluecore Energy's headquarters, development facility and maritime platform to see the company's work firsthand. Unlike conventional nuclear power plants built around permanent land-based sites, Bluecore Energy is designing its systems from the beginning for deployment on floating maritime platforms. That architecture creates flexibility in where future systems can operate. Depending on the application, regulatory requirements, and site-specific safety analysis, future Bluecore Energy systems could support ports, AI data centers, and coastal infrastructure from appropriate maritime locations, including potential offshore deployment. This means generating power near where it is needed does not inherently require locating a reactor on valuable land or immediately alongside the communities and infrastructure consuming the electricity. Future sites and operating configurations will be determined through the appropriate federal regulatory, maritime, environmental, security, and safety processes. The maritime environment is not an adaptation of Bluecore Energy's technology. It is fundamental to how the system is being designed. Disclaimer: The information on this website is for general purposes only. While efforts are made to ensure accuracy, Marine Insight make no warranties of any kind regarding completeness, reliability, or suitability. Any reliance you place on such information is at your own risk. Marine Insight is not liable for any loss or damage arising from the use of this website.
MarineLog article: Maritime Administrator tours Bluecore Energy's Port of Long Beach facility. U.S. Maritime Administrator Capt. Stephen M. Carmel toured Bluecore Energy's Pier D facility at the Port of Long Beach, hosted by founder and CEO Kofi Asante alongside Port CEO Dr. Noel Hacegaba. The tour featured a demonstration of the company's non-nuclear SMR test pressure vessel, which contains no nuclear fuel or radioactive material. Bluecore is developing compact, water-cooled reactors for floating maritime platforms to supply zero-emission power to ports and industrial users. The port was the first U.S. seaport to formalize a MARAD partnership on maritime nuclear energy. Original Article from MarineLog | Written by Nick Blenkey Note: The articles in this newsletter are shared solely to keep its members informed on issues affecting the maritime community. Their inclusion does not constitute endorsement of any article's conclusions, recommendations, or viewpoints. National News A converted Caspian Sea firefighting tug is now Canada's first new large Great Lakes cutter in three decades. September 17, 2026 National News The Port of Long Beach handled its busiest August on record, moving 919,992 TEUs as U.S. container imports stayed stronger than expected through late summer. Imports rose 3.6 percent year over year, marking the fifth-busiest month in the port's 115-year history. September 15, 2026 National News Marad is activating SUNY Maritime's training ship Empire State for a roughly 170-day federal mission beginning Sept. 1, reportedly to Diego Garcia, to help expand transportation capacity for naval personnel in the Indo-Pacific. September 2, 2026
Bluecore Energy raises $50M for floating nuclear power. Bluecore Energy is trying to turn the shoreline into part of the power grid. The Long Beach startup announced an oversubscribed $50M Seed round on September 8, 2026, led by Silverton Partners, to advance compact, water-cooled nuclear reactors designed for floating barges. The financing gives Bluecore room to work on the less visible parts of a maritime nuclear system: engineering, hardware, testing, validation, licensing, maritime classification, manufacturing preparation, hiring, and fuel procurement. It also puts a larger burden on the company to distinguish a test platform from a deployable power plant. Bluecore has secured a terminal and delivered a barge to the Port of Long Beach, where it is assembling an electrically heated reactor-module prototype. That prototype contains no nuclear fuel or radioactive material. Its job is to test sensors, controls, monitoring, and water flow while the company builds the evidence needed for later technical and regulatory decisions. The $50M includes Bluecore's earlier Pre-Seed. The Seed announcement follows a $10M Pre-Seed disclosed in July. Axios and The Register report that the new $50M figure includes that earlier capital. The conservative total disclosed funding is therefore $50M, not $60M. Silverton led the round. Returning backers include Slauson & Co., Harlem Capital, Precursor Ventures, LMNT Ventures, Visible Hands, Capital Factory, Share Ventures, X&, Markham Valley Ventures, HartBeat Ventures, and existing angels. New investors include MaC Venture Capital, Collab Capital, Act One Ventures, Animal Capital, BAG Collective, Rackhouse Ventures, Borusan Ventures, Symphony, Vanderbilt University, Scribble Ventures, Fortson VC, and individual investors including Joel Embiid, Malik Monk, and Taijuan Walker. Bluecore says the round was oversubscribed and closed in eight weeks. The speed matters for a company founded in 2026, but it does not compress the engineering and licensing work ahead. Capital can put more hardware and specialists behind the program; it cannot substitute for the evidence those people must produce. A reactor design built around water access. Bluecore's initial design targets about 10 megawatts of electrical output. The company says one unit could supply electricity comparable to the usage of roughly 15,000 homes, operate for years between refueling, and combine with other units when a port or industrial site needs more capacity. Those are design claims, not the measured output of an operating Bluecore reactor. The barge is central to the commercial thesis. A reactor assembled near a shipyard could eventually be moved to a suitable coastal location, positioned offshore, and connected to land by subsea cable. In principle, that model brings generation closer to ports, data centers, and industrial loads while using established marine construction and logistics