T

T1 Energy

Battery cell producer for EVs

Senior Controls Engineer

Full-TimeUpdated on 10/24/2026
No salary listed
Mid, Senior
Bachelor of Science (BS)
Waterbury, VT, USA
In PersonBased in Waterbury, Vermont; up to 20% travel may be required for commissioning and support at customer sites.
Electrical EngineeringControls & Automation Engineering

About the job

Requirements
  • A Bachelor of Science in Electrical, Industrial, or Mechatronics Engineering, or a four-year degree focusing on applied engineering.
  • Ability to debug and troubleshoot analog and digital programmable logic controller input/output circuits and automated processes.
  • Strong electrical troubleshooting and problem-solving skills.
  • Excellent organizational skills and attention to detail.
  • Strong written and interpersonal skills.
  • Ability to communicate verbally with customers, vendors, and co-workers.
  • Hearing and vision within normal ranges, with or without corrective lenses or an assisted hearing device.
  • Good manual dexterity for occasional wiring, assembly, and DIN-rail device installation.
  • Some lifting is expected; occasional exertion of up to 25 pounds of force may be required.
  • Travel and fieldwork may include hiking, construction work, moving heavy objects, and wearing personal protective equipment for specific tasks.
Responsibilities
  • Provide control system design, programming, and commissioning for grid-scale energy storage systems.
  • Work with clients to translate customer requirements into a project specification document defining scope and deliverables.
  • Develop and define communications datapoint lists for the customer and supervisory control and data acquisition interface.
  • Write and execute Factory Acceptance Test plans, typically at the Waterbury, Vermont production facility, and On-Site Acceptance Testing at customer sites.
  • Assist with design and review of electrical and controls design drawings and equipment lists.
  • Program programmable logic controllers and remote terminal automation controller logic controllers using IEC 61131-3 structured text, function block diagram, and ladder diagram languages.
  • Troubleshoot electrical, controls, and AC/DC inverter power systems and coordinate modifications or corrective actions with engineering and production.
  • Assist with standardizing logic modules and data structures while identifying opportunities to improve efficiency and code consistency.
  • Produce technical documentation and user manuals.
  • Travel up to 20% may be required for onsite project commissioning and support and troubleshooting of existing installations.
  • Maintain quality and safety standards.
Desired Qualifications
  • Two to four years of work experience with programmable logic controller design and programming is preferred.
  • Experience with industrial protocols including Modbus TCP and/or DNP3 is a plus.
  • Proficiency with Microsoft Office software, including Excel and Word.
  • CAD drafting experience, preferably with SOLIDWORKS Electrical, is a plus.
  • Experience with electrical power systems, grid-scale inverters, or battery energy storage systems is a plus.

About the company

FREYR Battery makes battery cells for electric vehicles (EVs) and energy storage systems (ESS) using a Nordic supply chain and large-scale production in Mo i Rana, Northern Norway. The cells store chemical energy for repeated charge-discharge cycles and FREYR uses automated cathode casting to improve production efficiency and consistency, targeting longer cycle life, higher depth of discharge, better round-trip efficiency, and lower levelized cost of storage. Differentiators include a Nordic renewable-energy cluster and full regional supply chain that reduce costs, combined with scale and automation, plus plans to expand into the United States to broaden capacity and market reach. The goal is to provide high-quality, cost-effective battery cells for EVs and ESS while expanding production capacity and geographic reach with a focus on sustainability and profitability.

Company Size

201-500

Company Stage

IPO

Headquarters

Austin, Texas

Founded

2018

Get referred to T1 Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Clearway signed 641 MW in August 2026, anchored by domestic-cell supply.
  • Q2 2026 net sales hit $250.1 million, with adjusted EBITDA $10.7 million.
  • September 2026 secured another $50 million bridge, preserving G2_Austin construction momentum.

What critics are saying

  • First Solar dropped ITC in September 2026, then kept federal patent suits alive.
  • G2_Austin Phase 1 capex rose to $510 million; financing still remains unfinished.
  • Heavy debt and repeated raises signal dilution risk; failure to fund Austin threatens viability.

