D

DEME

Marine engineering and offshore infrastructure contractor

Overview

DEME Group handles marine engineering and contracting, performing dredging, land reclamation, offshore wind farm installation, marine and port infrastructure work, and environmental projects like soil remediation. It plans and executes large coastal and offshore projects with a fleet of specialized vessels and engineering teams to move earth, install structures, and manage permits and environmental protections. DEME differentiates itself with one of the largest fleets of dredging and marine construction vessels, enabling big, multi-country projects and an end-to-end service from dredging to environmental remediation. Its goal is to deliver complex marine and coastal construction and environmental projects safely and efficiently on a global scale, helping clients develop ports, energy infrastructure, and reclaimed land.

Work here?Claim your company

About DEME

Simplify's Rating
Why DEME is rated
A-
Rated A on Competitive Edge
Rated A on Growth Potential
Rated B on Differentiation

Industries

Industrial & ManufacturingGovernment & Public SectorEnergy

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Antwerp, Belgium

Founded

1876

Get referred to DEME

See people who can refer or advise you

Simplify Jobs

Simplify's take

What believers are saying

  • First-half 2026 turnover reached 2.2 billion euros, with EBITDA margin at 21.6%.
  • DEME’s order book hit 7.1 billion euros, giving visibility through 2027 and beyond.
  • October 2026 Zeevonk turbine and July foundation awards deepen a large 1 GW Dutch pipeline.

What critics are saying

  • Zeevonk remains subject to final investment decision, delaying 2028 work and revenue conversion.
  • Trump’s 2026 U.S. offshore wind attacks threaten permitting, schedules, and vessel redeployment economics.
  • A prolonged offshore wind freeze strands Norse Energi, Norse Wind, and expensive fleet additions.

What makes DEME unique

  • DEME runs one of the sector’s largest specialized fleets across dredging, offshore energy, and remediation.
  • The group pairs marine contracting with environmental cleanup, like Schiphol PFAS soil washing.
  • DEME modifies vessels and equipment in-house, letting it serve harsh, project-specific conditions worldwide.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Professional Development Budget
  • Training Programs
  • Commuter Benefits

Stock Price

Company News

Dredging Today
Nov 10th, 2026
DEME's dredger starts work on new Port 2000 channel.

DEME's dredger starts work on new Port 2000 channel. 1 minutes read Backhoe dredger Peter the Great has recently started dredging operations as part of the project to create a new access channel at Port 2000 in Le Havre, France. This marks a new phase in the project, following an important milestone in the construction of the new breakwater, DEME said in a social media post. Known as La Chatière, this new 2-kilometre access channel will link Port 2000 to the historic port of Le Havre and the Seine basin. This will provide river barges with direct access to the terminal in all weather and tidal conditions. Working alongside their joint venture partner, Terélian, DEME has reached another milestone as the new breakwater has now been connected to the southern breakwater of the historic port. This operation, described as technically challenging, involved creating a connecting civil engineering structure and adapting the existing concrete protections to integrate the new Accropodes(TM) with the historic breakwater. With this milestone achieved, Peter the Great has now commenced operations. The excavated materials are being transported by split hopper barges Vlaanderen VII and Vlaanderen VIII to the Octeville disposal site. The works form part of the Port 2000 La Chatière project, which is being financed by the Normandy Region, the French State, the European Union, and HAROPA PORT. Reach the DredgingToday industry in one go! DredgingToday is read by thousands of professionals every day. Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in its business directory. Follow DredgingToday on:

Blue Green Feather
Oct 28th, 2026
DEME and Prysmian start cable installation in Veerse Meer for Dutch offshore wind connections.

