A

Alliant Energy

Regulated electric and natural gas utility

Senior Project Manager - Power Plant Outage

Full-Time
$120k - $130k+ Annual incentive
Senior
Bachelor's
Clear Lake, IA, USA+1 moreMore locations: Marshalltown, IA, USA
In Person
Project & Program ManagementProject Management
No H1B Sponsorship

About the job

Requirements
  • Five years of experience managing medium- to large-sized, complex projects.
  • Project Management Professional (PMP) certification must be achieved within 12 months of employment.
  • Ability to analyze and solve moderately complex problems and implement effective solutions.
  • Ability to organize large project plans and document them effectively.
  • Ability to plan and carry out responsibilities with minimal direction.
  • Ability to develop and apply performance measures.
  • Ability to use computer software, including email, word processing, spreadsheets, and project management tools.
  • Ability to work effectively in a collaborative and inclusive work environment.
Responsibilities
  • Initiate, plan, develop, administer, manage risks for, implement, control, and close large projects across multiple business units.
  • Use project management methodologies and processes based on the Project Management Institute to deliver projects within scope, schedule, and cost objectives while managing risks to project deliverables.
  • Determine project business needs and deliverables, and use project management tools to establish and manage costs, resources, performance measures, timelines, and technical objectives.
  • Determine project resource and staffing skillsets, including the expertise needed, and assess strategies to reduce project risk.
  • Manage applicable project contracts in conjunction with sourcing personnel.
  • Ensure work is completed to specifications and on the contract schedule.
  • Develop and execute project communication and stakeholder management plans, including reporting project status, risks, and progress to stakeholders in agreed formats, frequency, content, and audience.
  • Ensure project team members and project users receive needed training.
  • At project completion, ensure operational teams are trained, work orders are closed, finance charges are handled, team members are reassigned, documentation is complete, and deliverables transition smoothly.
  • Support and mentor others in using organizational change management methodology and provide business consulting support as needed to help achieve strategic objectives.
  • Perform project cost-benefit analyses and assess feasibility when applicable.
Desired Qualifications
  • Bachelor's degree.
  • Project Management Professional (PMP) certification.

About the company

Alliant Energy is a regulated utility that provides electric and natural gas services to residential, commercial, and industrial customers in the Midwest, mainly Iowa and Wisconsin. It generates, distributes, and sells electricity and natural gas, and also collects service fees for energy distribution and maintenance. The company operates under state and federal regulation to ensure fair pricing and reliable service. It funds renewable energy projects such as wind and solar, runs energy-efficiency programs, and offers financial assistance to low-income customers while supporting local communities. Its approach combines steady regulated operations with ongoing investments in cleaner energy and customer assistance to maintain affordable, reliable service.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Madison, Wisconsin

Founded

1917

Get referred to Alliant Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • On July 30, 2026, Alliant beat EPS estimates and reaffirmed $3.36-$3.46 guidance.
  • Management expects about 60% load growth by 2031, driven by five executed electric service agreements.
  • QTS, Google, and Meta projects are already advancing, supporting earnings into 2027-2029.

What critics are saying

  • Morgan Valley faces organized local opposition, with Linn County hearings and IUC docket GCU-2026-0002 unresolved.
  • A permit denial or delay before December 2026 would push 2027 construction and 2030 commissioning.
  • Data-center concentration risks stranded generation if hyperscale customers slow, cancel, or renegotiate load.

What makes Alliant Energy unique

  • Alliant Energy's Iowa-Wisconsin regulated footprint anchors predictable rate-base growth and allowed returns.
  • Its 2026 pipeline includes 3.4 gigawatts of contracted large-load demand, mostly data centers.
  • Morgan Valley and other projects exploit existing Midwest transmission and utility permitting infrastructure.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Tuition Reimbursement
  • Paid Vacation
  • Hybrid Work Options
  • Wellness Program

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

0%

2 year growth

0%
Offshore Source
Oct 16th, 2026
Alliant Energy Corporation declares quarterly common stock dividend.

