G

GE Vernova

Builds equipment and software for electric power

Lead Engineer - Thermal Dynamics

Full-Time
No salary listed
Senior
Bachelor's, Master's, PhD
Bengaluru, Karnataka, India
In PersonRelocation assistance is provided.
Mechanical EngineeringThermal & Fluids Engineering

About the job

Requirements
  • A Bachelor's degree in Mechanical or Aerospace Engineering with specialization in Thermal Science, Thermal and Fluid Engineering, Heat Transfer analysis, or a related field, with a strong academic record.
  • Seven to ten years of relevant experience in heat transfer, secondary flow analysis, or thermal analysis and design for turbomachinery, or comparable experience.
Responsibilities
  • Independently execute heat transfer, secondary flow, and thermal analysis and design activities for flange-to-flange stationary and rotating components across gas turbine and steam turbine products, applying sound engineering principles and adhering to business standards, design practices, procedures, and product requirements.
  • Develop deep technical expertise in the thermal design of turbomachinery components and independently solve design and analysis challenges with strong technical judgment.
  • Execute design and analysis work across conceptual, preliminary, and detailed design phases for New Product Introduction, New Technology Introduction, and product support programs while developing increased autonomy and ownership.
  • Build, assess, and improve thermal analysis models; interpret results; and prepare design review materials with clear conclusions, technical rationale, and actionable recommendations.
  • Apply engineering judgment to evaluate design trade-offs, identify risks, and propose solutions beyond established methods and parameters when appropriate.
  • Contribute to design improvement initiatives, technical problem-solving, and root cause analysis related to thermal performance, heat transfer, and secondary flow systems.
  • Identify and evaluate design-to-cost opportunities across engine hardware, balancing performance, durability, and manufacturing cost implications in partnership with Mechanical, Services, and Systems Engineering teams.
  • Collaborate with global cross-functional teams, including mechanical, aerodynamic, performance, and clearance engineering teams, to deliver integrated design solutions.
  • Use probabilistic methods, digital tools, automation, and artificial intelligence and machine learning techniques where relevant to improve product and process outcomes.
  • Apply Lean principles in daily execution, improve standard work, and contribute to engineering templates, best practices, and process improvements that reduce rework and improve quality.
  • Document technical data, analysis outputs, assumptions, and conclusions in accordance with engineering design templates and established design practices, ensuring complete, accurate, and traceable documentation and model management for assigned projects.
Desired Qualifications
  • A Master's or Ph.D. in Mechanical or Aerospace Engineering with specialization in Thermal Science, Thermal and Fluid Engineering, Heat Transfer, or a related field, with a strong academic record.
  • Demonstrated experience in thermal design and analysis of turbomachinery components, including heat transfer and secondary flow systems.
  • Experience with engineering tools such as ANSYS Thermal, HyperModel, HyperWorks, CFX, ICEM CFD, or equivalent analysis platforms.
  • Experience architecting solutions using programming and scripting languages such as Python, Fortran, Visual Basic, or Java for engineering automation and analysis efficiency.
  • Ability to evaluate and select artificial intelligence and machine learning strategies for long-term design system improvement.
  • Experience using Lean tools to identify, evaluate, and implement innovative solutions.

About the company

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company Size

10,001+

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2024

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Demand supports expansion: July 2026 results show GE Vernova booked $24.2 billion of quarterly orders, up 88% organically.
  • Service commitments support recurring work: GE Vernova says services account for more than 55% of its backlog.
  • Graduates build depth through rotations: GE Vernova runs two-year Next Gen development programs in engineering, technology, and operations.

What critics are saying

  • Wind remains a drag: July 2026 results show GE Vernova lost $275 million in quarterly Wind segment EBITDA.
  • Project margins absorb overruns: GE Vernova locks prices before completion and discloses meaningful expenses from excess costs and penalties.
  • Field assignments demand long weeks: GE Vernova's listed transformer specialist works typical 12-hour site days, up to six weekly.