DEME and Prysmian start cable installation in Veerse Meer for Dutch offshore wind connections. Dutch TSO TenneT has started installing 525 kV subsea power cables in the Veerse Meer in the Netherlands, with Prysmian supplying the cables and DEME carrying out the installation. The work forms part of the two offshore grid connections IJmuiden Ver Alpha and Nederwiek 1, designed to bring electricity from future North Sea wind farms ashore. Installation in the Zeeland waterway is scheduled to continue until spring 2027. The project marks the first time TenneT has installed 525 kV cables in an inland waterway. Specially developed pontoon for 525 kV cable installation. DEME has developed a dedicated pontoon equipped for laying the high-voltage cables under the conditions in the Veerse Meer. The cables are manufactured at Prysmian's factory in Finland. Each grid connection requires four cables in the waterway: two high-voltage power cables, one spare cable and one fibre-optic cable. The power cables have a diameter of 16 cm and weigh approximately 67 kg per metre. The installation method uses a vertical system to lower the cables to the required depth. High-pressure water temporarily loosens the sand beneath the cables, allowing them to be buried at least 3 metres below the bed of the lake. The sand then settles back around the cables as the installation progresses. According to TenneT, this approach avoids dredging and reduces water turbidity, helping to limit the impact on aquatic flora and fauna. It is also intended to minimise disruption to shipping and recreational users of the Veerse Meer. Connections link offshore wind to Borssele. The cable works are part of the IJmuiden Ver Alpha and Nederwiek 1 offshore grid projects. The routes come ashore at Banjaardstrand, near Kamperland, before passing beneath the Veerse Gatdam and through the Veerse Meer towards Borssele. Two onshore converter stations are planned at Borssele. These will convert electricity transmitted at 525 kV direct current into 380 kV alternating current for delivery to TenneT's national transmission grid. Offshore wind capacity expansion. The cable infrastructure is part of the Netherlands' wider offshore wind expansion programme. National offshore wind capacity is expected to increase from approximately 4.7 GW to around 22 GW by 2035. TenneT expects the work in the Veerse Meer to be completed in spring 2027, allowing recreational activities on the waterway to resume without construction-related disruption during the summer season.

Staad Group
Oct 23rd, 2026
DEME Group: charting its own course (with video).

DEME Group: charting its own course (with video). 23 october 2026. DEME Group is fully committed to sustainability, but does so realistically. An electric crawler excavator weighing over 37 tons, two substantial battery packs, and a 14-meter extended boom. On the Sterke Lekdijk project, the DX355LC MLR Electric from DEME Group is fully integrated into production. This is not an electric machine for show, but a powerhouse that does not shy away from heavy work. For DEME wants to become more sustainable, but in a practical and effective way. Video: DEME environmental NL: view the crawler excavator in the field Own identity and specialisms. DEME, headquartered in Zwijndrecht, Belgium, is active worldwide in dredging, offshore energy, maritime infrastructure, and environmental works. Originally founded by the Dutch company Ackermans & Van Haaren (AvH), the company can draw on exactly 150 years of experience and is a leader in innovation. By 2025, a turnover of 4.2 billion euros will be realized with approximately 6,000 employees. The Dutch branch, DEME Environmental NL, originated from De Vries & Van de Wiel. "We still have our own identity and specialisms," says operations manager Bas Bouwens. That expertise lies primarily in the fields of flood protection, inland waterway dredging, (water) soil remediation, and sand extraction. Consequently, the fleet consists largely of vessels. When it comes to sustainability, DEME is explicitly charting its own course. The ambition is to switch to zero-emission operation for earthmoving equipment by 2030. "We want to take steps ourselves, especially regarding heavier equipment," says Bouwens. "We can rent machines up to 30 tons relatively easily, including electric ones. That is why the decision was made to invest in three zero-emission excavators weighing over 35 tons." Message continues below the image Not a standard machine. In doing so, DEME does not opt for crawler excavators that roll straight off the assembly line. The work almost always requires modifications. A wider undercarriage, for example, for use on a pontoon, or a longer boom for dike reinforcement work. This was also the case with the DX355LC MLR Electric, which Staad delivered in 2024. The electric 37-tonner is equipped with two Powerbox 400 battery packs and is ideal for dike projects or dredging work from a pontoon. After the GoWa project (Gorinchem-Waardenburg), it is now operating on Sterke Lekdijk. There, DEME is collaborating with Heijmans and GMB on the reinforcement of a dike section of approximately 11 kilometers. The project is part of the High Water Protection Program. For this work, the double-head green crawler excavator features a 14-meter semi-longreach boom equipped with a cylinder, allowing the lifting cylinders to be positioned lower. This enables the boom to achieve a greater lifting height, making loading trucks, for example, easier and more efficient. The machine is also equipped with extra counterweight, a tiltable quick coupler, GPS, overpressure preparation, and automatic lubrication. "We always push the limits," says Bouwens. "We operate with a substantial 1,800-liter bucket and naturally want to maintain production. In practice, it handles that perfectly well." Message continues below the image Putting together an important puzzle. Electric excavation itself turns out not to be all that complicated. The real challenge lies elsewhere. "Power logistics is our main focus. On projects like this, you simply don't automatically have a heavy-duty grid connection available." So DEME deliberately opted for interchangeable battery packs. With the two Powerboxes in the machine and two additional swap boxes, the DX355LC-7 MLR Electric can run for roughly ten to twelve hours. Nevertheless, the battery packs are swapped as standard every day of operation. This keeps the schedule predictable and ensures everyone knows what to expect. A total of five electric excavators are operating at Sterke Lekdijk. That requires considerable organization. Where is charging done? How much capacity is available? When are the batteries swapped? And how do you prevent equipment from coming to a standstill? "A work planner spends a significant portion of his time on that," says Bouwens. "Moreover, we try to recharge the battery packs as much as possible on-site or in the surrounding area. If you constantly have to drive them long distances back and forth by truck, you create emissions somewhere else." Do not run on a battery. It wasn't just the organization that had to get used to electric equipment. There was also initial reluctance among operators. 'I'm not going to sit on a battery, am I?' Bouwens would be told. "We are fortunate that we work a lot with permanent operators. They often committed to this new technology from the outset." Once behind the joysticks, that doubt usually vanished quickly. "In terms of comfort and ease of operation, the machine is on par with a diesel machine." Changing a battery pack has also become routine by now. Whereas in the beginning it involved searching and trial and error, a battery swap now takes five to ten minutes. DEME was previously one of the initiators of the Emissieloos Netwerk Infra, in which companies share practical knowledge about zero emissions. According to Bouwens, innovation is an integral part of the company. At the same time, DEME does not want to pursue sustainability for the sake of sustainability. "We want to lead the way, but we do so realistically. For each project, we assess what is feasible and whether an investment is justifiable." Message continues below the image Hardly stopped. The market also plays an important role in this. "One project imposes strict requirements for emission-free working, while in other tenders it hardly plays a role. That is a pity, because for companies looking to invest, that continuity is precisely what is important." The collaboration with Heijmans and GMB on major dike reinforcement projects does provide DEME with that certainty. According to Bouwens, Staad's electric crawler excavator has therefore hardly stood still. However, that does not mean that everything always runs flawlessly. "With new technology, things naturally go wrong sometimes. It would be strange if that weren't the case. In that situation, it helps if you can easily find each other and look for a solution together." The fact that DEME ended up with Staad has to do not only with the technology but also with collaboration. "We are very pleased with the service. Communication lines are short, and as a customer, you are well informed about what happens during the construction and delivery of a machine." Even more electric. In addition to the DX355LC MLR, DEME now also has two 20-ton electric DL285 wheel loaders. These are being deployed at Schiphol to clean 200,000 tonnes of PFAS-contaminated soil. Furthermore, a second DX355LC Electric has been ordered and will be delivered in January. Bouwens therefore does not foresee a return to diesel-only happening. "Electric earthmoving is becoming increasingly common. The equipment is available and the teething problems are now behind us. The biggest challenge will soon no longer lie in the machine itself, but primarily in the question: how do we get enough power to the right place on time?" This article was published in Grondwerk Magazine, Autumn 2026 edition. Would you like to receive this beautiful magazine as well? Then click here. * Share this message on More news. Would you like to know more about its machines or its service? Contact Staad Group. Staad Group is happy to tell you more about it!

DEME
Sep 15th, 2026
DEME Environmental advances PFAS remediation with new soil wash installation at Schiphol Airport.

DEME Environmental advances PFAS remediation with new soil wash installation at Schiphol Airport. Publication Date 15 Sep 2026 DEME Environmental has opened its new Soil Wash installation at Schiphol Airport, enabling PFAS-impacted soil to be cleaned and reused in future projects. With an expected capacity to make approximately 200,000 tons of soil suitable for reuse in the coming years, the facility showcases DEME Environmental's innovative and pioneering approach to PFAS remediation, combining advanced treatment technologies with circular soil management solutions represents an important step towards more sustainable and circular soil remediation solutions.

SeaEmploy
Dec 28th, 2025
DEME secures two marine works contracts in Italy and Spain

DEME secures two marine works contracts in Italy and Spain. DEME closed 2025 with a strong Mediterranean statement: two fresh marine works awards that target real coastal and environmental pressure points. One contract supports Naples as it prepares for the 38th America's Cup, with heavy marine works tied to the Bagnoli-Coroglio redevelopment. The other tackles beach erosion in Valencia through a large-scale nourishment program. For professionals tracking maritime jobs and project-driven hiring, this matters. At SeaEmploy, we watch these contract signals closely because they often foreshadow demand for crews, subcontractors, and specialist suppliers across the region. DEME says its share of the two contracts sits in the €50 - 150 million range. That's not just revenue talk. It hints at the project scale, vessel intensity, and the length of the execution window across Italy and Spain. DEME contracts in Italy and Spain: what's actually included. Italy: Naples marine works linked to Bagnoli-Coroglio and the America's Cup. In Italy, DEME will work in the Bay of Naples at the Bagnoli-Coroglio site. The scope blends coastal engineering with environmental cleanup, which requires careful sequencing and tight controls. A consortium brings the delivery model. DEME partners with Savarese Costruzioni and Iterga Costruzioni Generali to execute key components offshore and along the former industrial waterfront. The numbers tell the story. The plan includes 900 meters of offshore breakwaters, the removal of about 130,000 m^3 of sediments, plus demolition of a deteriorating central pier and former service buildings from the old steel-plant era. DEME also targets substantial completion by next summer. So the area can host preliminary regattas and enable wider urban regeneration steps. This contract sits inside a much larger narrative: Naples will host the 38th America's Cup in 2027, with Bagnoli identified as a focal zone for revitalization and event infrastructure. Spain: Valencia coastline protection through nourishment and shoreline measures. In Spain, DEME won the Valencia beach nourishment project through a joint venture with Rover Maritime, commissioned by Spain's Ministry for Ecological Transition (MITECO). The project targets three well-known beaches: Sagunto, Sueca, and Cullera. Local communities have watched these stretches lose sand for decades, with storms accelerating retreat and shrinking the usable beach width. DEME doesn't treat this as a simple sand dump. The scope combines nourishment with complementary coastal measures to improve longevity. The goal is straightforward: restore protective capacity and keep the coastline enjoyable and functional for residents, tourism, and ecosystems over the long term. Dredging that changes the outcome: 3 million m[3], deep-water sourcing, and smart placement. The Spanish award stands out because of its volume and operating depth. DEME plans dredging and placement of ~3 million m[3] of sand, using the trailing suction hopper dredger Bonny River, which can operate at depths beyond 100 meters. That capability matters when nearshore compatible sand sources run scarce. Volume alone doesn't guarantee success. Beach nourishment works when grain size matches, placement respects coastal drift, and contractors shape the profile so waves rebuild the beach instead of stripping it immediately. DEME also adds dune restoration and builds new groins as part of the Valencia package, aiming to reduce losses and stabilize key sections. Taken together, the Spain and Italy scopes show a consistent pattern: DEME positions its dredging fleet and marine civil engineering teams as problem-solvers for "messy" coastlines. Not just construction. Remediation, protection, and public-facing outcomes that governments can defend. Closing paragraph. DEME's two Southern Europe wins connect high-profile sport, urban regeneration, and climate-driven shoreline defense in one December announcement. Naples gets offshore breakwaters and seabed remediation at Bagnoli-Coroglio ahead of America's Cup preparations, while Valencia gets a major nourishment program across Sagunto, Sueca, and Cullera with deep-water sand sourcing and added coastal stabilization measures. If you work in dredging, marine construction, hydrography, or coastal engineering, keep an eye on these project timelines. They often translate into real staffing ramps. Follow SeaEmploy.com for practical updates on maritime opportunities tied to active contracts - and share this article with someone who tracks Mediterranean marine works.

Recently Posted Jobs

Sign up to get curated job recommendations

DEME is Hiring for 93 Jobs on Simplify!

Find jobs on Simplify and start your career today

Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs