Full-Time

Mechanical Project Manager

Tutor Perini Corporation

Tutor Perini Corporation

1,001-5,000 employees

Civil, building, and specialty construction contractor

No salary listed

Evansville, IN, USA

In Person

Bachelor's, Master's

Category
Business & Strategy (1)
Required Skills
CAD
Quality Assurance (QA)

Get referred to Tutor Perini Corporation

See people who can refer or advise you

Requirements
  • A bachelor's degree in Mechanical Engineering or a related field.
  • At least 5 years of proven experience in mechanical project management.
  • At least 3 years of experience with mechanical hoisting equipment design and operation.
  • Strong knowledge of mechanical engineering principles, systems, and components.
  • Proficiency in project management software and mechanical design tools.
  • Effective communication skills for collaboration with project teams.
  • A detail-oriented approach focused on delivering high-quality mechanical projects.
  • Strong problem-solving abilities and the ability to make decisions in dynamic project environments.
  • Knowledge of environmental and sustainability practices in mechanical engineering.
  • Proficiency in using computer-aided design software.
  • Awareness of mining industry-specific codes and regulations across multiple countries.
  • Proficiency in project design and planning, management, costing, and documentation.
  • The ability to work individually with minimal supervision.
Responsibilities
  • Manage mechanical projects from conceptualization to completion while ensuring adherence to project design specifications and timelines.
  • Collaborate with cross-functional teams, including mechanical and electrical designers, contractors, and project managers, to develop project plans and budgets.
  • Conduct site assessments to determine project feasibility, gather technical requirements, foster client relationships, and perform quality assurance and quality control checks throughout the process.
  • Oversee the installation, testing, and commissioning of proprietary system designs while ensuring compliance with safety standards and regulations.
  • Ensure projects meet specifications, deadlines, and quality standards.
  • Analyze project requirements and develop detailed plans to present to the customer.
  • Develop and manage project scopes, schedules, resources, and budgets for hoist-related projects.
  • Work with design teams to ensure engineering plans meet technical requirements and regulatory standards and are workable in the field for installation.
  • Coordinate with customers, contractors, suppliers, and regulatory authorities to facilitate project execution.
  • Conduct risk assessments and implement safety measures throughout project phases to meet customer expectations and regulatory requirements.
  • Monitor and report project progress to Frontier-Kemper Lake Shore management, the customer, and downstream workflows, identifying and addressing potential issues.
  • Conduct quality inspections and ensure adherence to mechanical codes and standards.
  • Provide technical support and guidance to project teams.
  • Stay updated on the latest engineering technologies and best practices.
Desired Qualifications
  • A master's degree in Mechanical Engineering or a related field.
  • A Professional Engineer license and/or relevant certifications.
  • At least 5 years of experience supporting underground mining operations.
  • Familiarity with automation and control systems.
  • Experience with project management tools and software.
Tutor Perini Corporation

Tutor Perini Corporation

View

Tutor Perini provides civil, building and specialty construction services for private clients and public agencies around the world, handling large, complex projects such as highways, bridges, tunnels, mass transit, hotels and casinos, government facilities, schools and healthcare buildings. Its work is delivered through a family of companies that offers end-to-end construction capabilities, including planning, electrical, mechanical, plumbing, HVAC, fire protection and pneumatically-placed concrete, with in-house project management to control schedule and cost. The company differs from competitors by its long history (since 1894), breadth across civil, building, and specialty trades, and its position as a one-stop shop that manages risk, schedule and delivery for large infrastructure and building projects. Its goal is to complete large, sophisticated infrastructure and building assignments on time and within budget while expanding market leadership in its key sectors.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Los Angeles, California

Founded

1894

Get referred to Tutor Perini Corporation

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 revenue hit $1.64 billion, up 19%, with operating margin at 7.2%.
  • July 2026 refinancing cut senior note rates to 6.625% and saves $21 million annually.
  • Death Valley and Kodiak add $151.3 million of federal backlog through 2028 and 2029.

