P

Primero

Global EPC delivers turnkey mineral projects

Plant Operators

Full-TimeUpdated
No salary listed
Senior
Western Australia, Australia
In PersonWork is in the Coastal Region of the Pilbara, Western Australia, on a 2:1 roster.
Building Trades

About the job

Requirements
  • At least 5 years of industrial construction work experience.
  • A flexible work ethic and ability to adapt to changing work environments, including night shift if required.
  • Good communication skills and accuracy in record keeping.
  • Strong safety awareness and values.
  • An OHS Construction Induction White/Blue Card.
  • A Heavy Combination (HC) driver's licence; a Multi Combination (MC) licence is highly desired.
  • Operating tickets for excavator, loader, tipper, skid steer, and water cart.
  • Experience working on fly-in fly-out (FIFO) mining resource projects.
  • For excavator operators, GPS experience and a strong track record of final trim work.
  • Ability to operate semi-trailers and rigid vehicles and provide supporting logistics.
  • Ability to pass a pre-employment medical and drug and alcohol screen.
Responsibilities
  • Operate plant and equipment, including excavators, loaders, tippers, skid steers, and water carts.
  • Work a 2:1 roster in the Coastal Region of the Pilbara, Western Australia.
  • Adapt to changing work environments and work night shifts if required.
Desired Qualifications
  • A High Risk Work Licence for Elevated Work Platform (EWP).
  • Experience in bus driving.
  • Defence driving training.

About the company

Primero is a multinational EPC contractor that delivers turnkey projects in mineral processing, energy, iron ore, and non-process infrastructure. It operates with a vertically integrated model, handling test work, design, engineering, procurement, construction, and ongoing maintenance in-house. Primero earns revenue from engineering, procurement, construction, and maintenance contracts to enable end-to-end project delivery, backed by NRW Holdings. It also runs apprenticeship programs to develop skilled workers and aims to provide reliable, integrated project delivery for global resource projects.

Company Size

501-1,000

Company Stage

IPO

Headquarters

Osborne, Australia

Founded

2011

Get referred to Primero

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ramelius tapped Primero for Mount Magnet expansion on September 14, 2026.
  • NRW's FY26 revenue rose 31.4% to A$4.3 billion, with Primero contributing.
  • Primero opened a new Perth St Georges Terrace head office in June 2026.

What critics are saying

  • Hope Downs 1 must finish by December 2026; delays hit Rio Tinto cash flow.
  • KCGM Growth was due by Q3 2026, compressing commissioning and handover risk.
  • A major KCGM or Hope Downs failure would shut Primero out of Tier-1 miners.

What makes Primero unique

  • Primero delivered Rio Tinto Hope Downs 1 NPI works and Northern Star KCGM megaprojects in 2026.
  • NRW’s FY26 results said Primero drove MET growth through major project execution.
  • Primero recruits North America process engineers, extending minerals-processing capability beyond Australia.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Sick Leave
  • Hybrid Work Options
  • Paid Parental Leave
  • Benefits & Discounts
  • Employee Referral Rewards
  • Flexible Work Hours

Growth & Insights and Company News

6 month growth

1%

1 year growth

1%

2 year growth

2%
Colitco
Aug 28th, 2025
Caravel Minerals Appoints Primero as EPCM for Caravel Copper Project

Caravel Minerals Limited has selected the EPCM contractor, the 'Primero Group Limited', for the Caravel Copper Project in Western Australia where the project is set to operate.

Mining Monthly
Aug 14th, 2023
Australian-made vanadium electrolyte on the cards

NRW Holdings-subsidiary Primero Group has started building Australian Vanadium's vanadium electrolyte manufacturing facility in the northern Perth suburb of Wangara, as part of a recently awarded engineering, procurement and construction contract.

Australian Manufacturing
Aug 14th, 2023
Construction underway for vanadium electrolyte manufacturing facility in WA

Australian Vanadium Limited has signed an engineering, procurement and construction (EPC) contract for engineering group Primero Group to undertake the construction of the firm's vanadium electrolyte facility in Western Australia.

The West Australian
Jul 3rd, 2023
Primero Group wins $973m contract for massive KCGM Fimiston mill expansion | The West Australian

Northern Star Resources has awarded a $973 million engineering, procurement and construction contract to Primero Group for its $1.5 billion KCGM Fimiston mill expansion.

International Mining
Jul 3rd, 2023
NRW's Primero Group awarded major EPC contract for KCGM Growth Project

NRW Holdings says its wholly owned subsidiary Primero Group Limited has entered into an EPC contract with Northern Star Resources Limited for its KCGM Growth Project in Kalgoorlie, Western Australia.