G

GE Vernova

Builds equipment and software for electric power

Electrical Engineer - Power System Studies

Full-TimeUpdated on 10/23/2026Deadline 10/30/26
CA$75.9k - CA$126.5k+ Discretionary annual bonus
Mid
Bachelor's, Master's
Remote in USA+1 moreMore locations: Remote in Canada
RemoteRemote role; travel up to 10%, including internationally. Canadian-based applicants must be legally authorized to work in Canada.
Electrical EngineeringPower Systems Engineering
No H1B Sponsorship

About the job

Requirements
  • Bachelor’s degree in electrical engineering, including power systems and power electronics subjects, with proven professional experience and technical expertise in power system engineering; experience in AC substations and power plant system studies is preferred.
  • A minimum of 2–3 years of experience in network or transient studies for conventional electric-energy generation, FACTS, renewable energy, or inverter-based power systems in offshore wind, industrial, utility substations, and grid interconnects.
  • Ability and willingness to travel up to 10%, including internationally, and comply with GE Vernova travel guidelines.
  • Professional engineering license and willingness to review and seal your work and the work of others under your supervision is desired.
  • Working knowledge of NERC and FERC compliance requirements and/or ISO interconnection or transmission planning guidelines is desired.
  • Working knowledge of medium- and high-voltage substation North American standards and guidelines, including IEEE and ANSI standards and codes such as the NEC and NESC, local grid codes, and related equipment safety, application, sizing, and integration is desired.
  • Ability to engineer design packages when no clear customer specification is provided is desired.
  • Working knowledge of applicable design calculations for primary and secondary equipment, including battery sizing and DC system component selection, power transformer and circuit breaker selection, circuit protection, control and power cable selection and rating, bus, fittings, insulator and arrester selection, ground grid design, and lightning protection is desired.
  • Must be legally authorized to work in Canada for a Canadian-based position.
  • For a U.S.-based position, must be legally authorized to work in the United States.
  • Citizenships, including dual citizenships, must be from the U.S. Department of Energy’s List of Generally Authorized Countries under 10 CFR Part 810 Appendix A, unless specific authorization is obtained or the candidate is a U.S. citizen, U.S. national, U.S. permanent resident, or protected individual under the U.S. Immigration and Nationality Act.
  • An offer of employment is conditioned upon successful completion of a background investigation; U.S.-based candidates may also be subject to a drug screen.
Responsibilities
  • Perform in-depth power-system studies for EHV/HV substations and support Senior Power System Engineers with those studies.
  • Perform main circuit parameter studies.
  • Perform load-flow, reactive-power capability and compensation, and power-factor studies.
  • Perform short-circuit and combined short-circuit ratio studies.
  • Perform transient switching and insulation-coordination studies, including transient-overvoltage and recovery-voltage analysis, and harmonic performance and stability studies.
  • Perform transient ride-through and dynamic-performance studies, and other design studies using offline simulation tools.
  • Perform overall system performance assessment studies.
  • Perform low-voltage and high-voltage ride-through studies.
  • Perform arc-flash studies.
  • Select and size cables.
  • Integrate dedicated studies for systems using combined AC power sources, including conventional generation, AC battery energy storage systems, turbines, and renewable energy sources.
  • Use frequency- and time-domain simulation tools to perform the specified power-system studies.
  • Collaborate cross-functionally with other engineers and support project documentation and continuous-improvement initiatives.
Desired Qualifications
  • A master's degree in electrical engineering, including power systems and power electronics subjects, with proven professional experience and technical expertise in power system engineering.

About the company

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company Size

10,001+

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2024

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Demand supports expansion: July 2026 results show GE Vernova booked $24.2 billion of quarterly orders, up 88% organically.
  • Service commitments support recurring work: GE Vernova says services account for more than 55% of its backlog.
  • Graduates build depth through rotations: GE Vernova runs two-year Next Gen development programs in engineering, technology, and operations.

What critics are saying

  • Wind remains a drag: July 2026 results show GE Vernova lost $275 million in quarterly Wind segment EBITDA.
  • Project margins absorb overruns: GE Vernova locks prices before completion and discloses meaningful expenses from excess costs and penalties.
  • Field assignments demand long weeks: GE Vernova's listed transformer specialist works typical 12-hour site days, up to six weekly.