What critics are saying

  • Philadelphia judgments totaling $217.1 million on W and Element hotels remain a headline overhang.
  • Claims and unapproved change orders still totaled $763 million at June 30, 2026.
  • A failed W and Element appeal plus Hudson Tunnel overruns can swamp equity value.

What makes Tutor Perini Corporation unique

  • Tutor Perini wins federally funded, technically messy jobs like Hudson Tunnel and Death Valley.
  • Frontier-Kemper and Perini Management Services give it civil, tunnel, and federal infrastructure reach.
  • Its $19.9 billion backlog and $200 billion pipeline support multiyear revenue visibility.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

401(k) Retirement Plan

Flexible Work Hours

Company News

Yahoo Finance
Aug 9th, 2026
Tutor Perini lands $69.5M Death Valley water system rehab contract

Tutor Perini's subsidiary Perini Management Services has secured a $69.5 million contract to rehabilitate water and wastewater treatment systems at Death Valley National Park. The project includes upgrades to potable water wells, a reverse osmosis facility, chlorination systems, and replacement of sewer infrastructure. Work is scheduled to begin in autumn 2026, with substantial completion targeted for early 2029. The contract will be added to Tutor Perini's backlog in the third quarter of 2026. The project expands Tutor Perini's federal work beyond transit and defence into water infrastructure for national parks. The company recently reported quarterly sales of $1.64 billion and has increased its dividend to $0.09 whilst conducting share buybacks.

Yahoo Finance
Aug 5th, 2026
Tutor Perini beats Q2 estimates with $1.64B revenue, up 19.2% year on year

Tutor Perini reported second-quarter results for 2026 that exceeded analyst expectations. The general contracting company posted revenue of $1.64 billion, up 19.2% year on year and beating estimates of $1.57 billion by 4.4%. Non-GAAP earnings per share came in at $1.74, surpassing the consensus estimate of $1.26 by 37.6%. Operating margin improved to 7.2% from 5.6% in the same quarter last year. Management raised full-year adjusted EPS guidance to $5.30 at the midpoint, a 3.9% increase. However, the company's backlog declined 5.9% year on year to $19.86 billion at quarter end. Analysts expect revenue growth of 11.7% over the next 12 months, representing a deceleration from recent performance but still indicating positive momentum.

MarketBeat
Aug 5th, 2026
Tutor Perini (NYSE:TPC) posts quarterly earnings results, beats expectations by $1.07 EPS.