Alliant Energy Corporation declares quarterly common stock dividend. MADISON, Wis.-(BUSINESS WIRE)-The Alliant Energy Corporation (NASDAQ: LNT) Board of Directors today declared a quarterly cash dividend of $0.5350 per share payable on November 16, 2026, to shareowners of record as of the close of business on October 30, 2026. Dividends on common stock have been paid for 324 consecutive quarters since 1946. Alliant Energy Corporation is recognized as a member of the S&P 500 Dividend Aristocrats Index. Alliant Energy Corporation (NASDAQ: LNT) provides regulated energy service to approximately 1,010,000 electric and 435,000 natural gas customers across Iowa and Wisconsin. Alliant Energy's mission is to deliver energy solutions and exceptional service customers and communities count on - safely, efficiently and responsibly. Interstate Power and Light Company (IPL) and Wisconsin Power and Light Company (WPL) are Alliant Energy's two public energy companies. Alliant Energy is a component of the S&P 500. For more information, visit alliantenergy.com and follow Alliant Energy on LinkedIn, Facebook, Instagram and X. Media Contact: 24-hour access (608) 458-4040 Investor Relations Contact: Susan Gille (608) 458-3956 Read the Article on Business Wire: Read More Posted By OffshoreSource

The Gazette
Oct 14th, 2026
Linn County supervisors approve Morgan Valley host fee.

Linn County supervisors approve Morgan Valley host fee. It would total $7.3 million over Alliant power plant's lifetime. * Fern Alling The Gazette * Oct 14, 2026 updated 4 hrs ago. The Gazette offers audio versions of articles using Instaread. Some words may be mispronounced. CEDAR RAPIDS - The Linn County Board of Supervisors on Wednesday approved a host fee to cover county costs related to hosting the proposed Alliant Energy's Morgan Valley Energy Center, assuming it gains regulatory approved. To build the 720-megawatt, natural gas-fired electricity plant, Alliant Energy submitted an application to rezone agricultural land in unincorporated Linn County. The fee - called a host community agreement - is required as part of the rezoning application. Approval of the host community agreement is not an approval of the rezoning application. The Board of Supervisors' first consideration of the application is scheduled for Tuesday, Oct. 20, pending a recommendation for or against the application from the county Planning and Zoning Commission, scheduled to meet the night before. Both meetings begin at 6 p.m. at The Hotel by Kirkwood Center, 7725 Kirkwood Blvd. SW in Cedar Rapids. The board voted 2-1 in favor of the agreement, with Supervisors Sami Scheetz, a Democrat, and Brandy Zumbach Meisheid, a Republican, in favor, and Supervisor Kirsten Running-Marquardt, a Democrat, opposed. Under the agreement, Alliant will pay Linn County $5.3 million while building the Morgan Valley Energy Center near the Linn-Benton county line northwest of Fairfax. After the plant is built, Alliant will provide around $50,000 a year for 30 years, which is how long the facility is expected to operate. That payment includes a 2% escalator each year. In total, the county would receive $7.3 million for hosting the plant. The agreement will apply even if the property changes hands. If the facility expands by 10% or more, the county will renegotiate terms with Alliant. Under a new state law capping property tax increases, the county will not see a significant increase in revenue from hosting the facility, Linn County Planning and Development Director Charlie Nichols said. "Although a power plant like the Morgan Valley Energy Center would pay property taxes, the county would not realize that in new revenue that it is then able to pay for any services that the county has to provide as a result of that new project," Nichols said. The agreement will cover costs associated with the facility - like emergency response, environmental monitoring and road maintenance. The host community agreement will prevent Linn County residents from shouldering costs, whether or not the project moves forward with county approval, Scheetz said. If the Iowa Utilities Commission decides the Morgan Valley Energy Center is necessary to meet the state's energy needs, Alliant can build it even if the county rejects the rezoning application. "This agreement, while I don't love it, is a good way for us to protect the county, to protect our residents and taxpayers," Scheetz said. Supervisor Running-Marquardt said Alliant has been difficult to work with compared to NextEra Energy, the owner of the Duane Arnold nuclear energy plant near Palo. The county negotiated a host community agreement with NextEra as it works toward restarting the plant. While she said she appreciated the effort Linn County staff put into negotiating the agreement with Alliant, Running-Marquardt voted against it. "Because of all of my concerns, not only for the project, for unanswered questions, for the no guarantee that rates won't be passed on to the citizens of this community that I dearly love, I'm going to give no on today's vote," Running-Marquardt said, Public comment. Public comment largely centered on long-standing issues residents have cited with Alliant's application, such as the plant's environmental health impacts and a lack of input from Benton County officials in decision-making. Fairfax Mayor JoAnn Beer told the board the city of Fairfax is including a host community agreement as part of its proposed data center ordinance. She said the amount Linn County will receive for hosting the Morgan Valley Energy Center "seems extremely modest in comparison." "I have mixed emotions regarding host community agreements that are part of rezoning requirements," Beer said. "While they may provide a path for city or county financial benefits, they also take on the appearance of a price tag being placed on quality of life." Nichols said Linn County's host community agreement amount was determined through cost estimates associated with the plant from county departments. The Iowa Utilities Commission has final approval over the agreement, Nichols said. "I would have liked to see a little bit more, but we also exist in a process where the Iowa Utilities Commission will have the ultimate say over this project," Nichols said. "We were very cognizant of trying to be as reasonable and conservative as we could and not overestimate our costs." Fern Alling is a general assignment reporter for The Gazette. They can be reached at [email protected] or 319-398-8331.

