X

X-energy

Develops SMR reactors and TRISO fuel

Project Engineer

Full-Time
$110k - $165k/yr+ 401(k) employer match
Mid, Senior
Bachelor's
Oak Ridge, TN, USA
In PersonFive days in the office per week are required; travel may be up to 10%.
Project & Program ManagementProject Management

About the job

Requirements
  • Bachelor’s degree in engineering, science, or a related technical field from an accredited college or university.
  • For a Level III, typically, five to eight years of engineering, project engineering, technical program management, or related experience in the energy, nuclear, petrochemical, or high-technology hardware or software system development industry. Ten years or more for a Level IV.
  • Demonstrated experience supporting moderately complex technical scope and coordinating multidisciplinary engineering activities in a project-based environment.
  • Demonstrated experience supporting project execution activities, assisting with resolution of moderately complex cross-functional issues, and contributing to delivery across assigned project scope.
  • Working to strong knowledge of engineering design processes, project execution practices, interface management, schedule coordination, and technical documentation control.
  • Experience supporting projects in a regulated environment, including familiarity with quality assurance requirements, configuration management, and controlled technical deliverables.
  • Solid analytical, organizational, and problem-solving skills, with the ability to manage competing priorities within assigned scope.
  • Strong written and verbal communication skills, with the ability to communicate effectively with technical and non-technical stakeholders.
Responsibilities
  • Plan, coordinate, and execute moderately complex engineering scope in alignment with project objectives, schedules, budgets, and deliverable requirements, under the general guidance of senior engineers.
  • Provide technical inputs and support coordination of activities across multidisciplinary engineering teams and cross-functional partners, including project controls, licensing, supply chain, quality, safety, manufacturing, testing, operations, and construction.
  • Support resolution of moderately complex technical, programmatic, interface, and execution issues affecting scope, schedule, quality, and delivery performance for assigned scope, escalating highly complex issues to senior engineers.
  • Support and contribute to project engineering priorities, execution strategies, and integration plans to support timely and high-quality delivery of engineering work products.
  • Track engineering deliverables, interfaces, action items, decisions, assumptions, and technical issues for assigned scope to support disciplined project execution.
  • Support identification of technical, schedule, cost, and execution risks for assigned scope; assist in developing mitigation strategies; and support closure of routine issues in partnership with project and functional leadership.
  • Coordinate with internal and external stakeholders to help ensure technical requirements, deliverable expectations, design interfaces, and execution dependencies are understood and managed for assigned scope.
  • Support integration of assigned engineering work products into broader project execution plans and help ensure alignment with contractual, programmatic, customer, licensing, and regulatory requirements.
  • Participate in and help coordinate technical reviews, design reviews, status reviews, readiness reviews, and cross-functional planning activities for assigned scope to support decision-making and issue resolution.
  • Support development and maintenance of project engineering documentation for assigned scope, including engineering plans, interface management documentation, decision logs, risk registers, action tracking tools, and execution metrics.
  • Support and contribute to make/buy decisions, supplier technical coordination, subcontractor interfaces, and external partner execution activities as assigned.
  • Ensure activities are performed in accordance with applicable company processes, procedures, quality requirements, and regulatory expectations.
  • Actively support the safety culture and ensure integration of quality in all relevant processes by complying with the requirements of the Quality Assurance Program.
  • Provide feedback and informal guidance to less experienced team members, sharing knowledge related to project engineering best practices, execution standards, and integration methodologies, under the guidance of senior engineers.
  • Continue developing subject matter expertise in project engineering execution and contribute to continuous improvement of project delivery processes, tools, and standards.
  • Perform other duties as assigned by manager.

About the company

X-energy designs and develops advanced nuclear reactors and fuel, aiming to commercialize small modular reactors based on a Generation IV high-temperature gas-cooled pebble-bed design and its TRISO-X fuel. The reactor uses ceramic-coated TRISO fuel in pebbles within a modular, sealed unit that operates at high temperatures to generate electricity or process heat, with safety features baked into the fuel and design. It differentiates itself by pursuing a specific Generation IV high-temperature gas-cooled, pebble-bed, TRISO-X fuel approach in a modular platform backed by significant financing to move toward commercialization. The company’s goal is to bring cleaner, safer nuclear energy to the market by completing design, obtaining regulatory clearance, and deploying its SMR technology and fuel at commercial scale.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Rockville, Maryland

Founded

2009

Get referred to X-energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • DOE raised Seadrift support to $2.15 billion on August 13, 2026.
  • NRC issued Long Mott's FONSI in August 2026, clearing a major permitting hurdle.
  • X-energy expanded Gaithersburg to 145,000 square feet, signaling hiring for commercialization and manufacturing.