Tutor Perini (NYSE:TPC) posts quarterly earnings results, beats expectations by $1.07 EPS. August 5, 2026 Key points. * Tutor Perini beat quarterly earnings expectations, reporting $1.74 in EPS versus the $0.67 consensus estimate. Revenue reached $1.64 billion, also above analyst expectations of $1.57 billion. * The stock fell 1.6% to $84.38 after the results, despite the earnings beat. Tutor Perini has a $4.44 billion market capitalization and trades near the middle of its $46.51-$100.00 52-week range. * Analyst sentiment remains mixed, with the stock carrying a consensus rating of "Hold" and an average price target of $86.50. Institutional investors own approximately 65% of the company, while an insider recently sold 17,500 shares. * Five stocks we like better than Tutor Perini. Tutor Perini (NYSE:TPC - Get Free Report) issued its quarterly earnings results on Wednesday. The construction company reported $1.74 earnings per share for the quarter, beating the consensus estimate of $0.67 by $1.07, FiscalAI reports. Tutor Perini had a return on equity of 19.92% and a net margin of 1.37%.The company had revenue of $1.64 billion during the quarter, compared to analysts' expectations of $1.57 billion. Tutor Perini trading down 1.6%. NYSE TPC traded down $1.33 during trading hours on Wednesday, hitting $84.38. 651,903 shares of the company's stock were exchanged, compared to its average volume of 651,323. The firm has a market cap of $4.44 billion, a price-to-earnings ratio of 57.40 and a beta of 2.05. The stock has a 50-day simple moving average of $78.34 and a 200 day simple moving average of $79.05. The company has a current ratio of 1.28, a quick ratio of 1.28 and a debt-to-equity ratio of 0.31. Tutor Perini has a 1-year low of $46.51 and a 1-year high of $100.00. Insider transactions at Tutor Perini. In other Tutor Perini news, Director Robert C. Lieber sold 17,500 shares of the stock in a transaction that occurred on Wednesday, May 27th. The stock was sold at an average price of $75.36, for a total transaction of $1,318,800.00. Following the transaction, the director directly owned 149,410 shares in the company, valued at approximately $11,259,537.60. This represents a 10.48% decrease in their position. The transaction was disclosed in a filing with the Securities & Exchange Commission, which is accessible through this link. Company insiders own 15.40% of the company's stock. Institutional inflows and outflows. Several institutional investors and hedge funds have recently bought and sold shares of TPC. Gendell Jeffrey L grew its holdings in Tutor Perini by 95.0% in the fourth quarter. Gendell Jeffrey L now owns 889,915 shares of the construction company's stock worth $59,642,000 after purchasing an additional 433,559 shares during the period. Millennium Management LLC boosted its position in shares of Tutor Perini by 165.2% during the 1st quarter. Millennium Management LLC now owns 383,530 shares of the construction company's stock worth $8,890,000 after purchasing an additional 238,933 shares in the last quarter. Cubist Systematic Strategies LLC grew its stake in shares of Tutor Perini by 397.2% in the 2nd quarter. Cubist Systematic Strategies LLC now owns 292,077 shares of the construction company's stock valued at $13,663,000 after buying an additional 233,335 shares during the period. Nearwater Capital Markets Ltd bought a new stake in Tutor Perini in the 4th quarter valued at about $15,080,000. Finally, Marshall Wace LLP raised its stake in Tutor Perini by 243.1% during the 3rd quarter. Marshall Wace LLP now owns 287,025 shares of the construction company's stock worth $18,826,000 after buying an additional 203,378 shares during the period. 65.01% of the stock is owned by institutional investors. Wall Street analyst weigh in. Several brokerages recently commented on TPC. Wall Street Zen cut Tutor Perini from a "strong-buy" rating to a "buy" rating in a report on Saturday, May 9th. Zacks Research lowered shares of Tutor Perini from a "strong-buy" rating to a "hold" rating in a research note on Tuesday, July 28th. Finally, Weiss Ratings reiterated a "sell (d-)" rating on shares of Tutor Perini in a research report on Friday, July 17th. Two investment analysts have rated the stock with a Buy rating, one has given a Hold rating and one has given a Sell rating to the company's stock. According to MarketBeat.com, the stock presently has an average rating of "Hold" and a consensus price target of $86.50. Discover more Stock Screener Tool Tutor Perini company profile. Tutor Perini Corporation is a leading U.S. construction company that provides diversified general contracting, construction management and design-build services to private clients and public agencies. The company operates through three principal market segments - Civil, Building and Specialty Contractors - serving a broad range of infrastructure and vertical construction needs. In its Civil segment, Tutor Perini delivers heavy civil infrastructure projects including highways and bridges, water management, dams, tunnels and rail systems. Further reading. This instant news alert was generated by narrative science technology and financial data from MarketBeat in order to provide readers with the fastest reporting and unbiased coverage. Please send any questions or comments about this story to [email protected]. Continue following MarketBeat Before you consider Tutor Perini, you'll want to hear this. MarketBeat keeps track of Wall Street's top-rated and best performing research analysts and the stocks they recommend to their clients on a daily basis. MarketBeat has identified the five stocks that top analysts are quietly whispering to their clients to buy now before the broader market catches on... and Tutor Perini wasn't on the list. While Tutor Perini currently has a Hold rating among analysts, top-rated analysts believe these five stocks are better buys. Discover the next wave of investment opportunities with our report, 7 Stocks That Will Be Magnificent in 2026. Explore companies poised to replicate the growth, innovation, and value creation of the tech giants dominating today's markets.

