FFlexGen provides integrated energy storage solutions by designing and deploying battery energy storage systems (BESS) and pairing them with HybridOS, a proprietary software platform that manages and optimizes these assets. The product combines hardware and software to enable automated energy dispatch from batteries, solar/wind, and conventional generators to meet grid demands. It can manage a single site or an entire fleet of storage assets and delivers real-time data and performance analytics. Unlike competitors that may focus on either hardware or software alone, FlexGen offers a tightly integrated, software-first solution that coordinates multiple energy sources and storage assets in one system. Its goal is to support the energy transition by stabilizing the power grid, integrating renewable energy, and ensuring reliable power supply for utilities, independent power producers, and large industrial customers, while optimizing asset performance and cost for its customers.
Work here?Claim your company
Industries
Company Size
201-500
Company Stage
Debt Financing
Total Funding
$357.5M
Headquarters
Durham, North Carolina
Founded
2009
See people who can refer or advise you
Help us improve and share your feedback! Did you find this helpful?
Total Funding
$357.5M
Above
Industry Average
Funded Over
5 Rounds
FlexGen partners with Lightshift Energy on its 16 battery energy storage projects in PJM, ISO-NE. Six projects have been completed across Massachusetts and Virginia, with another ten under construction, reflecting growing collaboration spanning both new battery energy storage deployments and enhancement of existing assets. * Lightshift develops, owns, and operates the projects while FlexGen provides energy storage software and services, including its FlexGen HybridOS(R) energy management system (EMS). * More than 25MW/85MWh of energy storage already operating in PJM and ISO-NE strengthens local grid reliability and helps lower costs during high-demand periods. * FlexGen's advanced, flexible energy storage software and services enable Lightshift to deploy new assets and modify existing ones as project or grid needs evolve over time. DURHAM, N.C.-(BUSINESS WIRE)-FlexGen Power Systems, LLC. ("FlexGen"), a leading battery energy storage system and energy management software provider, together with Lightshift Energy, a battery storage developer, today announced the continued expansion of their partnership for energy management systems across 16 battery energy storage system (BESS) projects in Massachusetts, Virginia, and Vermont. Six projects have been completed to date, delivering more than 25MW/85MWh of flexible storage capacity to local grids and communities, with another ten projects that will deliver over 55MW/200MWh under construction. FlexGen and Lightshift first partnered in 2024 on the deployment of FlexGen's HybridOS(R) energy management system (EMS) at Lightshift's battery storage project in Groton, MA. Strategically located next to a local substation, the site provides targeted grid support through peak shaving during high-demand periods, bolstering energy reliability and lowering energy costs for the surrounding community. Since then, Lightshift has selected FlexGen's HybridOS for additional projects spanning diverse use cases, battery manufacturers, and utility customers. "Across New England and the PJM region, growing energy demand is driving utilities to explore solutions to strengthen their local grids while reducing costs for residents," said Joe Leavitt, Chief Technology Officer at Lightshift Energy. "Our work with FlexGen has created a strong model for the deployment of battery storage assets across sites with various technologies and unique needs. As we expand our portfolio, we look forward to building on that successful track record as we continue to help utility partners meet growing demand, manage costs for the communities they serve, and strengthen grid reliability and resilience." FlexGen and Lightshift Expand Scope of Partnership with BESS Upgrade The companies have recently expanded the scope of their work together by completing a comprehensive integration of FlexGen's EMS at Lightshift's BESS facility in Danville, Virginia. The Danville BESS site provides flexible capacity to Danville Utilities to support peak shaving and demand response programs during periods of high demand. By executing a complex upgrade of the battery management system (BMS) and EMS and augmenting the site with additional batteries, FlexGen and Lightshift enhanced the site's capacity by 14%, delivering additional grid stability and extending the energy storage asset's lifespan. "It's no longer just about building more battery projects. Meeting our energy needs will require getting more from the assets we already have," said Jason Abiecunas, Executive Vice President of Business Development at FlexGen. "That means finding ways to extend asset life, unlock additional capacity, and ensure we're maximizing the value provided by each site. We're proud of what we've accomplished through our work with Lightshift and look forward to growing that partnership." FlexGen and Lightshift Continue to Grow Partnership with New Projects With the successful EMS partnership on six projects to date, FlexGen and Lightshift plan to continue growing their portfolio of work together through additional projects, such as Danville II, a second 11MW project with Danville Utilities that will act as a peak shaving asset and build on the city's commitment to reducing energy costs for its residents and supporting regional load growth. FlexGen HybridOS will serve as the EMS for the additional ten projects under construction, delivering optimized uptime, performance, and reliability. The software is compatible with 80+ configurations of top-tier batteries and power conversion systems (PCS). Designed to be modular and scalable, FlexGen HybridOS gives operators flexibility over software configurations to meet a wide variety of site, hardware, and regulatory-specific requirements. About FlexGen Power Systems, LLC. FlexGen provides software and services for deploying, managing, and optimizing battery energy storage systems. FlexGen leverages more than 15+ years of software, engineering, and procurement expertise to solve today's toughest energy challenges that enable the transition to a modern electric grid. FlexGen HybridOS(R) energy management software integrates with battery OEMs and offers advanced analytics and AI-driven insights that allow energy storage owners to deploy diverse power market strategies and integrate various generation forms, enhancing grid stability and economic returns. Serving more than 25+ GWh and over 200 energy storage systems enabled by FlexGen, Offshore Source is trusted by the most technically and commercially demanding developers, utilities, government agencies, and industrial companies worldwide. About Lightshift Energy. Lightshift Energy is a utility-scale energy storage developer, owner, and operator headquartered in Arlington, Virginia. Founded in 2019, the company develops impactful standalone energy storage projects that deliver value through advanced analytics and multi-use applications. Through its portfolio approach, Lightshift blends the benefits of transmission scale capacity with local grid resources through aggregation, maximizing value for utility partners and their customers while investing downstream in communities for their direct benefit. For more information, please visit www.lightshift.com. Read the Article on Business Wire: Read More Posted By OffshoreSource
US battery storage reached 52 gigawatts at mid-year; developers have 54 GW more on order through 2028. US utility-scale battery storage capacity reached nearly 52 gigawatts (GW) by the end of June 2026, the Energy Information Administration reported last month, capping three consecutive years in which the sector expanded at an average annual rate of 70 percent. Operators have reported plans to the EIA for another 54 GW of capacity to come online through the end of 2028, a pipeline that, if completed on schedule, would push total national nameplate capacity past 105 GW. Three years of rapid expansion. Utility-scale battery storage capacity in the United States grew at an average annual rate of 70 percent over the last three years, according to the EIA. By the end of 2025 the US power system had 43.6 GW of operational capacity. During the first six months of 2026 alone, operators added another 8.3 GW, bringing the nameplate total to nearly 52 GW, based on the EIA's latest Preliminary Monthly Electric Generator Inventory. Operators anticipate bringing an additional 54 GW of battery storage capacity online over the next two and a half years, according to plans they report to the EIA. Of that total, 14 GW is expected in the second half of 2026 alone. The pipeline breaks down to 26 GW planned for 2027 and 14 GW for 2028, with total national operational capacity expected to pass 105 GW by the end of 2028 if those schedules hold. Projects coming online now. Developer SMT Energy and software-focused storage integrator FlexGen announced the start of operations of a 160 MW/320 MWh energy storage facility in Houston, Texas, adding to a state grid that has emerged as the country's most active market for large-scale storage deployment. The Houston project, known as SMT Houston IV, joins more than 12 projects from SMT and FlexGen built to support the Electric Reliability Council of Texas (ERCOT) grid. The facility is one of several standalone projects entering service across ERCOT as the Texas grid balances rapid load growth with an expanding fleet of solar generators. Solar photovoltaic plants host the largest battery storage capacity units, including AES' Bellefield Solar and Energy Storage Farm in California and Florida Power & Light's Manatee Solar Energy Center in Florida, according to the EIA. The Gemini Solar + Energy Storage project in Nevada, which became fully operational in 2024, carries 690 MW of photovoltaic capacity paired with a 380 MW battery storage system providing 1,400 MWh of dispatchable energy. What is driving the buildout. Battery storage has expanded in close step with utility-scale solar, absorbing midday generation surpluses and dispatching power during the evening demand peaks that solar cannot reach. The EIA pegs utility-scale battery storage growth at an average annual rate of 70 percent over the last three years, driven by rapid utility-scale solar deployment and wholesale price arbitrage, a pace that has outstripped earlier projections and reshaped how grid operators plan their capacity reserves. New federal rules have made domestic supply-chain compliance a condition of tax credit eligibility for storage projects, and a live FERC proceeding is poised to reshape the economics of co-located storage. Import tariffs have raised equipment costs for some developers. Those pressures have not yet slowed the installation pace, though developers and lenders are watching how the FERC proceeding resolves for projects that pair storage directly with data center loads. The DOE's $500 million initiative is aimed partly at reducing the cost exposure that tariffs have created, targeting domestic production of the minerals and cell components that underpin the growing grid fleet. ERCOT has emerged as the country's most active storage market, and analysts project continued rapid expansion there through 2027 as the Texas grid absorbs load growth and integrates increasing volumes of solar generation. Market implications. The EIA's planning filings point to another 54 GW expected online over the next two and a half years. If that pipeline is completed as planned, operational US battery storage capacity would climb past 105 GW by the end of 2028. That trajectory would represent a roughly sixfold increase in battery storage capacity in just four years, a shift that industry analysts say is beginning to move beyond a technology story into a wholesale electricity pricing story. The EIA's long-term outlook identified data-center and EV load as the structural demand drivers that will sustain electricity growth through 2050, a context that gives the storage pipeline its commercial logic: operators need dispatchable assets to cover peaks that are growing faster than traditional baseload additions can match. The agency's next Short-Term Energy Outlook update is expected to reflect any further revisions to the storage build schedule as fall demand data comes in. Hugo Rojas is the editor of GCN. With a Master of Science in Engineering, he specializes in technology, data, and science, and brings a human-centered perspective informed by psychology.
SMT ENERGY SMT Energy and FlexGen Deliver Battery Storage Project in Six Weeks in ERCOT. September 10, 2026 SMT Energy, LLC, ("SMT Energy"), with FlexGen software and project delivery services, announced today (Sept 9) the operational start of a 160-MW utility-scale battery storage facility in Houston, Texas, marking a significant milestone in activating energy infrastructure at speed, which is needed for grid reliability and energy affordability. SMT Energy, a developer and operator of renewable energy and energy storage projects, partnered with FlexGen Power Systems, LLC ("FlexGen"), a leading provider of energy storage solutions and software technology, to commission the project in just six weeks, cutting the time of deployment by 3x from the original timeline. The project's accelerated timing and successful operation reflect SMT Energy and FlexGen's long-standing partnership and expertise in developing and commissioning reliable energy infrastructure. This summer, ERCOT has experienced record demand and is preparing for continued rapid load growth, underscoring the urgent need for additional battery storage. Houston IV joins over a dozen projects built and commissioned by SMT and FlexGen that actively support the ERCOT grid, totaling more than 300 MW of battery storage capacity. Irby Construction Company served as the engineering, procurement, and construction (EPC) partner and worked closely with SMT and FlexGen to bring Houston IV online and help meet Texas's growing electricity needs. "Projects like Houston IV don't get built from behind a desk. They get built in the field by men and women showing up every day, working long hours, solving problems, and getting the job done," said Henry Hernandez, Director of Construction at SMT Energy. "I'm proud of what this team accomplished, but I'm even more proud that we did it without losing sight of safety or quality. Houston IV turned on faster than any other battery storage plant in our history because there was quality at every stage, from procurement to commissioning. FlexGen's One-Touch Commissioning deployment method, powered by its software, is critical to delivering the reliability customers should expect from their batteries." FlexGen's One-Touch Commissioning(R) process consistently delivers installations faster than the industry average because its systems are pre-configured in a lab, remotely assisted in real time by a Remote Operations Center (ROC), and executed by a dedicated field commissioning team. With more than 15-plus years of operations, backed by software, 24/7 remote management from the ROC, and a 150-plus field team, FlexGen turns batteries on efficiently and keeps them running effectively. "Making a meaningful difference for the grid and our growing energy needs requires speed and excellence at every stage, from development and engineering through procurement, construction, commissioning, and ongoing operations," said Jason Rislov, Senior Vice President of Operations at FlexGen. "FlexGen's distinctive combination of software automation, our remote operations center, and on-the-ground field expertise all work together to accelerate battery deployment. What used to take 25-plus weeks took us six. That time saved translates directly into giving the grid and consumers what they need most right now: a more reliable, resilient energy system." "Bringing a 160-MW battery storage facility online in just six weeks required disciplined planning, seamless coordination, and an unwavering focus on safety and quality," said Shaun Coleman, Project Manager at Irby Construction. "The SMT Energy, FlexGen, and Irby Construction teams coordinated engineering, procurement, and construction to keep every workstream aligned, identify challenges early, and maintain safety and quality at an accelerated pace. That integration is critical, not only to delivering projects quickly, but also to ensuring battery storage facilities perform reliably over the long term." About FlexGen Power Systems, LLC. FlexGen provides industry-leading software and services for deploying, managing, and optimizing battery energy storage systems. FlexGen leverages decades of software, engineering, and procurement expertise to solve today's toughest energy challenges that enable the transition to a modern electric grid. FlexGen HybridOS(R) energy management software seamlessly integrates with any battery OEM and offers advanced analytics and AI-driven insights that allow energy storage owners to deploy diverse power market strategies and integrate various generation forms, enhancing grid stability and economic returns. Serving more than 25 GWh and over 200 energy storage systems enabled by FlexGen, Jaguar Expo Inc is trusted by the most technically and commercially demanding developers, utilities, government agencies, and industrial companies in the world. About SMT Energy, LLC. SMT Energy is a U.S.-based developer and operator of distributed generation and utility-scale renewable and energy storage projects. The company is led by industry veterans John Switzer and David Spotts. In its first three years, SMT Energy has transacted with institutional investors, independent power producers, sustainable infrastructure funds and other sustainable investors on $250 million worth of renewable energy and energy storage deals. The company relies on their deep experience, wide network, and strong problem-solving abilities to create above-market returns for investors and meaningful benefits for local and global communities. About Irby Construction Company. Irby Construction, a Quanta Services company, is a leading provider of electric infrastructure solutions based in Richland, Mississippi. With over 80 years of experience, Irby Construction is known for performing some of the industry's largest and most complex electric power infrastructure projects. Irby specializes in transmission, substation, distribution, and Battery Energy Storage System (BESS) construction across the U.S.
FlexGen Power Systems, a battery energy storage solutions provider, has launched international operations in Europe to meet growing demand for grid-scale storage. The company will offer its energy management system, including power plant controls and analytics, alongside lifecycle services to improve operational performance for battery storage developers. Managing Director Mike Wallace said the expansion addresses Europe's rising energy prices, high curtailment rates and increasing electrification demands. FlexGen has secured projects across the UK, Finland and Sweden to store excess renewable energy and discharge during peak demand. The company's HybridOS software is hardware-agnostic and provides AI-driven insights for power market strategies. When paired with lifecycle services, it can deliver 99% availability at site level. FlexGen currently serves over 25 GWh across 200-plus energy storage systems in more than 10 countries.
FlexGen Power Systems has acquired Clean Energy Services (CES), a provider of battery energy storage and utility-scale solar services. The deal strengthens FlexGen's battery storage leadership by adding CES's commissioning and lifecycle service capabilities to its existing software offerings. Founded in 2022, CES will operate as a FlexGen subsidiary whilst maintaining its existing customer base. CES brings over 125 field technicians and engineers, having commissioned more than 15GWh of battery storage systems and servicing over 1GW of solar and 4.5GWh of battery assets. The acquisition enables FlexGen to offer integrated solutions combining its HybridOS energy management software with CES's field service expertise. CES will continue operating its remote operations centre in Houston, whilst FlexGen maintains its Durham facility, together providing 24/7 monitoring across their combined portfolios.
Find jobs on Simplify and start your career today
Industries
Company Size
201-500
Company Stage
Debt Financing
Total Funding
$357.5M
Headquarters
Durham, North Carolina
Founded
2009
Find jobs on Simplify and start your career today