The Gazette
Oct 9th, 2026
Linn County to weigh $5.3M host fee for Alliant gas plant.

Linn County to weigh $5.3M host fee for Alliant gas plant. Utility would cover county costs for Morgan Valley Energy Center. * Grace Nieland The Gazette * Oct 9, 2026 updated 1 hr ago. The Gazette offers audio versions of articles using Instaread. Some words may be mispronounced. CEDAR RAPIDS - Alliant Energy would pay Linn County at least $5.3 million to construct a new 720-megawatt natural gas plant, according to a proposal headed to county supervisors next week. The Linn County Board of Supervisors on Monday will discuss a proposed host community agreement with Interstate Power and Light Company - a subsidiary of Alliant Energy - for the proposed Morgan Valley Energy Center. Alliant intends to build the natural gas plant in unincorporated Linn County south of Highway 30 near Linn-Benton Road, pending regulatory approvals. The host community agreement is required to rezone the land. The draft agreement - included in the supervisors' Monday's agenda packet - states Interstate Power and Light would pay an initial sum of $5.3 million into a "host community fund" to cover county costs associated with the project. That initial payment would be split into four annual contributions of $1.325 million, with the first payment required within 60 days of construction starting. The rest would be paid out over the next three years. An additional $50,000 payment would be made to the county during the first year of commercial operations, with a series of 30 annual payments to follow using a 2% annual inflation increase. The articles in this timeline follow Alliant Energy's initial plans to build a natural gas-fired power plant - known as the Morgan Valley Ener... County documents state those funds would be used "to support government functions, facilities, infrastructure and community initiatives... reasonably related to, or beneficial for, hosting (Morgan Valley Energy Center) and promoting long term economic, social and environmental sustainability." Examples of such functions include infrastructure maintenance or upgrades, environmental monitoring, economic development, intergovernmental coordination and emergency response planning, among others. The Morgan Valley agreement is listed for discussion only, meaning there will be no vote on Monday. Public comment on the topic will be heard, however, and a public hearing on the related rezoning request is set for Oct. 20. Alliant's plan. Alliant Energy first notified the public in late March of its plans to build a 720-megawatt natural-gas-fired electricity plant in unincorporated Linn County and has been working since to obtain the necessary permits. Required approvals include one from the Iowa Utilities Commission confirming a need for the plant, one with the Iowa Department of Natural Resources and Linn County Public Health that confirms the plant meets regulatory requirements for air quality, and one with Linn County to rezone the land. Alliant representatives say the plant will add well-paid, local jobs while ensuring the region has reliable energy amid growing demand. Opponents, however, counter that the plant won't benefit residential ratepayers and argue that environmental health concerns need to be considered. The Linn County Planning & Zoning Commission last month opted to table a vote on whether to recommend rezoning the site, citing a desire for more information from Alliant about the project and how it could better fit into the county's comprehensive plan. The commission will meet again to discuss the matter at 6 p.m. Oct. 19 at The Hotel at Kirkwood Center, 7725 Kirkwood Blvd. SW. Linn County supervisors will hold the first of three votes on the matter the following day. County staffers have collected information about the Morgan Valley Energy Center on the county website for residents' review. Those details can be found on the county's Planning and Development page by navigating to the natural gas electric facilities tab. Grace Nieland covers local government for The Gazette. She can be reached at [email protected].

MarketBeat
Aug 30th, 2026
Benjamin Edwards Inc. grows position in Alliant Energy Corporation $LNT.

Benjamin Edwards Inc. grows position in Alliant Energy Corporation $LNT. August 30, 2026 Key points. * Benjamin Edwards Inc. increased its Alliant Energy stake by 375.7% in the second quarter, holding 285,330 shares worth approximately $21.8 million. Institutional investors collectively own 79.9% of the company. * Analyst sentiment remains positive overall, with a consensus rating of "Moderate Buy" and an average price target of $77.00, despite some recent target-price reductions and one sell downgrade. * Alliant Energy exceeded quarterly earnings expectations, reporting $0.65 in EPS versus the $0.58 estimate and $971 million in revenue. The company also pays a quarterly dividend of $0.535 per share, equating to a 3.1% annualized yield. * Five stocks we like better than Alliant Energy. Benjamin Edwards Inc. lifted its holdings in shares of Alliant Energy Corporation (NASDAQ:LNT - Free Report) by 375.7% during the second quarter, according to the company in its most recent Form 13F filing with the Securities and Exchange Commission. The fund owned 285,330 shares of the company's stock after acquiring an additional 225,351 shares during the period. Benjamin Edwards Inc. owned 0.11% of Alliant Energy worth $21,766,000 at the end of the most recent reporting period. Several other hedge funds have also made changes to their positions in the business. Cedar Mountain Advisors LLC acquired a new position in Alliant Energy during the second quarter worth $26,000. Clearstead Trust LLC purchased a new position in Alliant Energy during the second quarter worth $27,000. Measured Wealth Private Client Group LLC acquired a new position in Alliant Energy in the 3rd quarter valued at about $27,000. Barrow Hanley Mewhinney & Strauss LLC acquired a new position in shares of Alliant Energy in the second quarter valued at approximately $32,000. Finally, Western Wealth Management LLC acquired a new stake in Alliant Energy during the first quarter worth approximately $41,000. Institutional investors and hedge funds own 79.90% of the company's stock. Wall Street analysts forecast growth. Several analysts have commented on the stock. TD Cowen initiated coverage on shares of Alliant Energy in a research note on Tuesday, July 7th. They issued a "hold" rating and a $83.00 target price for the company. Scotiabank reissued a "sector perform" rating and set a $74.00 price target (up from $72.00) on shares of Alliant Energy in a research note on Monday, May 4th. Wall Street Zen cut Alliant Energy from a "hold" rating to a "sell" rating in a report on Sunday, August 9th. BMO Capital Markets lowered their price objective on Alliant Energy from $80.00 to $78.00 and set an "outperform" rating for the company in a research report on Monday, August 3rd. Finally, Mizuho dropped their target price on Alliant Energy from $76.00 to $75.00 and set a "neutral" rating for the company in a research note on Monday, August 3rd. Nine analysts have rated the stock with a Buy rating and five have assigned a Hold rating to the company's stock. According to MarketBeat.com, Alliant Energy presently has a consensus rating of "Moderate Buy" and an average price target of $77.00. Alliant Energy stock down 0.3%. Shares of NASDAQ:LNT opened at $68.03 on Friday. The stock has a 50-day simple moving average of $72.87 and a 200-day simple moving average of $72.21. The stock has a market capitalization of $17.64 billion, a P/E ratio of 21.53, a PEG ratio of 2.52 and a beta of 0.55. Alliant Energy Corporation has a 1 year low of $63.28 and a 1 year high of $78.81. The company has a debt-to-equity ratio of 1.41, a quick ratio of 0.35 and a current ratio of 0.47. Alliant Energy (NASDAQ:LNT - Get Free Report) last posted its quarterly earnings results on Thursday, July 30th. The company reported $0.65 EPS for the quarter, beating the consensus estimate of $0.58 by $0.07. The firm had revenue of $971.00 million for the quarter, compared to analyst estimates of $896.94 million. Alliant Energy had a net margin of 18.45% and a return on equity of 11.16%. Alliant Energy's revenue for the quarter was up 1.0% compared to the same quarter last year. During the same quarter last year, the firm posted $0.68 earnings per share. Alliant Energy has set its FY 2026 guidance at 3.360-3.460 EPS. Equities analysts forecast that Alliant Energy Corporation will post 3.43 earnings per share for the current year. Alliant Energy dividend announcement. The firm also recently announced a quarterly dividend, which was paid on Monday, August 17th. Investors of record on Friday, July 31st were issued a dividend of $0.535 per share. The ex-dividend date was Friday, July 31st. This represents a $2.14 annualized dividend and a dividend yield of 3.1%. Alliant Energy's payout ratio is presently 67.72%. About Alliant Energy. Alliant Energy Corporation NASDAQ: LNT is a publicly traded energy holding company headquartered in Madison, Wisconsin, that provides regulated electric and natural gas utility services in the American Midwest. The company serves customers primarily in Wisconsin and Iowa through its regulated utility subsidiaries and operates as an integrated provider responsible for generation, transmission and distribution of energy to residential, commercial and industrial customers. Alliant Energy's core activities include operating and maintaining electric generation assets, managing the regional transmission and distribution network, and delivering natural gas service to its franchise territories. Further reading. This instant news alert was generated by narrative science technology and financial data from MarketBeat in order to provide readers with the fastest reporting and unbiased coverage. Please send any questions or comments about this story to [email protected]. Continue following MarketBeat Before you consider Alliant Energy, you'll want to hear this. MarketBeat keeps track of Wall Street's top-rated and best performing research analysts and the stocks they recommend to their clients on a daily basis. MarketBeat has identified the five stocks that top analysts are quietly whispering to their clients to buy now before the broader market catches on... and Alliant Energy wasn't on the list. While Alliant Energy currently has a Moderate Buy rating among analysts, top-rated analysts believe these five stocks are better buys. The AI boom extends far beyond the biggest tech names. Discover 10 companies supplying the memory, storage, networking, semiconductor manufacturing, and power infrastructure that make AI possible. Learn where the next wave of AI investment opportunities may emerge - and the key risks investors should watch as the global AI buildout accelerates.

