Van Oord

Van Oord

Dredging, infrastructure, and offshore energy contractor

Overview

Van Oord is a global marine contractor focusing on dredging, infrastructure projects and offshore energy work. It uses specialized ships, dredging equipment, and engineering expertise to move and protect earth along coastlines and at sea, enabling port development and offshore installations. The company stands out through its family-owned, long-term approach, hands-on leadership, and a teamwork culture under the banner “One Team, worldwide,” backed by 155 years of project experience. Its goal is to provide practical, dependable maritime solutions that support rising population and energy demand while protecting coastlines and ensuring safe, efficient global trade.

Significant Headcount Growth

About Van Oord

Simplify's Rating
Why Van Oord is rated
B-
Rated B on Competitive Edge
Rated B on Growth Potential
Rated C on Differentiation

Industries

Industrial & Manufacturing

Government & Public Sector

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Rotterdam, Netherlands

Founded

1868

Get referred to Van Oord

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ecowende began turbine installation in May 2026, extending Boreas utilization through year-end.
  • Roberts Bank Terminal 2 selected TerraMarine in July 2026, opening mid-2030s Canadian megaproject revenue.
  • England's Environment Agency awarded Van Oord a £1.23 billion beach-management framework through 2034.

What critics are saying

  • CSL OWL launched Rock Star in 2026, challenging Van Oord's rock-installation pricing and utilization.
  • Vindnes and Vestnes deliver only in 2028 and 2029, leaving capacity gaps and dependence on Boreas.
  • Van Oord faces claims and investigations; offshore wind auction cancellations can strand expensive vessels.

What makes Van Oord unique

  • Van Oord pioneered subsea rock installation since the 1970s, building unmatched flexible fallpipe expertise.
  • Boreas and new Vindnes/Vestnes vessels target offshore wind, interconnectors, and critical energy infrastructure.
  • 2025 revenue reached €2.6 billion, with EBITDA €403 million and order book €4.4 billion.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Hybrid Work Options

Gym Membership

Growth & Insights and Company News

Headcount

6 month growth

↑ 8%

1 year growth

↑ 8%

2 year growth

↑ 8%
Offshore Source
Sep 24th, 2026
Van Oord reveals Vindnes and Vestnes for subsea rock installation.

Van Oord reveals Vindnes and Vestnes for subsea rock installation. During WindEnergy Hamburg, Van Oord officially revealed the names of its two next-generation flexible fallpipe vessels: Vindnes and Vestnes. Scheduled for delivery in 2028 and 2029, the purpose-built vessels will strengthen Van Oord's subsea rock installation capabilities and support the continued growth of offshore wind, interconnector, and critical energy infrastructure projects worldwide. As offshore wind farms move further from shore and increase in scale, demand for reliable seabed intervention solutions continues to grow. Subsea rock installation, pioneered by Van Oord since the 1970s, is vital for protecting and stabilizing offshore energy infrastructure. Building on more than 50 years of operational experience and the industry's most extensive dedicated flexible fallpipe fleet, Van Oord continues to set the benchmark in seabed intervention. "The need for secure and sustainable energy infrastructure has never been more important. With Vindnes and Vestnes, we are investing not only in additional capacity, but in a new generation of purpose-built subsea rock installation vessels designed around productivity, efficiency and sustainability. As offshore projects become larger and more complex, our customers increasingly require solutions that minimize project duration, reduce emissions and deliver the lowest total installation cost. These vessels reflect our confidence in the continued growth of offshore energy, and reinforce Van Oord's commitment to remaining at the forefront of seabed intervention," said Maurits den Broeder, Managing Director Offshore Energy at Van Oord. The names Vindnes and Vestnes continue the naming tradition of Van Oord's subsea rock installation fleet, complementing existing vessels such as Nordnes, Stornes, and Bravenes. Inspired by wind and the west, the names reflect both the fleet's maritime character and the future of offshore energy. They symbolize the connection between Van Oord's longstanding expertise in seabed intervention and its continued commitment to supporting the energy transition. Unlike many recent market additions developed through vessel conversions, Vindnes and Vestnes have been designed from the keel up as dedicated subsea rock installation vessels. This purpose-built approach enables Van Oord to incorporate the latest lessons learned from decades of operations, resulting in enhanced safety, operational efficiency, installation performance, and future fuel flexibility. With a loading capacity of 35,000 tonnes, Vindnes and Vestnes have been optimized to deliver maximum project productivity while minimizing environmental impact. Rather than focusing solely on vessel size, the design balances carrying capacity, installation rates, fuel efficiency, and offshore workability to reduce the total cost and emissions per tonne of rock installed. Advanced automation, smart sensors, and a DP2 positioning system enable highly accurate rock placement, while multi-fuel engines, battery storage, and an energy-efficient design contribute to lower-emission operations. Vindnes and Vestnes are currently being constructed by Yantai CIMC Raffles Offshore in China. The first vessel is expected to be delivered in 2028, followed by the second in 2029. Together, they will help Van Oord meet the offshore challenges of the future and further strengthen its position in subsea rock installation.

Bunker Index
Sep 24th, 2026
Van Oord names new fallpipe vessels with multi-fuel engines.

Van Oord names new fallpipe vessels with multi-fuel engines. Dutch marine contractor unveils two purpose-built subsea rock installation vessels due for delivery in 2028 and 2029. Van Oord's new flexible fallpipe vessels, Vindnes and Vestnes, feature multi-fuel engines and battery storage, and are said to have been designed with fuel efficiency in mind. Pictured: Rendering of Van Oord's vessels Vindnes and Vestnes. Image credit: Van Oord Van Oord has revealed the names of its two next-generation flexible fallpipe vessels - Vindnes and Vestnes - during WindEnergy Hamburg on 23 September. The Rotterdam-based marine contractor said the vessels, scheduled for delivery in 2028 and 2029 respectively, will add to its subsea rock installation capabilities and support offshore wind, interconnector and energy infrastructure projects. Design and specifications Van Oord said Vindnes and Vestnes have been designed from the keel up as dedicated subsea rock installation vessels, allowing it to incorporate lessons learned from decades of operations into the vessels' fuel flexibility, operational efficiency, installation performance and safety. Multi-fuel engines, battery storage and what Van Oord describes as an energy-efficient design are aimed at supporting lower-emission operations. The design is said to balance fuel efficiency, carrying capacity, installation rates and offshore workability, with the aim of reducing the total cost and emissions per tonne of rock installed rather than focusing solely on vessel size. Vindnes and Vestnes will each have a loading capacity of 35,000 tonnes. They are being built by Yantai CIMC Raffles Offshore in China, with the first vessel due for delivery in 2028 and the second in 2029. Subsea rock installation Subsea rock installation, which Van Oord has carried out since the 1970s, is used to protect and stabilise offshore energy infrastructure. The Dutch firm said demand for seabed intervention solutions continues to grow as offshore wind farms move further from shore and increase in scale. Maurits den Broeder, managing director offshore energy at Van Oord, commented: "The need for secure and sustainable energy infrastructure has never been more important. With Vindnes and Vestnes, we are investing not only in additional capacity, but in a new generation of purpose-built subsea rock installation vessels designed around productivity, efficiency and sustainability. As offshore projects become larger and more complex, our customers increasingly require solutions that minimise project duration, reduce emissions and deliver the lowest total installation cost." | / | / | Dong Fang Offshore orders CSOV with battery-hybrid propulsion Vard secures fifth newbuild contract from Taiwanese firm, with delivery scheduled for 2028. | | / | / | Spain sets out regulatory roadmap for biomethane and bio-LNG growth Molgas outlines Spain's biogas targets, certification rules and adoption barriers across transport, maritime and grid injection. | | / | / | CSL and OWL launch first subsea rock installation vessel for offshore wind MV Rock Star can run on MGO and methanol and is designed to support scour protection and cable burial for offshore wind projects. | | / | / | Lloyd's Register study backs 200,000-cbm LNG carriers for fleet renewal Analysis finds larger LNG carriers could cut transport costs while retaining access to most major terminals. | | / | / | Höegh Autoliners signs contract for six dual-fuel LNG vessels Aurora Class ships are designed to be converted to run on alternative fuels in the future. | | / | / | IMO and EMSA gather maritime experts to address seafarer training for alternative fuels Experts examine how training frameworks must evolve as shipping adopts ammonia, methanol, hydrogen and other new technologies. | | / | / | Portsmouth port publishes white paper on UK's first multi-berth shore power system UK port shares lessons from five-year project in bid to spur nationwide uptake of the technology. | | / | / | IMO seminar examines technical hurdles facing ammonia as a marine fuel Technical seminar under the Future Fuels and Technology Project attracts over 800 participants. | | / | / | ICS to host webinar on wind-assisted propulsion for shipping Event to bring together panel of industry experts to discuss wind propulsion as a decarbonisation option. | | / | / | Portsmouth switches on UK's first multi-berth shore power system ABB technology enables Portsmouth to offer high-voltage shore power across three berths simultaneously. | | / |

Van Oord
Jul 15th, 2026
Van Oord consortium selected as preferred contractor for Roberts Bank Terminal 2 in Canada.

Van Oord consortium selected as preferred contractor for Roberts Bank Terminal 2 in Canada. Rotterdam, the Netherlands, 15 July 2026 - The Vancouver Fraser Port Authority has announced that TerraMarine, a consortium including Van Oord, Aecon Group, FlatironDragados Canada and Carlson Construction Group, has been selected as the preferred contractor for the Roberts Bank Terminal 2 - Landmass and Wharf progressive design-build project in Delta, British Columbia, Canada. The Roberts Bank Terminal 2 project will increase container capacity at the Port of Vancouver by 50% - delivering a new three-berth marine container terminal at Canada's largest port and creating 320 acres of new waterfront industrial land. Van Oord brings its extensive global experience in dredging, land reclamation, dyke construction and rock works to the project. TerraMarine is expected to sign a design and early works agreement with the Vancouver Fraser Port Authority in the third quarter of 2026. Upon completion of the collaborative development phase, a design-build agreement is anticipated to be executed in the first quarter of 2028 to commence construction, with completion expected in the mid-2030s. Ronald Schinagl, Managing Director Dredging & Infra, Van Oord: 'Van Oord nv is proud to support the further development of Vancouver's port infrastructure, so that it can meet the growing demands of global trade. This further expansion of its presence in Canada demonstrates its commitment to the region, and Van Oord nv thank the Vancouver Fraser Port Authority for its continued trust. Van Oord nv look forward to collaborating with its partners and local stakeholders to make this project a success.' Peter Xotta, President and CEO, Vancouver Fraser Port Authority: 'As we advance the Roberts Bank Terminal 2 Project, selecting a highly qualified construction partner is a major step forward. Canada has set a bold target to double non-U.S. exports in the next decade, and Roberts Bank Terminal 2 is critical to achieving that goal.'

Breakbulk News & Media B.V.
Jun 19th, 2026
TWD designs monopile deck systems as Boreas completes first year.

