C

CDC Data Centres

Operates sovereign data centres and services

Service Technician - HVAC/Electrical

Full-TimeUpdated on 10/17/2026Deadline 10/25/26
No salary listed
Entry
Eastern Creek, Australia
In PersonRotating 24/7 shift roster: 2 days, 2 nights, 4 days off.
General Maintenance & RepairBuilding & Property Maintenance

About the job

Requirements
  • Experience working in environments where reliability, safety, and procedures matter, such as electrical, HVAC, mechanical, or broader critical infrastructure settings.
  • Australian citizenship and the ability to obtain an NV1 Security Clearance.
Responsibilities
  • Monitor and respond to alarms and alerts across power, cooling, and fire systems.
  • Perform physical inspections to ensure equipment and infrastructure operate within defined parameters.
  • Respond to faults and incidents, prioritise actions, and determine when escalation or contractor support is required.
  • Carry out operational switching and control activities to prevent unplanned outages.
  • Support planned maintenance and monitor on-site contractors, ensuring adherence to safety procedures and approved methods of operation.
  • Document incidents, maintenance activities, and observations to support continuous improvement.
Desired Qualifications
  • A trade or technical background in Electrical, Refrigeration/HVAC, Mechanical, or a related field.
  • Experience working in critical or high-availability environments with strong safety and compliance requirements.
  • Exposure to monitoring or control systems such as BMS, EMS, or SCADA-type platforms.
  • Familiarity with complex infrastructure or plant equipment, such as HVAC systems, power systems, generators, and fire systems.
  • Fault-finding, problem-solving, and situational awareness skills.
  • Ability to produce clear documentation, logs, and post-incident reports.

About the company

CDC Data Centres owns and operates secure, sovereign data centres across Australia and New Zealand. It designs modular, scalable facilities and provides a full suite of services—from design and planning to deployment, operations, and monitoring—covering colocation, cloud, and managed infrastructure. Its facilities serve government, defense, finance, healthcare, technology, and hyperscale customers that require highly secure, compliant data hosting and connectivity. Unlike many providers, CDC focuses on sovereign, long-term infrastructure solutions with contracts often spanning decades and tailored to critical infrastructure needs. The company aims to expand its footprint to protect and enable government and enterprise operations by delivering secure, flexible data centre environments that meet strict data sovereignty and security requirements.

Company Size

201-500

Company Stage

N/A

Total Funding

N/A

Headquarters

Fyshwick, Australia

Founded

2007

Get referred to CDC Data Centres

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • ACT approved Beard 2 on 29 September 2026, adding 84MW at Beard.
  • Contact and CDC announced Stratford, Taranaki on 10 August 2026, targeting 250MW with batteries.
  • Infratil said CDC’s independent valuation reached A$18.5 billion in July 2026.

What critics are saying

  • Wagga Wagga’s 1.4GW campus needs zoning change, SEARs, water, sewer, and grid approvals.
  • Hazelmere’s 2026 proposal faces native-vegetation and noise backlash after GreenSquareDC’s withdrawal.
  • If CDC misses FY28–FY29 buildouts, the 555MW contract becomes stranded revenue timing risk.

What makes CDC Data Centres unique

  • CDC’s 6 May 2026 555MW US contract pushed contracted capacity above 1GW.
  • Its sovereign campuses span Canberra, Sydney, Melbourne, Perth, Auckland, and planned regional Australia.
  • CDC pairs long contracts with industrial sites, closed-loop cooling, and renewable power claims.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Training Programs
  • Professional Development Budget
  • Parental Leave
  • Volunteer Leave
  • Employment Assistance Program
  • CDC Social Events

Company News

The Age
Oct 15th, 2026
David vs Goliath in Hazelmere: Why tech giants keep targeting Perth's east.