capabilities. Water access also creates additional obligations. The system must satisfy nuclear safety, vessel safety, offshore operations, security, emergency planning, grid interconnection, environmental review, and questions about which institution controls each part of the asset. The project only becomes useful when those separate regimes meet in a design that regulators, classification bodies, port operators, and customers can accept. The Long Beach prototype is a test, not a reactor. Bluecore's current barge provides a physical place to exercise the non-nuclear systems before fuel enters the program. A local report on the Long Beach site describes an electrically heated prototype without nuclear fuel or radioactivity. That distinction keeps the current milestone legible: Bluecore has started an important hardware program, but it does not have an operating power reactor. Founder and CEO Kofi Asante is leading a team with experience across reactor design, licensing, controls, quality, supply chains, and marine systems. The company's public team page identifies Kwadwo Adutwum in nuclear core design, Megan Moyette in licensing and safety, Andrew Phillips in controls, William Zimmer in quality and supply chain, and Jordan Diggs in recruiting. Bluecore does not publicly list a chief technology officer. The Seed is meant to expand that group and move more of the system from concept into tested hardware. It will also support a fuel order, according to the company. Fuel procurement is consequential, but an order would not itself authorize loading, operation, or commercial deployment. Regulatory coordination has begun, but no license exists. Bluecore says it has begun formal engagement with the U.S. Nuclear Regulatory Commission and the U.S. Coast Guard. The NRC's maritime nuclear applications program explains how the agencies are coordinating their respective authorities for civilian maritime nuclear technology. Early engagement can identify design and jurisdictional questions before a formal application, but it is not a license or approval. The federal interest around Long Beach is broader than Bluecore. The U.S. Maritime Administration and the Port of Long Beach signed a memorandum of cooperation to study advanced nuclear uses that may include small modular reactors, microgrids, shore power, and vessel propulsion. That agreement is relevant context for the port, not a contract with Bluecore and not permission for the company to operate a reactor. Bluecore has not announced a named customer, power-purchase agreement, revenue figure, valuation, order book, commercial license, or deployment date. Reporting indicates that the company expects several years of development before a fueled system could operate. Any schedule will depend on engineering results, regulator requirements, fuel availability, maritime classification, site approvals, and customer commitments. What this Seed round now has to prove. The first proof is technical: the non-fueled prototype must produce useful data about controls, sensors, thermal behavior, water systems, maintenance, and the realities of building on a marine platform. The second is institutional: those results must arrive in forms that support design reviews, classification, licensing, port planning, and eventual customer diligence. The third proof is economic. Bluecore's model depends on manufacturing compact units at a cost and pace that can compete with other sources of firm power, then operating them within demanding nuclear and maritime rules. The company has not disclosed unit economics, contracted demand, expected power prices, or independently validated construction timelines. At Long Beach, the work now moves through sensors, fuel orders, design reviews, classification files, and the institutional patience required to make each handoff credible. Bluecore's barge may be the visible object, but the next chapter will be written in the evidence that lets the port, regulators, and eventual customers decide what can safely come aboard.
Barge reactor startup Bluecore banks $50M seed from Silverton. Bluecore Energy raised a $50M seed led by Silverton Partners to engineer and license its floating nuclear reactors. Last updated: September 9, 2026 5:56 am Seven weeks after its launch round, the startup putting small nuclear reactors on barges has banked five times as much again. Bluecore Energy's $50M seed will pay for engineering, testing and licensing of its first floating system, with the cash arriving just as the company starts formal talks with US regulators. Silverton Partners led the round. Slauson & Co., Harlem Capital, Precursor Ventures and other early backers returned, joined by MaC Ventures, Collab Capital and a group of new investors. Backers have now put $60M into the company founded by Kofi Asante, a former Uber Freight employee. Its first barge-borne plant is designed to produce about 10 megawatts around the clock and run for years between refuelings. Bluecore sees ports, coastal industry and AI data centers as the customers, with cargo ships a later ambition. Regulators are already in the loop. Since July, Bluecore has secured its first barge and opened engagement with the US Nuclear Regulatory Commission and the Coast Guard, and it is building a non-fueled reactor prototype at the Port of Long Beach to validate monitoring, sensor and control systems. Light-water reactors have powered the US grid for decades, so the technology is proven. The hard part is packaging one for a moving maritime platform and clearing a new licensing path, which is why the team leans on former Navy nuclear submarine officers and engineers from SpaceX, Northrop Grumman, Toyota and Rivian.
Find jobs on Simplify and start your career today
Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs
We're working on gathering enough insights on this company, check back soon!
Industries
Company Size
11-50
Company Stage
Seed
Total Funding
$50M
Headquarters
Long Beach, CA
Founded
2026
Find jobs on Simplify and start your career today
Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs