DDayOne Data Centers designs, builds and operates large-scale, AI-ready data center campuses for hyperscale cloud providers and enterprises in Asia Pacific and Europe, offering colocation and build-to-suit capacity. It uses an integrated, modular delivery model with prefabricated components to shorten construction times and bring capacity online quickly, backed by liquid cooling and intelligent infrastructure management. The company differentiates itself with a Singapore–Johor–Riau corridor footprint and expansion across Thailand, Japan, Hong Kong, Finland, and Spain, along with more than 1.5 gigawatts of capacity bookings and trials of low-carbon tech like solid oxide fuel cells. Its goal is to provide scalable, reliable digital infrastructure that enables customers to run cloud and AI workloads with fast deployment and strong connectivity.
Work here?Claim your company
Industries
Company Size
1,001-5,000
Company Stage
Debt Financing
Total Funding
$14.2B
Headquarters
Singapore, Singapore
Founded
2022
See people who can refer or advise you
Help us improve and share your feedback! Did you find this helpful?
Total Funding
$14.2B
Above
Industry Average
Funded Over
7 Rounds
DayOne weighs IPO delay or size cut: data centre reality check. By Wendy Y. / November 13, 2026 Quick Answer: DayOne Data Centers, headquartered in Singapore, is weighing a potential delay or a smaller US IPO that may raise US$2.5 billion (RM10.14 billion) to US$3 billion. The move comes as public demand for data centres cools, with AirTrunk's S-REIT IPO also postponed. For shareholders, the key number is DayOne's US$82 million net loss in 1HFY2026, which makes funding timing critical. DayOne Data Centers is weighing a delay or a smaller US IPO that may raise US$2.5 billion (RM10.14 billion) to US$3 billion, according to Bloomberg. The move shows how the data centre IPO market has cooled. Why is DayOne weighing a delay to its data centre IPO? DayOne has waited for the right window to launch, and it has considered pushing the share sale back until the market recovers, Bloomberg claims. Volatility around data centres is increasing. The company is still loss-making. It recorded a US$369 million net loss for ordinary shareholders in FY2025 and a US$82 million net loss in 1HFY2026. Which data centre listings have already stalled? * AirTrunk: Bloomberg reported on Oct 13 that its S-REIT IPO on the Singapore Exchange had been 'postponed'. The Australian Financial Review said on Oct 3 that its scheduled A$4.4 billion (RM12.5 billion) IPO could be postponed. * Firmus Grid: The Australian AI and data centre company postponed its IPO on the Australian Securities Exchange on Oct 8. * CoreWeave: Its bonds sank in the week of Oct 12 to 16, and the cost of insuring its debt against default hit a record. * Oracle: Its debt was rated one notch above junk. AirTrunk was sold to Blackstone and the Canada Pension Plan in December 2024. Its IPO excitement faded because of what the source calls seemingly expensive pricing. How much debt is behind DayOne's expansion? * Aug 18: DBS Bank, OCBC and UOB provided a four-year S$530 million (RM1.68 billion) green loan for DayOne's first Singapore data centre. * Dec 2025: A €500 million mezzanine facility from Brookfield and a global sovereign investor, expandable up to €1 billion, for Finland. * Oct 13: A syndicated loan from more banks for its Johor data centres. The Singapore site will be ready next year. DayOne signed a power purchase agreement with Sembcorp Power, so all operations will be fully covered by renewable energy. Why does Johor matter for DayOne's Data centre pipeline? DayOne has built campuses at Nusajaya Tech Park and Kempas Tech Park in Johor. It claims about 1.4gw of bookings from five 'global' hyperscalers. DayOne executive vice-president Ong Kok Chye said markets like Malaysia and Thailand are now on everyone's mind. He also cited hyperscalers spending almost US$800 billion this year alone. For background on how public offerings work, read IPO Investing with M+ Global. The source names no Bursa-listed data centre stock, so Bursa investors tracking this theme will need to check listings directly. What is fuelling community pushback on data centres? On Oct 13, the BBC reported that 300 residents in Batam were furious that their taps had run dry. The data centres in Nongsa Digital Park appeared to have enough water to protect their machines from overheating. Project Jupiter, a US$165 billion campus in New Mexico, faced pushback over water use, carbon dioxide emissions and a lack of direct state revenue. On Oct 14, Oracle proposed an Energy Service Agreement with El Paso Electric to pay US$100 million over 10 years. BDx CEO Mayank Srivastava said costs were passed out of the community. 'Nobody was really thinking about aligning costs and incentives,' he said. How does macro pressure affect data centre financing? * The US Federal Reserve raised rates by 25 basis points to 3.75%-4%. * The 30-year US Treasury yield reached 5.67%, a 25-year high on Oct 7. * Oil prices are above US$100, feeding inflation. MUFG's Jean Monson said one August estimate put the AI factory financing need at US$7 trillion. A later report cited US$23 trillion. Key takeaways. * DayOne may delay or downsize its US IPO, raising US$2.5 billion (RM10.14 billion) to US$3 billion. * AirTrunk's S-REIT IPO was postponed, and Firmus Grid postponed its ASX IPO on Oct 8. * DayOne's US$82 million net loss in 1HFY2026 sits alongside a growing debt pile. * Community pushback in Batam and New Mexico is raising the cost of building data centres. This article is for information only and is not investment advice. Do your own research before making any investment decision. Frequently asked questions. Is DayOne Data Centers planning a US IPO? DayOne is weighing options for its US IPO, including a potential delay or size cut, according to Bloomberg. A smaller listing may raise US$2.5 billion (RM10.14 billion) to US$3 billion. How much did DayOne lose in FY2025? DayOne posted a US$369 million net loss for ordinary shareholders in FY2025. It recorded a further US$82 million net loss in 1HFY2026. Why was AirTrunk's S-REIT IPO postponed? Bloomberg reported on Oct 13 that the Singapore Exchange listing had been postponed. The Australian Financial Review said on Oct 3 that stock market volatility, the tech and AI sell-off and surging borrowing costs were factors. Does DayOne have data centres in Johor? Yes, DayOne has built campuses at Nusajaya Tech Park and Kempas Tech Park. It claims about 1.4gw of bookings from five global hyperscalers. Related guides Disclaimer: This article is for informational purposes only and does not constitute financial advice. Always do your own research before making investment decisions. Want to invest in Bursa Malaysia or US markets? Contact Dexter Chia, an AI Driven Remisier who has 2,300+ clients at Malacca Securities Sdn Bhd (M+ Global). M+ Global Invitation Code: UBZQ | WhatsApp: +60169059789 | Why Choose Dexter?
DayOne secures $237m bank loan for Hong Kong data center. Singapore-based DayOne Data Centers has secured a HK$1.86 billion (US$237 million) loan, or about US$237 million, to refinance and expand a Hong Kong data center, people familiar with the matter said. DBS, Oversea-Chinese Banking Corporation, United Overseas Bank, and Bank of East Asia provided the facility, the people said. DayOne is also planning a US initial public offering but is considering a delay or a smaller deal. The company has also held early talks with banks about a potential US$500 million bond sale. Baxtel lists DayOne's HK1 data center in Hong Kong, but the available material does not specify its capacity or whether it is operating. The financing follows DayOne's June 5, 2026 announcement that it closed a US$4.5 billion series C round, as AI-driven data center fundraising continues despite investor concerns about returns. Recent DayOne Data Centers developments. How would you feel if you could no longer use Tech in Asia? Share, tag us, and land on our Wall of! * Artificial Intelligence The lease covers US$19 billion and 401 megawatts of capacity. * Artificial Intelligence * Investments Why Hong Kong's next-gen wealth is chasing AI over property, and a look back at how family offices b... * Artificial Intelligence * Startups Entire competes with GitHub in hosting Git repositories, which store and track changes to code. Repo... * Insights * Investments Hong Kong family offices are dumping property for pre-IPO tech. An angel investing platform's CEO ex... * Crypto * Fintech The Japanese financial giant has spent hundreds of millions backing Southeast Asian fintech firms. N...
Johor weighs treating surplus water from data centre operations for public supply. 6 Nov 2026 By: IDCNOVA Region: Southeast Asia The Johor state government is exploring a plan to further treat surplus water from data centre-operated treatment plants and channel it to public consumption, as the Malaysian state grapples with balancing rapid digital infrastructure growth against pressure on its water resources. The proposal signals a potential new model in which hyperscale data centre operators not only reduce their draw on municipal supplies but also contribute treated water back to the community. Speaking at the inauguration of the Phase Two extension of the DayOne Kempas Tech Park Water Treatment Plant in Johor Baru on Thursday, Menteri Besar Datuk Onn Hafiz Ghazi said the state is examining ways to leverage technology and industry collaboration to improve water supply and ensure sustainable resource management. He noted that DayOne draws polluted water from Sungai Tebrau, treats it and uses it for its operations instead of relying on treated water intended for the public. The river carries a flow of about 80 million litres per day, while DayOne consumes a maximum of roughly 10 million litres per day, leaving a substantial surplus that could potentially be supplied to the public after an additional treatment process. Onn Hafiz said he has called for a technical meeting as soon as possible to assess the feasibility of the proposal. He also welcomed DayOne's adoption of a closed-loop cooling system, which recirculates water within its operations and improves efficiency. The Menteri Besar said the facility reflects the importance of developing sustainable infrastructure to support Johor's growing investment landscape, adding that by investing in its own water treatment infrastructure, DayOne is taking a proactive approach to meeting its operational requirements while reducing its reliance on the existing treated water supply network. The initiative underscores a broader shift in Southeast Asia's data centre boom, where operators are increasingly expected to demonstrate water stewardship alongside energy efficiency. If adopted, Johor's surplus-water proposal could offer a template for other fast-growing markets seeking to reconcile large-scale digital investment with scarce natural resources.
Johor eyes DayOne water plant for public supply. November 6, 2026 Updated:about 3 hours ago PETALING JAYA (Nov 6): Johor is exploring whether surplus treated water from DayOne's plant at Kempas Tech Park could undergo further treatment for public use, as the data centre operator expands the facility. The expansion will raise treatment capacity to 20 million litres per day (MLD), with the second phase expected to begin operating in the third quarter of 2027, state government news portal Media Digital Johor reported. Menteri Besar Datuk Onn Hafiz Ghazi has called for an immediate technical discussion involving DayOne, Permodalan Darul Ta'zim Sdn Bhd (PDT) and Ranhill SAJ to assess the public-supply proposal, according to Bernama. Speaking at an event for the plant's second-phase expansion on Thursday (Nov 5), he said DayOne treats polluted water drawn from Sungai Tebrau for its operations, reducing reliance on treated water supplies intended for the public, The Star reported. The newspaper quoted him as saying that surplus water could potentially be supplied to the public after an additional treatment process. He also welcomed the company's closed-loop cooling system, which recirculates water within its operations to improve efficiency. Media Digital Johor said the plant's first phase has been operating since March 2026, with capacity exceeding the campus's current requirements. This enables the campus to meet its data centre cooling needs without relying on drinking water from the municipal supply network, it reported. The plant uses locally developed ultrafiltration membrane technology to treat river water on site. The initiative involves cooperation and coordination with Ranhill SAJ, PDT and Johor Special Water, according to the portal. Any community use of surplus treated industrial water would remain subject to suitable treatment processes, standards and technical requirements, it added. Onn Hafiz said Sungai Tebrau has a flow of about 80 MLD, while DayOne's maximum consumption is around 10 MLD, Bernama reported. Those figures describe river flow and company consumption respectively, rather than the volume of surplus treated water available for public supply. The reports did not specify a confirmed public-supply volume, service area or commencement date. DayOne's river-water treatment approach comes alongside other alternative-water arrangements for Johor's data centre industry. In a media statement dated Aug 11, 2025, Indah Water Konsortium (IWK) said its collaboration with Johor Special Water involved supplying 12 MLD of treated sewage effluent to water reclamation plants serving Bridge Data Centres and Computility Technology. The statement also outlined a separate arrangement for Johor Special Water to supply an alternative water source directly to DayOne. IWK said the reclaimed-water initiative would support industrial cooling while reducing pressure on clean water resources. DayOne's Kempas system, by comparison, draws raw water from Sungai Tebrau for treatment. The infrastructure expansion accompanies further investment by the Singapore-based operator in Johor. Onn Hafiz said DayOne had realised about RM25 billion in investments in the state as at September, with the amount expected to reach RM28 billion by year-end, Bernama reported. He added that Johor would continue assessing data centre and artificial intelligence investments through a technical committee to safeguard the interests of the state and its residents. Related tags Johor DayOne water plant Follow EdgeProp. Follow its channels to receive property news updates 24/7 round the clock.