Yahoo Finance
Jul 20th, 2026
Tutor Perini and Korn Ferry shine with strong cash flow, but UFP Industries struggles with declining sales

UFP Industries faces challenges despite its 4.9% free cash flow margin, according to StockStory analysis. The building materials company has seen sales decline 6.2% annually over two years, whilst earnings per share contracted 1.8% annually over five years. Its eroding returns on capital suggest aging profit centres. By contrast, Tutor Perini shows stronger fundamentals with a 12.4% free cash flow margin. The construction company achieved 17% annual revenue growth over two years, whilst earnings per share surged 102% annually. Its free cash flow margin improved by 12.9 percentage points over five years. Korn Ferry also demonstrates solid performance with an 11% free cash flow margin. The consulting firm posted 10.1% annual revenue growth over five years and 26.9% annual earnings per share growth over two years. It maintains an industry-leading 19% return on capital.

BurdaForward GmbH
Jul 17th, 2026
New York builds 4-kilometer tunnel under the Hudson River.

New York builds 4-kilometer tunnel under the Hudson River. Friday, 07/17/2026, 4:34 PM A tunnel project in New York faces problems. The tunnel builders have to freeze part of the ground. In New York City, a new tunnel is to be built connecting Manhattan and New Jersey. The nature of the subsurface on the New York side complicates the project: part of the ground does not maintain its shape when heavy drilling machines dig through it. Therefore, the tunnel builders of the $16 billion project want to freeze the subsurface. The Hudson River project at a glance: * A new railway tunnel is to be built under the Hudson River * The tunnel will be about four kilometers long * The project costs $16.3 billion * It is expected to generate about $20 billion in value * Planned completion is 2035 Hudson tunnel needs 152-meter-long drilling machines. "Basically, it's like drilling through a giant ice cube made of earth," Jim Starace, head of project delivery at the Gateway Development Commission, told "Autonocion" magazine. The company responsible for the construction phase - a joint venture between Frontier-Kemper and Tutor Perini - plans to insert casing pipes into the ground and lay pipes inside them through which cold brine will circulate. This is intended to freeze the surrounding water. And through the then harder ground, according to the theory, the machines can drill better. This would solve the problem of constantly sinking soil that the tunnel builders currently face. Additional challenges include drilling through the "Manhattan Bulkhead" (a concrete structure that reinforces Manhattan's shoreline) and a variety of old structures left in the ground from earlier times. Four tunnel boring machines, each about 152 meters long, will perform the drilling in pairs. One pair will drill from New Jersey and start work later in 2026. The other pair, drilling from Manhattan, will not start before 2028. $20 billion in value. The planned tunnel is just one of several structures that together form the Hudson River project. Overall, it consists of three parts: * The construction of a double-track railway tunnel connecting New Jersey and Manhattan * The construction of a segment that allows the Hudson River tunnel to connect to New York Penn Station * Rehabilitation of an existing North River tunnel that suffered significant damage during Superstorm Sandy in 2012 The Hudson River tunnel project is expected to cost a total of $16.3 billion, which is approximately €14 billion. According to plans, the tunnel will be about four kilometers long, but the entire project will span 7.2 kilometers. It is expected to create 95,000 new jobs, including direct and indirect positions. Over the construction period, it is projected to generate about $20 billion in value. Planned completion: 2035. The goal of the mega-project is to make the national and regional rail network for New Jersey Transit and Amtrak passengers more resilient and reliable. Additionally, the builders hope that the tunnel will strengthen the local and national economy. Delays in the North tunnel. The Hudson River tunnel is also a historic milestone. No intercity railway tunnel has been built under the Hudson River since 1910. The old tunnel is meant to be relieved. Currently, there are repeated complaints because trains in the North Tunnel are frequently delayed.