Full-Time

Manufacturing Project Controller

MBDA

MBDA

5,001-10,000 employees

Missile design, development, and manufacturing

Compensation Overview

£40k - £48k/mo

+ Bonus

Letchworth Garden City, UK

Hybrid

Hybrid role; 2-3 on-site days per week in Stevenage.

UK Citizenship Required

Category
Business & Strategy (1)
Required Skills
Forecasting
SAP Products
Data Analysis
Requirements
  • British Citizen or a Dual UK national with British citizenship; Restrictions and/or limitations relating to nationality and/or rights to work may apply; After offer stage, candidate will need to undergo Her Majesty's Government Basic Personnel Security Standard checks (BPSS) managed by MBDA Personnel Security Team.
  • Planning experience ranging from detailed planning to summary level milestone delivery plans.
  • Capability in creating and maintaining project structures (Work Breakdown Structure, Cost Breakdown Structure, Organizational Breakdown Structure).
  • Experience in generating and analysing project performance data (schedule, resource, and cost).
  • Understanding of cost and resource loaded schedules.
  • Experience in managing projects to budget and Cost Control.
  • Experience of Project Management Toolsets (SAP/Asset Resource Management/Primavera/Oracle Unifier/MS Project).
  • Knowledge of Baseline Management and Change Control.
  • Accountability for project data – owning the quality of the project control reporting suite, ability to analyse variances and produce data insight.
  • Ability to influence, work independently and be part of an integrated multi-functional team.
  • Clear communication skills and strong stakeholder management. The ability to foster collaborative working relationships with colleagues at all levels.
  • Ability to prioritise workload and manage conflicting demands.
Responsibilities
  • Validation of Cost Control methods in Project environments - Ability to forecast and apportion costs as accurate and appropriate. The assessment of outlying forecasts, to support the Estimate at Completion and reinforce Project production data. Comparing actuals and forecasts to identify variances to budget, and support mitigation or corrective action.
  • Schedule Assessment - Steering the validation of Project level schedules as accurate, coherent and in accordance with the Programme planning principles. Interfacing into various stakeholders to validate P6 schedules/forecasts across a variety of business disciplines.
  • Integrated Baseline Management - Leading the generation of the Integrated Baseline (budget & schedule) in order to successfully deliver the programme in accordance with planning principles and project governance (change control).
  • Project Reporting – Responsible for producing data to support project health. Analysing cost, schedule, resource and applying insight to key drivers and mitigation activity. Understanding cost and resource loaded schedules which includes accurate forecasting of resources required to meet demand and the analysis of spend vs planned resource.
  • Continuous improvement – Proactively managing challenges, using initiative to drive improvements and standardisation.
Desired Qualifications
  • Risk & Opportunity Management / What-If analysis
  • Critical Path Analysis
  • EVM
  • Experience of working within a manufacturing/operational environment

MBDA designs, develops, and manufactures missiles and related systems for land, sea, and air forces in Europe and among allies. Its portfolio includes Meteor air-to-air missiles, Brimstone and Storm Shadow cruise missiles, Aster surface-to-air systems, and AKERON anti-tank missiles, plus future technologies like AQUILA hypersonic interceptors and DragonFire directed energy weapons. The company operates through national divisions (France, UK, Italy, Germany) and international joint ventures to ensure interoperability and provide full life-cycle support. Its goal is to strengthen sovereign defense capabilities of European customers and their allies by delivering integrated, multi-domain missile and weapons solutions.

Company Size

5,001-10,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Le Plessis-Robinson, France

Founded

2001

Simplify Jobs

Simplify's Take

What believers are saying

  • €44.4 billion 2025 order backlog ensures multi-year revenue from European rearmament.
  • Roxel acquisition in December 2024 integrates propulsion for faster missile innovation.
  • Aster production doubles in 2026 amid Ukraine-driven air defense demand surge.

What critics are saying

  • US DoD terminates MBDA Inc's Special Security Agreement in 2026 over foreign ownership.
  • Rheinmetall's Skyranger undercuts Aster sales across Europe within 6-12 months.
  • Safran sues MBDA in 2025 over Roxel terms, disrupting Aster propulsion supply.

What makes MBDA unique

  • MBDA merges Airbus, BAE Systems, and Leonardo expertise for integrated European missile systems.
  • 45 weapon systems serve 90 armed forces across air, land, and sea domains.
  • National divisions in France, UK, and Italy preserve sovereign capabilities while enabling global scale.

Help us improve and share your feedback! Did you find this helpful?

Your Connections

People at MBDA who can refer or advise you

Benefits

Performance Bonus

Hybrid Work Options

Flexible Work Hours

Parental Leave

Adoption Assistance

Fertility Treatment Support

Meal Benefits

Dental Insurance

Vision Insurance

Health Insurance

Wellness Program

Mentorship Program

Company News

Yahoo Finance
Mar 26th, 2026
MBDA to double Aster missile production in 2026 amid surging European demand

MBDA, Europe's largest missile maker, plans to double production of its Aster air-defence missile in 2026, CEO Éric Béranger announced. The company will increase overall missile output by 40% this year and double its five-year investment plan to support the expansion. The production surge follows heightened European demand for air defences after conflicts in Ukraine and the Middle East exposed capability gaps. MBDA's Aster missiles are used in the SAMP/T system, Europe's only alternative to the American Patriot system. MBDA reported €13.2 billion in order intake for 2025, with its order backlog reaching a record €44.4 billion. Sales rose to €5.8 billion from €4.9 billion. Europe accounted for 70% of orders, reflecting the region's rearmament efforts. The company, owned by Airbus, BAE Systems and Leonardo, had already doubled missile production between 2023 and 2025.

MBDA
Sep 5th, 2025
MBDA Employees revealed as finalists for the 2025 LGBTQ+ Defence Awards

Story MBDA employees revealed as finalists for the 2025 LGBTQ+ Defence Awards.

MBDA
May 22nd, 2025
MBDA invests in UK SME, maker of the innovative Hydra drone

MBDA has invested in Hybrid Drones Ltd, a UK SME that produces the pioneering hybrid Jet-Electric Hydra 400 un-crewed aerial vehicle (UAV).This is one of the first investments by MBDA in a UK SME and a step towards future defence partnerships.

GlobalData
Jan 8th, 2025
MBDA acquires full stake in Roxel

MBDA, a European defence group, has successfully completed the acquisition of Roxel, bringing the company into its European defence conglomerate by purchasing the remaining 50% stake from Safran on 19 December 2024.

EDR Magazine
Nov 4th, 2024
Exocet: an evolving family by MBDA

As the Block 3 maintains the same non-coherent seeker of the Block 2 version, to cope with the current and future demanding scenarios in contested and electronically congested environments, and benefiting from latest homing, guidance and navigation technologies, MBDA has introduced an enhanced electronic package for the Block 3c, which is centred on a new J-band active coherent seeker provided by Thales.