What critics are saying

  • Waterkeeper's NRC financial-qualifications challenge remains live; denial kills Long Mott's first commercial project.
  • Dow's 4,500-job layoffs and $2.15 billion cost-share expose financing fragility through 2026.
  • NRC safety review still runs through November 2026; any delay pushes commercial revenue beyond 2030.

What makes X-energy unique

  • Xe-100 runs helium-cooled, 750°C reactors for industrial steam, not just electricity.
  • TRISO-X fuel and graphite supply agreements lock safety-critical manufacturing around proprietary reactor design.
  • Dow, Amazon, and Centrica pipeline spans 11-plus gigawatts across industrial and AI demand.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • 401(k) Retirement Plan
  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Paid Time Off
  • Tuition Reimbursement/Professional Development

Growth & Insights and Company News

Headcount

6 month growth

6%

1 year growth

17%

2 year growth

16%
TechCrunch
Oct 19th, 2026
Amazon backs 960MW Indiana nuclear plant with 12 X-energy reactors on former coal site

Amazon will fund a proposed 960-megawatt nuclear plant in Indiana and be the first customer to buy its power, the companies announced Monday. American Electric Power (AEP) would operate the plant, and X-energy, a designer of small modular nuclear reactors, would supply 12 Xe-100 reactors. The plant would sit on the site of a demolished coal plant just south of Terre Haute. It would connect to the public grid, though Amazon says the power would also serve its data centres. The deal is the second between Amazon and X-energy, and three times larger than the first. Amazon led a $700 million Series C-1 round in X-energy in October 2024. The companies plan 5 gigawatts of new US nuclear capacity by 2039. The timeline depends on X-energy delivering its first plant, at Seadrift in Texas, where it has yet to break ground.

Epium Ltd
Oct 7th, 2026
X-energy targets industrial heat with helium-cooled reactors.

X-energy targets industrial heat with helium-cooled reactors. X-energy is developing the Xe-100, a small modular reactor designed to serve industrial manufacturers that need high-temperature heat for concrete, glass, steel, chemicals, plastics and fertilizers. Unlike traditional water-cooled nuclear plants, the Xe-100 would use helium gas as a coolant, allowing higher operating temperatures and lower pressures. The system would produce super-heated steam for direct industrial use, electricity generation of 80 megawatts (MW), or both. The reactor would use TRISO fuel pebbles that are designed to resist corrosion and melting, with fuel continuously moving through the reactor before being recycled or removed as waste. X-energy says the design is intrinsically safe because rising internal temperatures would naturally slow and stop the nuclear reaction. Industrial heating accounts for 18 percent of annual global greenhouse-gas emissions, making high-temperature processes a major target for decarbonization. The Xe-100 could also serve oil production, refining, data centers and electricity markets. X-energy says up to 12 reactors could be clustered to provide 24/7 on-site power. Major hurdles remain: commercial helium-cooled generation has struggled in China, SMR economics are unproven, and the Xe-100 might produce 10 times the spent fuel volume per unit of energy as existing reactors. A TRISO-X fuel factory is due in 2028, while projects with Dow, Amazon and a planned UK fleet target operation in the 2030s. Originally reported by technologyreview.com Read the source

NetDynamic Web Services
Oct 7th, 2026
X-energy's helium-cooled reactors: A new era in energy.