Google commits $15B to Malaysia expansion as first Data Centre goes live. Google's first Malaysia data centre at Elmina Business Park in Selangor is now operational (Image: Google) Google plans to invest $15 billion in Malaysian digital infrastructure over the next two years, expanding its data centre footprint as its first campus in the Southeast Asian country enters operation. The US tech giant announced the 2027-28 spending programme on Wednesday, with new campuses planned in Selangor and Negeri Sembilan alongside its now-operational facility at Elmina Business Park northwest of Kuala Lumpur. "Google is committed to growing our presence responsibly, delivering lasting value for Malaysia's economy and people," said Ruth Porat, president and chief investment officer of Google and parent company Alphabet. "This investment aligns with Malaysia's development priorities - providing the foundational computing capacity to deliver the upside of innovation across the country while adding local power and water resources as our operations scale." The programme expands on a $2 billion investment announced in May 2024, which included Google's first Malaysian data centre and cloud region at Sime Darby Property's Elmina Business Park. The initial commitment also covered AI literacy programmes for students and educators. Beyond Johor. Google's Malaysian cloud region remains upcoming, supported by computing capacity in Selangor. The company did not disclose the planned campuses' IT capacities. Sime Darby Property had already announced additional facilities for Google in December 2024, with construction targeted for completion in 2027. The build-and-lease agreement provided for a 20-year tenancy valued at up to MYR 5.6 billion ($1.2 billion at the time), with two five-year renewal options. Google subsequently extended its footprint south of Kuala Lumpur, with affiliate Pearl Computing Malaysia buying a 389 acre (157 hectare) site in Port Dickson from developer Gamuda for $105 million. The tech giant confirmed earlier this week that its planned Negeri Sembilan campus is at Springhill Industrial Park in Port Dickson, where Gamuda is developing both the computing facilities and shared water infrastructure. Other operators are also expanding around the capital. Singapore's DayOne Data Centers in August agreed to buy 78.8 acres in Selangor from Mah Sing Group for $153 million, adding a Greater Kuala Lumpur development foothold to its fast-growing Johor business. Bain Capital-backed Bridge Data Centres has a flagship campus planned for up to 1 gigawatt in the Kuala Lumpur area, chief investment officer Kevin Guan told Mingtiandi's Data Centre Forum last month. Johor nevertheless remains a major growth engine, with operational capacity rising 24 percent in the first half to 1,110 megawatts and vacancy tightening to 0.7 percent, according to Cushman & Wakefield figures cited during the session. Powering the buildout. Google's expansion includes plans to enable more than 1GW of new clean energy generation capacity on Malaysia's national grid. The company will also pay the direct infrastructure costs of connecting its campuses to the electricity network. The power commitments follow Google's announcement earlier this week of $160 million in funding for shared water infrastructure in Negeri Sembilan, supporting both its future data centre operations and local communities. Gamuda will build an off-river storage reservoir and water treatment plant in coordination with the state government and utility SAINS. The plant is designed to supply 65 million litres (17 million gallons) of potable water daily, while the reservoir will capture excess river flow and rainfall to help reduce flood risks. The completed facilities will be owned by statutory body MBINS. Infrastructure investment is also shaping competing developments. Bain's Bridge built wastewater treatment plants at its Johor site to use municipal wastewater instead of clean water, Guan said during the Data Centre Forum interview. He identified power, technology and funding as central challenges for the sector's next phase of growth. Resource demands are drawing greater scrutiny across Southeast Asia. Malaysia has introduced data centre power tariffs and limits on non-AI development, according to Goldman Sachs research, while Thailand last week advanced a proposed framework requiring developers to compete for electricity and water allocations through government-run pitching rounds.
Find jobs on Simplify and start your career today
Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs
Industries
Company Size
1,001-5,000
Company Stage
Debt Financing
Total Funding
$14.2B
Headquarters
Singapore, Singapore
Founded
2022
Find jobs on Simplify and start your career today
Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs