HHilcorp is a large private oil and natural gas company in the United States. It buys, develops, and operates oil and gas assets to keep production high and profits steady, mainly in U.S. markets that serve industrial, commercial, and residential customers. How does its product work? Hilcorp extracts hydrocarbons from prolific fields and sells the oil and gas it produces to various buyers; its processes focus on improving efficiency and optimizing output from existing assets. How is Hilcorp different from competitors? It is privately held, emphasizes acquiring and optimizing legacy wells, and is known for its award-winning workplace culture, competitive pay, and a strong focus on corporate social responsibility through its Giving Program, which has donated over $15.5 million to nonprofits across the United States. What is its goal? To maximize production and profitability from oil and gas assets while maintaining responsible practices and community support.
Work here?Claim your company
Industries
Company Size
1,001-5,000
Company Stage
N/A
Total Funding
N/A
Headquarters
Houston, TX
Founded
1989
See people who can refer or advise you
Help us improve and share your feedback! Did you find this helpful?
MEA, ENSTAR and Hilcorp sign gas exchange agreement to enhance regional winter reliability and reduce costs for MEA members. Last Updated: October 21, 2026 PALMER, Alaska - Matanuska Electric Association (MEA), ENSTAR Natural Gas Company (ENSTAR), and Hilcorp Alaska (Hilcorp) have signed a gas exchange agreement involving 1.2 billion cubic feet of natural gas that will help support regional winter energy reliability while providing approximately $2 million in estimated savings for MEA members, subject to regulatory approval and implementation. Under the agreement, gas volumes already under contract to MEA but not required for its near-term generation needs will be made available to ENSTAR to help address regional winter supply challenges. ENSTAR will return equivalent gas volumes to MEA no later than March 31, 2028. The agreement is expected to provide approximately $1.3 million in avoided carrying costs that benefit MEA's base rates and an additional $700,000 in Cost of Power Adjustment savings through avoided gas storage injection fees. The COPA is the portion of members' electric bills that reflects fuel and purchased power costs - MEA's largest expense, accounting for about 35 cents of every dollar the cooperative spends. These savings are expected to be realized between 2027 and 2029. "This agreement demonstrates how utilities can work together to address regional energy challenges while delivering value to the people we serve," said Tony Izzo, CEO of MEA. "By making use of gas volumes that are not needed for MEA's near-term operations, we can support regional winter reliability, make more efficient use of existing energy infrastructure, and reduce costs for our members." The agreement reflects a collaborative effort among Southcentral Alaska energy providers to maximize the use of existing Cook Inlet gas resources and storage infrastructure during a period of continuing regional gas supply constraints. The fully executed agreement has been submitted by ENSTAR to the Regulatory Commission of Alaska for review with a request for expedited consideration. MEA has secured 100% of the natural gas needed to serve its members this winter, and this agreement will not affect MEA's ability to generate the power its members rely on. During prolonged extreme cold, the regional natural gas system can face challenges delivering enough gas at the pressure needed to meet heating and electricity demand. By increasing gas available to the regional energy system during periods of peak winter demand, this agreement is expected to help reduce the likelihood of conditions that could require rolling service interruptions. While no single agreement eliminates that possibility, this is another step utilities are taking together to help keep homes warm and power reliable this winter.
