S

Shimmick

Infrastructure contractor for water, energy, resilience

Project Scheduler

Project ManagementConfirmed live in the last 24 hours
Full-time$115k - $145k /yr

About the Job

Requirements

  • A bachelor's degree in Engineering, Construction Management, Business, or a related field, plus 2 years of relevant project scheduling experience, or demonstrated equivalency of experience and/or education.
  • Proficiency in Primavera P6 scheduling software.
  • Must pass a pre-employment substance abuse test if offered the position.

Responsibilities

  • Understand planning and scheduling concepts and principles, including their effects on financial performance.
  • Use data sources and perform detailed schedule development.
  • Identify and investigate project schedule variances.
  • Collect and update data, and produce scheduling reports.
  • Assist in developing and maintaining the work breakdown structure (WBS) and support activities to implement applicable coding; perform baseline development.
  • Support gathering and assembling data for schedule updates.
  • Measure project schedule progress and gather and assemble data for schedule and network updates.
  • Gather data for schedule baseline development and maintenance.
  • Use construction drawings, specifications, and construction contracting methods.
  • Apply critical path method (CPM) scheduling concepts and develop detailed engineering, procurement, and construction logic.
  • Apply scope control, change management, and earned value methodology concepts and principles.
  • Prepare monthly reports.
  • Participate in planning and scheduling meetings to gain insight into planning and scheduling issues.
  • Apply cost baseline fundamentals, concepts, and principles.
  • Perform time impact analysis for project changes.
  • Create bid-time schedules for use in estimating potential projects.

Desired Qualifications

  • 4 or more years of project scheduling experience.
  • Scheduling experience on two heavy civil construction projects within the past 3 years.
  • Experience in heavy civil or industrial engineering, procurement, and construction (EPC) or maintenance projects in cost control, planning, and scheduling positions, or previous field engineering experience emphasizing productivity and cost reporting and tracking.
  • Experience setting up work breakdown structures and establishing levels of control.
  • Experience in cost analysis, forecasting, progress measurement, and earned value performance management (EVMS).
  • Experience in risk analysis, contingency management, and change control.
  • Experience with PRISM, CMIC, Microsoft Office Excel, or other EVMS programs.

About the Company

Shimmick

Infrastructure contractor for water, energy, resilience

Shimmick builds and maintains essential infrastructure across water resources, climate resilience, energy transition, and high-tech construction. Its projects span advanced water treatment systems, dams, water supply, and other critical facilities, using a mix of engineering expertise and collaborative delivery methods to deliver predictable, high-quality results. The company differentiates itself through a national leadership position, recognized by ENR as a top contractor in its core markets, and by combining deep engineering heritage with practical execution and a strong safety and quality focus. Its goal is to support sustainable, resilient communities by delivering reliable infrastructure that protects the environment while enabling progress in energy and technology sectors, with a strong footprint in the Western United States and selective markets nationwide.

Company size
201-500
Company stage
IPO
Headquarters
Oakland, CA
Founded
1990

Recently Posted Jobs

Explore more opportunities at Shimmick

See more jobs