X-energy's helium-cooled reactors: A new era in energy. X-energy is pioneering the development of small modular reactors (SMRs) specifically designed to cater to industries with substantial energy demands, such as concrete, plastics, chemicals, and fibers manufacturing. These sectors require significant amounts of high-temperature heat, which traditional renewable sources like solar panels and wind turbines cannot adequately provide. Often, heavy industrial processes rely on fossil fuels to meet their thermal needs, making a transition to cleaner alternatives essential. Conventional nuclear reactors have limitations due to their reliance on water for cooling, which restricts their operating temperatures. X-energy's innovative Xe-100 reactor addresses this challenge by utilizing helium gas as a coolant. This approach not only allows for higher operational temperatures but also reduces the pressure requirements compared to traditional water-cooled systems. The Xe-100 can produce super-heated steam to directly supply heat or generate approximately 80 megawatts (MW) of electricity, marking a significant step forward in nuclear technology. The Xe-100 reactor employs advanced TRISO (tristructural-isotropic) fuel technology, known for its resilience against corrosion and melting. This fuel is continuously added to the reactor, ensuring a consistent energy output while also promoting safety. In case of power loss, the reactor's design inherently mitigates risks by slowing down the nuclear reaction. Beyond conventional industrial usage, the Xe-100 can also benefit sectors like oil recovery - notably in tar sands extraction - by providing the necessary heat without relying on extensive natural gas supplies. Despite the promising technology, challenges remain for X-energy. The only existing commercial helium-cooled reactors are in China, where operational issues have been reported. X-energy asserts that its vertically integrated fuel supply will lead to reliable performance over a projected reactor lifespan of 60 years. However, economic viability is still unproven; costs associated with SMRs can be significantly higher than solar energy. Additionally, while TRISO technology enhances safety and nonproliferation efforts, it may generate more nuclear waste than traditional reactors. Looking ahead, X-energy is making strides in regulatory compliance, having received a fuel fabrication license for its TRISO-X pebbles, with its first production facility slated for completion in 2028. The company is also pursuing projects to deploy the Xe-100 reactor to power a Dow chemical facility in Texas, which could become operational by the early 2030s. Concurrently, X-energy is collaborating with Amazon to develop a cluster of four Xe-100 reactors in Washington, along with a larger fleet in the UK, both targeting electricity generation in the next decade.

Electricity Info
Sep 28th, 2026
GE Vernova vs x-energy.

GE Vernova vs x-energy. 28th September 2026 Gas turbines have driven much of GE Vernova's recent growth. But the company offers power solutions beyond gas, including a light-water small modular reactor (SMR), the BWRX-300, which its subsidiary manufactures in partnership with Hitachi. Its SMR is a boiling-water nuclear reactor that uses low-enriched uranium (LEU), which is commonly used in traditional reactors. X-Energy is developing its own SMR, the Xe-100, which uses helium gas for cooling instead of water. By using helium gas, the Xe-100 can reach temperatures up to 750 degrees celcius, making it useful for industrial processes such as hydrogen production, chemical manufacturing, and desalination. In addition, the Xe-100 uses tri-structural isotropic (TRISO) pebbles for fuel, which have been called "the most robust nuclear fuel on Earth" by the U.S. Department of Energy. Motley Fool 27th Sept 2026 read more"

MoCoShow
Sep 26th, 2026
X-energy expands Gaithersburg headquarters to 145,000 square feet.

X-energy expands Gaithersburg headquarters to 145,000 square feet. Published September 26, 2026 at 1:00PM X-energy has expanded its planned Gaithersburg headquarters at Washingtonian Center, adding approximately 24,000 square feet to its footprint at 9801 Washingtonian Boulevard. According to Maryland Newsletters, X-energy has taken another floor at the building, which has been rebranded as Waterfront at Washingtonian. The expansion brings the clean energy company's total footprint to approximately 145,000 square feet in the nearly 315,000-square-foot building. The additional space comes after X-energy's lease was already among the area's largest office deals of 2025. In July 2025, X-energy announced plans to consolidate its two Rockville offices into a new headquarters at Washingtonian Center. At the time, the company said the headquarters would encompass approximately 125,000 square feet. X-energy, which specializes in nuclear reactor and fuel design technology, said the move would retain 260 full-time jobs in Montgomery County while creating more than 525 new positions over six years. The company's expansion has also helped fill space previously vacated by major tenants at 9801 Washingtonian Boulevard. According to Maryland Newsletters, the departures of Sodexo, which relocated to Pike & Rose, and Covance had left approximately half of the building vacant. Landlord Prime US REIT has since backfilled much of that space. Montgomery County Economic Development Corporation worked with X-energy ahead of the company's decision to remain and expand in Montgomery County, assisting with local incentive programs, property options, workforce resources and connections with local partners. "We're excited that X-energy is doubling down on Montgomery County," County Executive Marc Elrich said when the headquarters project was announced last year. "This expansion is a win for our residents, bringing hundreds of good-paying jobs and strengthening our position as a center for innovation in clean energy and advanced technology." In addition to its growing Gaithersburg headquarters, X-energy announced plans for a 90,000-square-foot facility in Frederick dedicated to non-nuclear testing and prototyping of advanced reactor components. X-energy was founded in Maryland and CEO J. Clay Sell said when the projects were announced that the company was entering "a period of unprecedented growth."