San Juan Basin Royalty Trust declares no cash distribution for October 2026. PR Newswire Today at 6:25am PDT DALLAS, Oct. 20, 2026 /PRNewswire/ - Argent Trust Company, as the trustee (the "Trustee") of the San Juan Basin Royalty Trust (the "Trust") (NYSE: SJT), today reported that it will not declare a monthly cash distribution to the holders of its units of beneficial interest (the "Unit Holders") due to excess production costs incurred during prior periods for the Trust's royalty interest burdening the subject interests ("Subject Interests"), as well as continued low natural gas pricing. Excess production costs occur when production costs and capital expenditures exceed the gross proceeds for a certain period. The balance of cumulative excess production costs is currently approximately $12,423,018 gross ($9,317,264 net to the Trust), a decrease in the deficit of $130,448 gross ($97,836 net to the Trust) from last month's reporting period. Hilcorp will continue to charge the balance of excess production costs to the Trust's net proceeds each month. Until the balance is paid in full, the Trust will not receive royalty income as all net proceeds will be applied to the balance of excess production costs. No cash distributions will be made by the Trust until future net proceeds are sufficient to (a) repay the balance of excess production costs, accrued as a result of Hilcorp San Juan L.P.'s drilling of two new horizontal wells in 2024, (b) replenish a reserve in the amount of $2,000,000, and (c) repay the principal and interest on the Trust's line of credit at Texas Bank ("Line of Credit"), after which time, the Trust will resume distributions of the royalty income to the holders of the Trust's units of beneficial interest. Hilcorp reported $4,868,781 of total revenue from the Subject Interests for the production month of August 2026, consisting of $4,688,244 of gas revenues, and $180,537 of oil revenues. For the Subject Interests, Hilcorp reported $4,738,333 of production costs (excluding the balance of excess production costs) for the production month of August 2026, consisting of $2,899,702 of lease operating expenses, $317,045 of severance taxes, and $1,521,586 of capital costs. Based upon information provided to the Trust by Hilcorp, gas volumes for the Subject Interests for August 2026 totaled 2,057,618 Mcf (2,286,242 MMBtu), as compared to 2,046,556 Mcf (2,273,951 MMBtu), for July 2026. Dividing gas revenues by production volume yielded an average gas price for August 2026 of $2.28 per Mcf ($2.05 per MMBtu), an increase of $0.27 per Mcf ($0.24 per MMBtu) as compared to the average gas price for July 2026 of $2.01 per Mcf ($1.81 per MMBtu). This month's Trust administrative expenses totaled $80,118. The increase in administrative expenses was attributable to differences in timing of the receipt and payment of certain expenses by the Trust. Interest income in the amount of $17 and a draw of $80,101 from the Line of Credit will be used to pay the balance of Trust administrative expenses for the month of October which will bring the outstanding principal balance on the Line of Credit to $1,155,501. Pursuant to the Amended and Restated Royalty Trust Indenture, dated December 12, 2007 (as amended on February 15, 2024, by the First Amendment to the Amended and Restated Royalty Trust Indenture), the Trustee is authorized to retain, in its sole discretion, a cash reserve for payment of Trust liabilities that are contingent or uncertain or otherwise not currently due and payable. Cash reserves were utilized to pay interest accrued on the Line of Credit each month from July 2025 through May 2026. The balance of cash reserves maintained by the Trust is unchanged from the prior month, and is currently $3,891. Production from the Subject Interests continues to be gathered, processed, and sold under market sensitive and customary agreements. The Trustee continues to engage with Hilcorp regarding its ongoing accounting and reporting to the Trust, and the Trust's third-party compliance auditors continue to audit payments made by Hilcorp to the Trust, inclusive of sales revenues, production costs, capital expenditures, adjustments, actualizations, and recoupments. The Trust's auditing process has also included detailed analysis of Hilcorp's pricing and rates charged. As previously disclosed in the Trust's filings, these revenues and costs (along with all costs) are the subject of the Trust's ongoing comprehensive audit process by the Trust's professional consultants and outside counsel to analyze compliance with all the underlying operative Trust agreements and evaluate potential remedies in the event there is suspected non-compliance. As of October 20, 2026, the Trust will resume distributing monthly press releases via wire. The Trust will continue to furnish unitholders with information through its website and Form 8-K filings with the Securities and Exchange Commission, which are available at www.sec.gov. If anyone would like to receive the press release via email, please contact the Trustee to be placed on the monthly press release email list. Forward Looking Statements. Except for historical information contained in this news release, the statements in this news release are forward-looking statements that are made pursuant to the Safe Harbor Provisions of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements generally are accompanied by words such as "estimates," "anticipates," "could," "plan," or other words that convey the uncertainty of future events or outcomes. Forward-looking statements and the business prospects of San Juan Basin Royalty Trust are subject to a number of risks and uncertainties that may cause actual results in future periods to differ materially from the forward-looking statements. These risks and uncertainties include, among other things, certain information provided to the Trust by Hilcorp, volatility of oil and gas prices, governmental regulation or action, litigation, and uncertainties about estimates of reserves. These and other risks are described in the Trust's reports and other filings with the Securities and Exchange Commission. Argent Trust Company, Trustee Nancy Willis, Director of Royalty Trust Services Toll-free: (855) 588-7839 Fax: (214) 559-7010 SOURCE San Juan Basin Royalty Trust This is a paid placement. For further inquiries, please contact PR Newswire directly.