Sinclair Broadcast Group
Aug 28th, 2026
Atkins says Alliant land split puts site 1.7 miles from Atkins and Fairfax, not 2.25

Atkins says Alliant land split is too close to city boundaries. by Nada Shamah Fri, August 28, 2026 at 12:14 PM Atkins says Alliant land split puts site 1.7 miles from Atkins and Fairfax, not 2.25. LINN COUNTY, Iowa - On Thursday, Iowa's News Now told you that the City of Atkins is opposing the sale of part of a 160-acre plot of land in unincorporated Linn County to Alliant Energy. The owner, Bowland Farms, has a purchase agreement with Alliant and the sale is for the proposed Morgan Valley Energy Center. Earlier this week, Atkins city leaders sent a letter to the Linn County Planning and Zoning Commission opposing Alliant's request to rezone the just over 10 acres, from agriculture use to exclusive use. The change would allow for large scale facilities like industrial and energy facilities. Atkins City Administrator Scott Flory says changing any part of the land to fit something industrial does not go along with what the city envisions for the future. He also says the area is closer that the 2.25-mile ordinance requirement. "The applicant is taking the measurement from the lot that is not yet created. So, we would disagree with how the applicant has determined that measurement. In our measurement, both the City of Atkins, as well as the City of Fairfax are equally 1.7 miles from this proposed parcel split," Flory said. Alliant has already filed a rezoning application with the Linn County Planning and Zoning Commission. Flory says the city will be at the meetings, speaking out against the proposal. "We want to make it clear that we oppose the industrialization of high-quality productive farm ground, which this is frankly some of the best farm ground in Benton County, probably Iowa and maybe even in the country," he said. Flory also expressed concern about the pollution that would come along with the gas plant, and concerns about air and water quality and the increase of pollution. CBS 2 Iowa reached out to Boland Farms and did not get a response. Alliant Energy sent CBS 2 Iowa the following statement: Input from local governments and community members is a common part of the review process, and Linn County will consider information submitted by interested parties as part of its evaluation of the rezoning request. The Morgan Valley Energy Center site complies with the 2.25-mile setback from population areas that was established by the Linn County Board of Supervisors and remains a critical project to help meet growing energy demand and strengthen the energy system that customers and communities depend on every day. CBS 2 Iowa remain focused on delivering reliable, cost-effective service for customers while participating fully in the review process. The meeting with the Planning and Zoning Commission will be on September 28th. Members of the commission will then present their decision to the Linn County Board of Supervisors for the final ruling. That meeting will likely be in October. SPONSORED CONTENT MORE TO EXPLORE