TWD designs monopile deck systems as Boreas completes first year. Estimated reading time: 3 minutes The first anniversary of the offshore installation vessel Boreas has highlighted the role of engineering and equipment design in supporting the next generation of offshore wind projects. Dutch engineering company TWD said it worked with Van Oord to develop the vessel's monopile deck spread, a key component that enables Boreas to transport, secure, and install large monopile foundations used in offshore wind farms. The collaboration focused on designing major monopile handling equipment capable of supporting increasingly demanding installation campaigns. Among the systems developed were a four lane monopile seafastening arrangement, an upend hinge system, and a monopile gripper equipped with integrated noise mitigation deployment technology. As offshore wind foundations continue to grow in size and weight, vessel operators face increasing pressure to maximize deck utilization while maintaining operational flexibility. The Boreas deck configuration was designed to address those challenges by accommodating a wide range of monopile diameters and supporting efficient installation workflows. Supporting larger offshore wind foundations. Monopiles remain the preferred foundation solution for many offshore wind projects, particularly in European waters where turbine sizes continue to increase. Handling these structures requires specialized deck equipment capable of safely securing heavy loads during transport and installation. According to TWD, the monopile seafastening system developed for Boreas was engineered to cover a broad diameter range, allowing the vessel to adapt to varying project requirements without extensive equipment modifications. The engineering scope also included structural integration and load spreading arrangements designed to manage the substantial forces generated by heavy monopile cargoes. In practical terms, the approach helps distribute loads across the vessel structure while supporting safe handling operations. Reducing mobilization time. Another feature of the design is the integration of the monopile handling equipment with the vessel's wind turbine generator deck spread. Why does this matter? For offshore contractors, mobilization periods can have a significant impact on project schedules and vessel utilization. By integrating systems across different installation scopes, operators can potentially reduce preparation time between projects and improve operational efficiency. Boreas was built to support large scale offshore wind developments and forms part of a growing fleet of specialized vessels entering the renewable energy sector. The vessel's first year of operation comes as developers and contractors continue expanding offshore wind capacity across Europe and other global markets. For TWD and Van Oord, the anniversary marks a milestone in a partnership focused on developing equipment solutions capable of meeting the evolving demands of offshore wind installation projects. "Breakbulk.News publishes editorial content, including news, features and press releases supplied by third-party companies, institutions and PR agencies. Third parties who submit material to us are solely responsible for ensuring that all text, images, logos and other content they provide are accurate and that they hold all necessary rights, licences and permissions for news use. By submitting content to Breakbulk.News, contributors represent and warrant that their material does not infringe the rights (including copyright and related rights) of any third party and agree to indemnify Breakbulk.News in respect of any claims arising from their submissions. If you believe any content on our site infringes your rights, please contact us at [email protected] with full details and we will investigate promptly..."

Construction Enquirer
Jun 9th, 2026
Duo share £1.2bn coastal beach management framework.

Duo share £1.2bn coastal beach management framework. Aaron Morby 1 hour ago The Environment Agency has appointed dredging and marine engineering specialists Van Oord and VBA Joint Venture to a £1.23bn framework to maintain England's beaches and coastal flood defences over the next eight years. The Beach Management Framework will run initially for six years to 2032, with an option to extend for a further two years to 2034. The new deal effectively squeezes out firms like BAM Nuttall, Kier, and Jackson Civil Engineering which have historically been involved as delivery partners. | Beach Management Framework contractors | | Van Oord UK | Marine dredging, beach nourishment and coastal engineering specialist | | VBA Joint Venture | Partnership between VolkerStevin, Boskalis Westminster and AtkinsRéalis | Under the new deal, contractors will carry out routine and emergency beach maintenance works along England's coastline, moving millions of tonnes of shingle from areas of build-up to erosion hotspots to maintain flood protection standards. The framework will also cover beach recharge schemes using marine dredged and land-won aggregate, rock armour placement, repairs to sea defences and emergency coastal response following severe weather events. Work worth up to £10m can be awarded directly under a geographical allocation system, while larger schemes will be competed between the two framework partners. The Environment Agency said the programme is critical to protecting homes, businesses and infrastructure from rising sea levels, coastal erosion and increasingly extreme weather events. VBA said the framework would enable it to continue delivering beach recharge, sediment recycling and coastal maintenance schemes aimed at reducing erosion and strengthening natural flood defences around England. The joint venture has worked with the Environment Agency since 2013 through its water, environment, marine and coastal programmes.

Recently Posted Jobs

Sign up to get curated job recommendations

There are no jobs for Van Oord right now.

Find jobs on Simplify and start your career today

We update Van Oord's jobs every few hours, so check again soon! Browse all jobs →