Hilcorp seeks to expand Beluga natural Gas Storage. Hilcorp Alaska is seeking permission to build a roughly 7.4-acre gravel pad near Beluga that would support expanded natural gas storage, a project requiring the permanent filling of 2.35 acres of wetlands on Cook Inlet's west side. The Alaska Department of Environmental Conservation opened a public comment period October 7 on the project's water quality certification. Comments are due November 6, and a separate U.S. Army Corps of Engineers review has an October 30 deadline. The proposed Beluga River Gas Storage Pad would sit north of Chugach Electric Association's power plant, approximately 35 air miles from Anchorage, within the Kenai Peninsula Borough. Hilcorp's application identifies the site as Chugach property. The pad would be designed to accommodate as many as 10 storage wells and associated surface facilities in later phases. Those facilities are outside the current application, however, and would not be permitted or constructed as part of this stage. The documents do not specify the eventual storage capacity. Federal regulators are processing the application under special emergency procedures tied to Executive Order 14156, which declared a national energy emergency. In its notice, the Corps says the project qualifies for that process to address an energy supply situation requiring action sooner than normal permitting procedures would allow. The emergency designation does not constitute a permit approval. The Corps says its decision will weigh the project's benefits against foreseeable harm, including cumulative effects on wetlands, wildlife, water quality, and other public interests. Hilcorp proposes placing about 17,682 cubic yards of clean gravel into wetlands as part of constructing the pad. Gravel would come from an existing permitted source, and crews would work from existing roads and infrastructure to limit additional disturbance. The wetlands include areas dominated by shrubs and trees. Surveyors also identified a small stream flowing south through the surveyed area, and the preferred layout was selected in part to avoid it. A September alternatives analysis prepared for Hilcorp by ASRC Consulting & Environmental Services examined four construction layouts and a no-build option. It favored the proposed site west of the Beluga Highway because it uses existing development and, according to the analysis, reduces gravel requirements and environmental impacts. Rotating the pad would place its footprint over the stream. Moving it north would require more gravel without reducing wetland impacts, the analysis found. Another location lacked sufficient environmental and cultural-resource information for a direct comparison. Leaving the site undeveloped would cause the least wetland disturbance but would not meet Hilcorp's storage objectives. Hilcorp is not proposing additional compensatory mitigation for the permanent wetland loss. The company argues that aquatic impacts would be minor overall, citing a total project footprint covering about 0.02% of the roughly 46,582-acre Indian Creek-Frontal Cook Inlet watershed. The project description places the proposed fill within 500 feet of Beluga Power Plant Creek, which supports fish that migrate between fresh and salt water. Hilcorp says it would not place fill in that creek. Proposed protections include silt fencing, erosion controls, dust suppression, and stabilization of disturbed areas. The Corps could still require compensation for wetland impacts. Hilcorp says it would work with the agency on a practicable solution if that occurs. The application lists an estimated construction window of October 26 through April 30, 2027, but Hilcorp says the schedule depends on permits, weather, and gravel placement conditions. The listed start precedes both comment deadlines. DEC will determine whether the activity meets applicable water quality requirements and may approve certification, impose conditions, deny it, or waive certification.