What makes GE Vernova unique

  • Its technology underpins global power: GE Vernova says customers generate approximately one-quarter of world electricity using its equipment.
  • Gas turbine scale anchors expertise: GE Vernova reports the largest installed fleet by generating capacity, across approximately 7,000 turbines.
  • Nuclear work reaches beyond equipment: GE Vernova Hitachi supplies advanced reactors, fuel, and services for operating plants.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Paid Vacation
  • Paid Parental Leave
  • Mental Health Support
  • Relocation Assistance
  • Performance Bonus

Company News

Yahoo Finance
Oct 22nd, 2026
GE Vernova Q3 preview: $176B backlog and 145% expected EPS growth ahead of October 28 report

GE Vernova will report third-quarter 2026 results on October 28. Analysts expect earnings of $4.03 per share, up more than 145% from a year earlier. In the second quarter, equipment orders more than doubled and service orders rose 15%. Total backlog climbed to $176 billion. For the third quarter, the company expects Power segment revenue growth of 17%–19% and an EBITDA margin of about 17%–18%, up from 13.3% a year earlier. Electrification revenue is forecast at $3.8 billion–$4.0 billion. The stock is about 26% below its 52-week high, which has eased valuation concerns. Most analysts rate it a "Strong Buy.

Yahoo Finance
Oct 22nd, 2026
GE Vernova up 600% since spin-off, with a $176B backlog: is the dip a buying chance?

GE Vernova's shares have risen nearly 600% since the company was spun off from GE Aerospace in 2024, driven by demand for electricity from artificial intelligence data centres. The stock has been in a lull since April. In the second quarter, its power division's revenue grew 14% to $5.5 billion, while new orders rose 134% to $16.7 billion, mostly for natural gas turbines. Its electrification arm's revenue climbed 68% to $3.6 billion, with orders up 93% to more than $6.3 billion. Total backlog stands at $176 billion, more than three times next year's expected revenue of $53 billion. Manufacturing capacity is the main bottleneck. About 80% of customers are traditional, and 20% are data centres. Most analysts rate the stock a strong buy, with a consensus price target of $1,199.47.

Yahoo Finance
Oct 22nd, 2026
GE Vernova stock down 10.1% as gas turbine prices and $12.5B cash guide face six-month test

GE Vernova stock has fallen 10.1% since April 21, 2026, while the S&P 500 gained 9.8%. Investors appear to be betting that customers will keep paying rising prices for its gas turbines, with cash up front. Management expects at least 125 gigawatts of equipment under contract by the end of 2026. The company's third-quarter results, due around October 28, will show whether turbine prices keep climbing. In July, management said first-half equipment orders were priced more than 20% above fourth-quarter 2025 orders. Full-year free cash flow is due around January 26, 2027. Management raised its 2026 guide to $11.5 billion to $12.5 billion, from $6.5 billion to $7.5 billion. Wind revenue is expected to fall at a low double-digit rate in the third quarter.

Yahoo Finance
Oct 21st, 2026
GE Vernova shares rise 3.5% to $921 as Nvidia tie-up links grid planning to AI; backlog hits $176B

GE Vernova is working with Nvidia on infrastructure and digital-twin tools that link grid planning to the needs of AI factories. The company's shares rose 3.46% to $921.12 at 11:04 EDT on Wednesday. AI facilities need electricity, and GE Vernova supplies equipment that helps deliver it. The collaboration adds a digital planning layer to that opportunity. Through the second quarter, the company reported more than $5 billion in data-center orders, over twice its full-year 2025 total. Quarterly orders hit $24.2 billion, and backlog reached $176 billion, up $13 billion from the previous quarter. Revenue rose 22% to $11.1 billion. Adjusted EBITDA margin reached 11.3%. The next test is execution: turning backlog into revenue and reaching a projected 2026 adjusted EBITDA margin of 12% to 14%.

Yahoo Finance
Oct 16th, 2026
GE Vernova wins five Venture Global grid reservations; $3,400 model target implies 267% upside

GE Vernova has reserved five grid equipment packages for Venture Global, under an agreement signed October 9. GE Grid Solutions will supply transformers and gas-insulated switchgear for up to 21 power island projects, with purchase orders starting in late 2026. Venture Global also reserved eight power islands with GE Vernova, and expects to order its first by the end of 2026. Beyond reservation fees, neither deal binds the buyer; the roughly $17.2 billion total assumes every order proceeds. GE Vernova shares closed at $926.44 on October 15, 21.14% below their June record but up about 42% in 2026. The company's Electrification backlog has grown to $45 billion from $6 billion at the end of 2021. Third-quarter results are due October 28.