What makes T1 Energy unique

  • T1 Energy pairs G1_Dallas modules with G2_Austin cells for domestic-content contracts.
  • Q2 2026 output reached 935 MW, proving scale before Austin cell startup.
  • Mo i Rana rezoning and 50-year lease give European optionality beyond solar.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Flexible Work Hours
  • Hybrid Work Options

Growth & Insights and Company News

6 month growth

6%

1 year growth

0%

2 year growth

-17%
Kalkine Media
Sep 29th, 2026
T1 Energy raises $50M in convertible notes to fund G2_Austin solar fabrication plant

T1 Energy has raised $50 million through convertible notes to fund its G2_Austin solar cell fabrication facility. The company entered into a note purchase agreement on 28 September 2026 for 4.75% Convertible Senior Notes due 2031, with expected gross proceeds of $50.4 million. The proceeds will finance construction and equipment purchases for Phase 1 of G2_Austin and general corporate purposes. Following this issuance, T1 Energy's total outstanding notes will reach $170 million. The notes carry an initial conversion price of approximately $4.46 per share and cannot be redeemed before 6 August 2029. They mature on 1 August 2031. The company described the funding as a bridge to a comprehensive financing solution for remaining capital expenditures.

Simply Wall St
Sep 10th, 2026
T1 Energy raises $160M at $4.96 per share, secures Norway data centre rezoning

T1 Energy raised approximately $160 million through a follow-on share sale at roughly $4.96 per share, shortly after securing rezoning approval for a potential data centre project in Mo i Rana, Norway. The company's share price has fallen 37.37% year to date and 42.03% over three months in 2026, despite delivering a one-year total shareholder return of 162.57%. The stock now trades around $4.91, well below the most followed analyst fair value estimate of $10.25 per share. Analysts point to US electricity demand growth driven by AI infrastructure, transport electrification, and manufacturing onshoring as key drivers for T1's solar modules and storage solutions business. However, the company faces risks from reliance on US policy incentives and intensive capital requirements for projects including G2_Austin.

Yahoo Finance
Aug 27th, 2026
T1 Energy gets approval to convert Norwegian facility into 50 MW data center

T1 Energy announced that local officials in Mo i Rana, Norway, have approved rezoning of part of its Giga Arctic facility for data center development. The company expects a 50 MW data center could become operational in 2027, with potential for expansion. T1 holds a position in the grid capacity queue for 396 MW total. The municipal committee approved a permit allowing 161,000 square feet of the campus to be rezoned for industrial use or data center operations. The site benefits from access to low-cost electricity supplied primarily by hydropower. T1 holds a 50-year lease on the location within an industrial park in northern Norway. The company is in discussions with multiple parties regarding the project as part of its value optimisation initiative for European assets.

Yahoo Finance
Aug 19th, 2026
Why Is T1 Energy (TE) Raising Fresh Capital Through A Follow On Offering?

T1 Energy (NYSE: TE) announced a follow-on equity offering, adding new shares to its existing stock base. The transaction is expected to affect the company’s capital structure and funding mix once completed. Management signaled that proceeds are intended to support T1 Energy’s next phase of growth and investment plans. This type of capital raise highlights how equity funding can reshape risk and return, and there are many other companies with similar exposure to consider through 79...

Yahoo Finance
Aug 13th, 2026
T1 Energy secures 641MW deal, raises $120M in convertible notes amid G2 Austin financing delays

T1 Energy reported second-quarter 2026 results, producing 935 megawatts of solar modules at its Dallas facility. The company posted a gross margin of 19.5%, up 300 basis points from the previous quarter, and adjusted EBITDA of $10.7 million. T1 Energy raised $120 million in August through convertible notes due in 2031. The company ended the quarter with $149 million in cash and equivalents. The firm secured a 641-megawatt supply agreement with Clearway Energy Group, adding to its existing 900-megawatt Treaty Oak contract. T1 Energy expects full-year production to reach the high end of its 3.1-to-4.2-gigawatt guidance range. Construction of the Austin facility remains on schedule, with first cell production expected in the first quarter of 2027. The company acquired Topcon intellectual property to eliminate future licensing costs.