South Korea takes steps toward potential Alaska LNG investment. The South Korean government has agreed to continue working with the United States government on a potential investment in the Alaska LNG project by the major gas-importing country, as part of their trade deal. President Donald Trump said on his Truth social media platform on Wednesday the two countries "agreed to commence working together on the 50 Billion Dollar ALASKA LNG PROJECT". Lead developer Glenfarne Group LLC pegged the South Korean investment at over $50 billion. Seoul, however, has not announced a definitive figure. "The United States and Korea have agreed to commence working on the Alaska LNG project, subject to meeting commercial reasonableness under the Strategic Investment MOU and all applicable domestic legal requirements", said a statement posted on the U.S. Commerce Department's website, referring to a broader 2025 agreement for South Korean investment in U.S. energy projects. "In developing the project, the United States will facilitate the favorable involvement of Korean vendors and suppliers. The United States intends to provide assurances, to the extent possible, regarding offtake agreements at economically viable prices granting Korea priority access to Alaska LNG produced by this project". South Korean President Lee Jae-myung said on X, as translated from Korean, "Regarding the Alaska LNG project among the investment projects announced by the U.S., it was decided to commence working on the preconditions that 1) commercial viability is confirmed and 2) it complies with South Korean legal procedures". Alaska LNG holds an Energy Department permit to export 20 million metric tons per annum of LNG, or 2.55 billion cubic feet a day of natural gas equivalent according to Alaska LNG, to both FTA and non-FTA countries. The project secured authorization November 2014 for the portion for countries with a free trade agreement (FTA) with the U.S. and August 2020 for the non-FTA portion. On December 11, 2025 the Federal Permitting Improvement Steering Council announced the completion of permit renewal for the project, which would process gas from the North Slope for both the domestic and overseas markets, following a review of environmental opinions. New York City-based Glenfarne said in a press release Wednesday it will "work with the U.S. and Korean governments to finalize the investment structure and complete the remaining steps required to reach FID". "Today's announcement brings together the capital needed to accelerate Alaska LNG to a final investment decision and construction", said Glenfarne chief executive and founder Brendan Duval. Alaska LNG is planned to proceed in two phases. The first phase would supply gas to the domestic market via a pipeline to the Anchorage region. Earlier this year ConocoPhillips signed a long-term deal to supply gas produced on Alaska's North Slope to the state under phase 1 of Alaska LNG. With the 30-year "gas sales precedent agreement" with Houston, Texas-based ConocoPhillips, "Alaska LNG has now secured precedent agreements for sufficient volumes to support a Phase One final investment decision and supply enough natural gas to meet Alaska's energy needs", Glenfarne announced May 18. "Alaska LNG now has agreements with all three major North Slope producers: ConocoPhillips, ExxonMobil (NYSE: XOM), Hilcorp Alaska, as well as Great Bear Pantheon LLC, a wholly owned subsidiary of Pantheon Resources plc (AIM: PANR)", Glenfarne added. Glenfarne previously said it aims to mechanically complete the 739-mile, 42-inch pipeline 2028 and start gas delivery 2029. Alaska LNG's phase 1 would "strengthen long-term energy security and address looming supply shortfalls resulting from declining Cook Inlet production", Glenfarne said, announcing the agreement with ConocoPhillips. "Phase 2 will add the LNG export facilities in Nikiski", Glenfarne added. For the overseas portion of Alaska LNG's production, Glenfarne has announced preliminary long-term agreements with Taiwan's state-owned CPC Corp, Japan's JERA Co Inc and Tokyo Gas Co Ltd, South Korea's POSCO International Corp, Thailand's state-owned PTT Exploration and Production Public Co Ltd and France's TotalEnergies SE. Announcing the latest offtake agreement February 26, 2026, Glenfarne said it "intends to contract 80 percent, or 16 MTPA [million metric tons per annum], of Alaska LNG's 20 MTPA volume to finance the project and now has 13 MTPA accounted for under preliminary long-term agreements with TotalEnergies, JERA, Tokyo Gas, CPC, PTT and POSCO". At the end of 2025 Sydney, Australia-based Worley Ltd completed "engineering work sufficient for a final investment decision", Glenfarne said January 22, 2026. The January announcement also said Glenfarne has provisionally selected Worley for engineering, procurement and construction management services for Alaska LNG. The update also announced conditional awards for pipe supply and construction. On November 10, 2025 Glenfarne said it had contracted Baker Hughes to supply refrigerant compressors and power generation equipment for Alaska LNG. Baker Hughes has also committed to investing in Alaska LNG. Glenfarne took over Alaska LNG last year as lead developer. The state government's Alaska Gasline Development Corp retains 25 percent.