David vs Goliath in Hazelmere: Why tech giants keep targeting Perth's east. October 16, 2026 - 3:05am Article gifting is here Give anyone free access to subscriber-only stories when you subscribe. Fresh off driving a $600 million data centre out of Perth's east, Hazelmere residents are girding for a second battle as another tech giant sets its sights on their neighborhood. Five months after GreenSquareDC was forced to withdraw its application for a $600 million data centre near the banks of the Helena River due to public outcry, a Canberra-based developer hopes to have more luck. Canberra Data Centres (CDC) is looking to build a $337 million four-storey centre at 178 and 196 Bushmead Road around two kilometres from the proposed GreenSquareDC site. Public consultation for the proposal opened this week, with plans posted to the City of Swan's website showing the development would take up 85,945sqm and comprise 87 parking bays. A maximum of 75 people will be on site at any one time, the proposal explains, and the facility will operate 24 hours a day, seven days a week. A petition was submitted to change.org by local Melita McDonald on September 30 and requested the City to ensure the proposal was subject to "comprehensive, independent assessment and meaningful community consultation before any approval is granted." "We ask that the long-term interests of nearby residents, the surrounding community, the Helena River, wetlands, waterways, native wildlife, threatened and endangered species and the broader environment are properly protected and considered," the petition reads. "We call for comprehensive independent assessment, transparency, meaningful community consultation and appropriate enforceable conditions to address the potential impacts of this development and all associated infrastructure." So far 53 people have signed the petition, but if history proves anything, people power makes a big difference for data centres in Hazelmere. From our partners. When GreenSquareDC submitted their data centre plans, the City received a total of 1890 submissions regarding the proposal, with 1829 people opposing the development. The proposal by Sydney-based company would have seen a three-storey facility built next to the Helena River Waldorf School, on two Aboriginal heritage sites and approximately 40 metres from the Helena River channel. Public outcry against the proposal planned for lots 14 and 15 on Stirling Crescent was aired at several City of Swan council meetings, with concerns around environmental impacts, noise pollution and cultural insensitivity. Trillion Trees were one of the organisations against the first data centre proposal and have been equally as vocal about their concerns for CDC's plans. "Development of this land will mean the loss of one of the last remaining pockets of significant remnant vegetation on private land in Hazelmere," reads a Trillion Trees press release. "Connected corridors of vegetation through urban areas are critical for the survival of native wildlife species already under threat, including Carnaby's black cockatoos and snake necked turtles." The press release says the community has many wide-ranging concerns about the development including canopy loss, wetland loss, scale, and proximity to homes. They are urging people - locals or not - to voice their concerns over the proposal. City of Swan has advised people submitting comments on the proposal that they are not the decision maker for the application. "The application will be determined by the Metro Outer Development Assessment Panel (MODAP) due to the value of the proposed works," a City spokesperson said. Submissions for public comment will close on November 5.

ABC
Oct 7th, 2026
CDC Data Centres told not to take Wagga Wagga for granted over mega plan.

