N

NextEra Energy

Runs a Florida utility and builds wind and solar farms

N Engineer II

Power Systems EngineeringUpdated on Nov 14
Full-timeWest Palm Beach, FL, USANo salary listed

About the Job

Requirements

  • Bachelor's degree in Engineering from an ABET-accredited program.
  • At least 2 years of experience.
  • No nuclear experience is required.

Responsibilities

  • Perform engineering and analytical tasks to develop reliable, cost-effective recommendations.
  • Use advanced computer models to develop and study solution feasibility.
  • Prepare engineering documentation and assist with technical support for licensing and other regulatory proceedings.
  • Ensure procured materials and services meet engineering specifications.
  • Perform engineering root cause analysis and develop cost-effective countermeasures.
  • Perform engineering fundamental activities to support operations.
  • Create special testing, inspection, and acceptance criteria for parts and materials used by external nuclear plant facilities.
  • Develop procurement engineering packages establishing appropriate technical and quality requirements, including selecting critical characteristic attributes for testing.
  • Maintain plant design and licensing basis and use relevant plant changes, procedures, tests, and engineering documents in procurement engineering evaluations.
  • Apply applicable codes and standards, maintain design margin, exercise engineering judgment, and involve the appropriate level of analysis and management review.
  • Be accountable for the cost, timeliness, and quality of engineering products supporting material demands.
  • Perform other job-related duties as assigned.

About the Company

NextEra Energy

Runs a Florida utility and builds wind and solar farms

NextEra Energy owns Florida Power & Light, the regulated utility that supplies electricity to much of Florida, and NextEra Energy Resources, which builds and runs wind, solar, battery storage and nuclear plants across the United States. The company calls itself the world's largest generator of renewable energy from the wind and sun. FPL earns returns set by Florida regulators on the power plants and grid lines it builds, while Energy Resources sells power to utilities, technology companies and other large buyers under long-term contracts. NextEra Energy was formed in 1984 as the holding company for Florida Power & Light, which dates to 1925, and is based in Juno Beach, Florida.

Company size
10,001+
Company stage
IPO
Headquarters
Juno Beach, FL
Founded
1984

Recently Posted Jobs

Explore more opportunities at NextEra Energy

See more jobs