What makes GE Vernova unique

  • Its technology underpins global power: GE Vernova says customers generate approximately one-quarter of world electricity using its equipment.
  • Gas turbine scale anchors expertise: GE Vernova reports the largest installed fleet by generating capacity, across approximately 7,000 turbines.
  • Nuclear work reaches beyond equipment: GE Vernova Hitachi supplies advanced reactors, fuel, and services for operating plants.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Paid Vacation
  • Paid Parental Leave
  • Mental Health Support
  • Relocation Assistance
  • Performance Bonus

Company News

Yahoo Finance
Oct 16th, 2026
GE Vernova wins five Venture Global grid reservations; $3,400 model target implies 267% upside

GE Vernova has reserved five grid equipment packages for Venture Global, under an agreement signed October 9. GE Grid Solutions will supply transformers and gas-insulated switchgear for up to 21 power island projects, with purchase orders starting in late 2026. Venture Global also reserved eight power islands with GE Vernova, and expects to order its first by the end of 2026. Beyond reservation fees, neither deal binds the buyer; the roughly $17.2 billion total assumes every order proceeds. GE Vernova shares closed at $926.44 on October 15, 21.14% below their June record but up about 42% in 2026. The company's Electrification backlog has grown to $45 billion from $6 billion at the end of 2021. Third-quarter results are due October 28.

Yahoo Finance
Oct 15th, 2026
GE Vernova shares fall 5.5% despite Venture Global deal for up to 16 gas units, 10GW of AI power

Venture Global has signed power and grid frame agreements with GE Vernova and Baker Hughes for up to 16 new 720 MW combined-cycle gas power island units, plus related transformer equipment. The units would supply an off-grid industrial power network that could support as much as 10 GW of future compute capacity. GE Vernova's shares fell 5.5% after the news. The deal shows how its gas turbines and grid equipment are becoming central to behind-the-meter power for LNG operations and AI data centres. The company recently raised its 2026 revenue guidance to $45.5 billion to $46.5 billion, and its free cash flow outlook to $11.5 billion to $12.5 billion. Risks remain in its loss-making Wind business, tariffs, and large, lumpy projects.

Yahoo Finance
Oct 8th, 2026
Cramer tips GE Vernova and Vertiv as data center plays missing from jobs report

Jim Cramer highlighted GE Vernova and Vertiv on 2 October, noting their exposure to data centre growth. He questioned why the jobs report didn't reflect the data centre buildout, suggesting commercial construction is weak whilst data centre projects remain strong. Vertiv's Q2 net sales grew 24% annually, with operating profit up 44%. However, revenue growth of 17.8% missed analyst estimates of 23.6% due to supply chain issues, raising concerns about backlog conversion. The company's capital expenditure surged 285% to $173 million. GE Vernova's shares have risen over 240% since October 2024. Q2 customer downpayments generated a $6.4 billion working capital benefit, pushing free cash flow up 2,532% to $5.1 billion. The company raised its full-year cash flow guidance to $11.5–$12.5 billion from $6.5–$7.5 billion.

Yahoo Finance
Oct 7th, 2026
GE Vernova stock soars 600% in two years, eyes 300% growth by 2032

General Electric spun off its energy division as GE Vernova on 2 April 2024. The stock opened at $142.25 per share and reached a record high of $1,174.86 on 30 June 2026, now trading at about $1,000. GE Vernova operates three segments: Power, Electrification, and Wind. Strong demand from cloud and AI markets drove growth in its Power and Electrification businesses, whilst the Wind segment faced operational challenges. The company's backlog grew 37% year-over-year to $176.3 billion at the end of Q2 2026. Analysts expect revenue and adjusted EBITDA to grow at compound annual growth rates of 17% and 60% respectively from 2025 to 2028. GE Vernova trades at 27 times next year's adjusted EBITDA, with an enterprise value of $262 billion.

Yahoo Finance
Sep 29th, 2026
GE Vernova orders surge 68% as AI data centres drive power demand

GE Vernova, General Electric's former energy division spun off in 2024, is positioned to benefit from surging power demands at AI data centres. The company operates three segments: Power (55% of 2025 orders), Electrification (33%), and Wind (13%), providing turbines, transformers, and grid services. Orders grew 24% organically in the first half of 2026, driven by Power and Electrification segments. By Q2 2026, GE Vernova's backlog reached $176.3 billion — 4.6 times its 2025 revenue of $38.1 billion. The company expects 2026 revenue to grow 20-22%, accelerating from 9% growth in 2025 and 5% in 2024. Fortune Business Insights projects the global AI in power utilities market could expand at a 19.3% compound annual growth rate from 2026 to 2034.