CDC Data Centres told not to take Wagga Wagga for granted over mega plan. Posted about 5h ago In short: Residents in Wagga Wagga have started a petition to halt development of a $15 billion data centre campus outside the town. CDC Data Centres plans to acquire 100 hectares to build the proposed 1.4-gigawatt facility. What's next? The proponent has submitted a scoping report and has two years to develop an environmental impact statement once the state government sets the guidelines. When residents of the NSW city of Wagga Wagga learnt one of the country's largest data centres was proposed for down the road, they had questions. For resident Liz Warrell, the biggest was: how does it benefit her community? "It's a big box; it sits there," she said. "I don't know if it generates employment, I know it's using resources and I know it's creating emissions. "So what effect is that having on us as a community as our climate dries?" CDC Data Centres is proposing to build a $15 billion campus on a 100-hectare council-owned site next to the city's landfill. If approved, the 1.4-gigawatt facility is expected to consume more electricity each year than a million typical NSW homes. Just 4 kilometres from the proposed site, Eden Summers is also worried her peaceful rural lifestyle is at risk. "Government likes to take action on big business projects without actually thinking of the locals," Ms Summers said. The land CDC is eyeing for the project is currently zoned for primary production use, but the company proposes to change the zoning. "We have restrictions on what we can do on our land, but then when it comes to big business, everything changes; there's just no consistency," Ms Summers said. "People feel backstabbed." A petition to halt the development, started by Ms Summers, has attracted more than 1,000 signatures and states locals "should not have to sacrifice our rural community for a data centre". "If it was on land designated for this sort of project, opposition wouldn't be as strong," she said. "But the land we are on, and the environment, is not appropriate." Other residents cautiously open to plan. However, some Wagga residents, like Katrina Walker, think the site, 15 kilometres from the city's centre, made sense. "If it's out at Gregadoo, that's a fair way out, so I think it'd be OK," she said. So far, only a scoping report that provides an overview of the proposed state significant development has been made publicly available. Advocacy group Committee 4 Wagga has cautiously welcomed the proposal, having campaigned previously for more industry in the city. But co-chair Richard Pottie said support for the centre would depend on the details. "We can't take on the 'not in our backyard' philosophy," he said. "If there are lots of cons, we need to address it; if there are lots of pros, we need to endorse the project and make the most of it." Calls for information on water and power usage. The first community consultation sessions will be held in Wagga on Wednesday and Thursday next week. Once the state government releases its State Environmental Assessment Requirements (SEARs) for the project, CDC will have two years to submit an Environmental Impact Statement (EIS). The full outline of the data centre's electricity infrastructure needs, as well as a noise and vibration assessment and a water management plan, will be included in that EIS. A CDC spokesperson said that in the proposed centre's first stage of operation, it was estimated that 1.28 million litres of water, or the equivalent water use of seven households, would be needed for an "initial fill". "CDC typically undertakes this from rainwater collected onsite, with a backup from water trucks or, depending on local conditions, town water," the spokesperson said. The company said on an ongoing basis, the first stage of the project was expected to consume as much water as a typical office building. "Gerard Roofs estimate its annual water consumption to be approximately 1,512,000 litres per year. "The town water usage is estimated to be equivalent of a little less than nine Australian households." Meanwhile, CDC said once completed, the 1.4-gigawatt campus was expected to run at between 40 and 60 per cent of its maximum capacity, depending on customer needs. The company estimated that would be the equivalent of 5-7 terawatt-hours (TWh) annually. According to household usage data from the Australian Energy Regulator, this is the equivalent annual consumption of between 1 and 1.5 million NSW homes. CDC's website stated the project "could bring hundreds of new jobs during construction and ongoing skilled employment opportunities once operational". Community consultation vital. Independent Member for Wagga Wagga Joe McGirr said lessons learnt during the state's renewable energy rollout need to be applied during the community consultation process. "You can't take the community for granted," he said. "You don't just come and pretend there's no one here. "You've got to genuinely engage with the community, you've got to address community concerns, and you've got to make sure communities get benefits." Dr McGirr said he had spoken with CDC about the project and toured one of the company's data centres in Sydney. "It was quite impressive from a safety and water point of view," he said. "The technology doesn't use a lot of water; they recirculate all the water. It's an Australian technology, built, as I understand, for our conditions." The importance of community consultation has been echoed by the Wagga Business Chamber. "We want to make sure that they're not just ticking a box," business manager Sally Manning said. While Eden Summer acknowledged that it could be years before the data centre was approved, she was in opposition for the long haul. "We're surrounded by people that want to fight."

Allens
Oct 7th, 2026
Allens joins Data Centres Australia.

Allens joins Data Centres Australia. 7 October 2026 Allens has joined forces with leading voices in the Australian data centre sector with affiliate membership of Data Centres Australia. Through its membership, Allens will share its market-leading expertise to support Data Centres Australia's goal of making Australia a leader in technology innovation and sustainable data centre development. The announcement follows Allens' advice across the full lifecycle of Australia's largest and most complex data centre developments, with the firm having recently advised: * Stockland on its capital partnership with data centre operator EdgeConneX to develop, own and operate an Australian portfolio of data centres, and on grid connections; * Global investment group La Caisse on its $1.7 billion commitment in hybrid securities issued by NEXTDC Limited, Australia's largest listed data centre developer; * Keppel on its proposed development of a 720MW data centre campus on a 123-hectare site near Victoria's former Hazelwood power station, including advising on development and acquisition rights and power and network connections; * Blackstone on AI infrastructure company Firmus' US$10 billion debt financing facility for the Project Southgate GPU deployment; * IREN on the Australian law aspects of US$3.85bn of convertible senior notes across multiple issuances; * IREN on its transmission connection agreement and other matters for its first Australian data centre campus, a planned 800MW campus in Bundey, South Australia; * CDC Data Centres on raising $1.7 billion in the Australian debt capital markets, comprised of a $1 billion first rated corporate hybrid (the first issued by a data centre operator in the AMTN market) and a $700m dual-tranche senior secured debt issuance; and * data centre developers, network service providers, and energy retailers on regulatory requirements under the NER specific to data centres, including in relation to Transmission Use of System Charges and connection configurations. Partner David Donnelly said: 'Australia stands at a crossroads in its development of data centres as both essential national infrastructure and an opportunity to attract global investment. We are delighted to work with Data Centres Australia as our nation works towards one of the greatest infrastructure opportunities in a generation.' Partner Gavin Smith said: 'Data centre and AI Infrastructure development is driving significant investment, jobs and strategic capability across our economy. By joining forces with other leading organisations in this space, we hope to assist in influencing national reform to improve planning certainty and support the continued wave of global investment into our economy.' Data Centres Australia is the peak representative body for data centres in Australia. Together with its members, it works collaboratively with government and stakeholders to raise awareness and advance effective and sustainable data centre development.