The North Trading Bay sheen reinforces the need to dismantle retired oil & gas infrastructure. This is one more reminder of why having oil and gas in its backyard is a liability to the marine ecosystems Inletkeeper rely on for its livelihoods and wellbeing. Enough is enough. Inletkeeper has to start holding oil & gas operators in Cook Inlet accountable for dismantling retired infrastructure. FOR IMMEDIATE RELEASE: 8/25/2026 MORE INFORMATION: Satchel Pondolfino, Clean Water Lead, 907-235-4068 x26 The North Trading Bay sheen reinforces the need to dismantle retired infrastructure. HOMER, AK - Cook Inletkeeper calls for the relevant authorities to continue investigating the source and cause of the sheen observed in the North Trading Bay area on August 24. This incident shows the risk of allowing half-century-old oil and gas infrastructure to remain standing indefinitely in its waters. Hilcorp's Spark platform, installed in 1967 and inactive since 1992, has been identified as a probable source of the unknown pollutant. This warrants that state agencies conduct a thorough inspection of the Spark platform, its neighbors, and associated pipelines. This should include the integrity of all shut-in wells in the vicinity, if those wells cannot be ruled out as a source of the sheen. Cook Inletkeeper applauds the citizen pilot who alerted officials to the oil sheen stretching five miles across Cook Inlet. "This is one more reminder of why having oil and gas in our backyard is a liability to the marine ecosystems we rely on for our livelihoods and wellbeing," said Satchel Pondolfino, Inletkeeper's Clean Water Lead. "Enough is enough; we have to start holding operators accountable for dismantling retired infrastructure. Hilcorp, the owner of the Spark platform and 15 of the 17 in Cook Inlet, has a well-documented business model of buying old equipment and cutting corners to increase production - a business practice that has resulted in an egregious track record of environmental and safety violations. Though the official source is still in question, this week's spill is another example of the threat aging infrastructure poses to Cook Inlet's fish, wildlife, and coastal communities, and of the need for owners to take responsibility." The State of Alaska has every authority to enforce the dismantling, removal, and remediation of old platforms but has never once required an oil and gas operator to do so, despite the risks, maintenance needs, and the fact that cleanup costs increase significantly the longer they remain inactive. Yesterday's spill is just the latest warning. As Hilcorp's abandoned infrastructure continues to rot, more leaks and spills are inevitable. These disasters are not accidents - they are the direct result of neglect and entirely preventable. Dismantlement has been delayed long enough. "Hilcorp enjoys a free pass in Cook Inlet. While most oil and gas companies pay their fair share, Hilcorp dodges state corporate income tax entirely. They get a Clean Water Act exemption, dumping toxic drilling muds and polluted water straight into Tikahtnu. To top it off, state regulators keep letting Hilcorp put off cleaning up their old, dangerous infrastructure, leaving Alaskans to shoulder the risk," said Bridget Maryott, Inletkeeper's Co-Executive Director. This spill comes at a time when Cook Inlet is slated for extensive lease sales in the federal waters of the lower inlet. The One Big Beautiful Bill Act (OBBBA) mandated six new offshore oil and gas lease sales in Cook Inlet, through 2032. While the first of these lease sales, held on March 4, 2026, raised $0 and drew no bids, the Trump administration is proposing five additional lease sales in the Inlet, in addition to the five mandated by the OBBBA, as part of its proposed offshore drilling leasing schedule. Continuing to build out oil and gas infrastructure in Cook Inlet amplifies the risk of leaks, spills, and continued toxic dumping. About Cook Inletkeeper: Cook Inletkeeper is a community-based non-profit organization that advocates for clean water and lands for all, protecting Alaska's Cook Inlet | Tikahtnu watershed and the life it sustains.
Find jobs on Simplify and start your career today
Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs
Industries
Company Size
1,001-5,000
Company Stage
N/A
Total Funding
N/A
Headquarters
Houston, TX
Founded
1989
Find jobs on Simplify and start your career today
Don't see your dream role? Check out thousands of other roles on Simplify.Browse all jobs