Capital Brief
Oct 6th, 2026
Dicker Data shares jump on Sektor acquisition.

Dicker Data shares jump on Sektor acquisition. Debt Costs CDC Data Centres loses $78m in value in September quarter. 3:48pm today The news: An independent valuation of Infratil and Future Fund owned CDC Data Centres has lowered its value by $78 million in the three months to 30 September 2026 amid higher interest costs. The context: The revaluation follows CDC CEO Greg Boorer's announcement that the company had split with neocloud Firmus, ending the Project Southgate plan to jointly roll out 1.6 gigawatts of data centres across Australia after just 42 megawatts of deployed capacity. Infratil told the exchange that the valuation was affected by the cashflow impacts of a "material increase in the forward yield curve, which drove forecast debt servicing costs within the cashflows, and resulted in higher assumed interest costs over the forecast period". The cashflow impact offset the lift in contracted capacity to 1.1 gigawatts with 70 megawatt contracted. The company is also accelerating its buildout and saw its total reported pipeline increase by 240 megawatts to 4.2 gigawatts. The numbers: CDC's independent valuation fell to a mid-point valuation of $18.45 billion, which sits within the valuation range of $17.4 billion to $19.6 billion. Infratil's 49.69% stake in CDC has fallen in value by $45 million to $9.17 billion. This changes from the 49.72% interest Infratil held at 30 June 2026. Net debt increased to $7.14 billion, up from $5.98 billion, over the period. The source: ASX Get Letter of Intent in your inbox. Billions of dollars of index-linked demand could be riding on Firmus' blockbuster float, but entry to ASX benchmarks may have to wait until March. Hugo Mathers · 2 October 2026 This week on the podcast, the data centre debate heats up as Goodman Group faces its Lane Cove setback and Firmus signs a mega deal with Meta. John McDuling, James Hennessy, and Harshdeep Kaur · 2 October 2026 Ampol's bet on Evie Networks continues the fuel retailer's transformation under Matt Halliday and comes just as EV adoption rates in Australia hit a tipping point. Brandon How · 1 October 2026

FilingReader
Oct 6th, 2026
Infratil reports stable CDC valuation amid higher interest rates.

Infratil reports stable CDC valuation amid higher interest rates. October 6, 2026 at 07:39 PM UTC - By FilingReader AI Infratil announced that CDC's independent valuation was broadly flat at a mid-point of A$18.5bn as of 30 September 2026. Higher assumed interest costs from a material increase in the forward yield curve offset positive cash flow movements, dropping the overall valuation by A$78m to A$18.45bn. Infratil's 49.69% interest in CDC is valued at A$9,168m, down A$45m from the previous quarter. The independent valuer noted CDC's cost of equity increased to 12.58% due to a higher forecast long-term gearing ratio. Net debt increased by A$1,161m over the quarter after CDC raised A$1.7bn in debt, including A$700m in Australian Medium-Term Notes and A$1bn through a US Private Placement. Operationally, CDC expanded its capacity pipeline by 240 MW to 4,180 MW, while contracted capacity reached 1.1 GW following an additional 70 MW contracted. This report was generated by FilingReader's AI system from regulatory filings and company disclosures. To request a correction, contact [email protected]