T

T1 Energy

Battery cell producer for EVs

Electrical Engineer

Full-Time
No salary listed
Senior
Bachelor's
Austin, TX, USA
In Person
Electrical EngineeringPower Systems Engineering

About the job

Requirements
  • A Bachelor's Degree in Electrical Engineering or equivalent experience is required.
  • At least 7 years of experience in electrical engineering, facilities/utilities projects, or industrial construction is required.
  • Strong knowledge of electrical construction practices, codes, and safety protocols is required.
  • Experience managing projects in large manufacturing facilities, industrial plants, or similar sectors is required.
  • The candidate must be able to solve complex problems, multitask, and drive execution under aggressive schedules.
  • Strong understanding of photovoltaic systems, inverters, and power electronics is required.
  • Experience with electrical design software such as AutoCAD Electrical, PSpice, or ETAP is required.
  • Familiarity with programmable logic controllers, supervisory control and data acquisition systems, and automatic technologies is required.
  • Knowledge of relevant electrical codes and standards, including the National Electrical Code, UL 1703, and IEC 61215, is required.
Responsibilities
  • Oversee electrical utilities systems and energization across all phases of design and construction, ensuring compliance with safety, quality, and regulatory standards.
  • Track site execution, inspections, and contractor quality control in alignment with T1's Quality Assurance and commissioning procedures.
  • Collaborate with the design team to resolve design clashes and field-verify conditions against contract documents.
  • Monitor project costs, compare actuals to budget, and recommend cost-saving measures or value engineering alternatives.
  • Prepare, review, and manage Requests for Information, submittals, contractor invoices, and project schedules.
  • Lead contractor buy-out efforts, including developing bid packages, working with procurement to issue Requests for Proposals, and managing scopes of work and work orders.
  • Serve as the primary interface with ONCOR and other external utilities to ensure successful interconnection and service agreements.
  • Maintain clear communication with contractors, design and engineering partners, and Quality Assurance and commissioning teams.
  • Ensure compliance with electrical codes, industry regulations, including the National Electrical Code, UL, and IEC, and safety standards.
  • Troubleshoot and resolve electrical issues in production lines and equipment.
  • Create detailed documentation, including technical specifications, schematics, and test reports.
Desired Qualifications
  • Experience with large-scale EPC/EPCI projects is preferred.
  • A Professional Engineer license is a plus.

About the company

FREYR Battery makes battery cells for electric vehicles (EVs) and energy storage systems (ESS) using a Nordic supply chain and large-scale production in Mo i Rana, Northern Norway. The cells store chemical energy for repeated charge-discharge cycles and FREYR uses automated cathode casting to improve production efficiency and consistency, targeting longer cycle life, higher depth of discharge, better round-trip efficiency, and lower levelized cost of storage. Differentiators include a Nordic renewable-energy cluster and full regional supply chain that reduce costs, combined with scale and automation, plus plans to expand into the United States to broaden capacity and market reach. The goal is to provide high-quality, cost-effective battery cells for EVs and ESS while expanding production capacity and geographic reach with a focus on sustainability and profitability.

Company Size

201-500

Company Stage

IPO

Headquarters

Austin, Texas

Founded

2018

Get referred to T1 Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Clearway signed 641 MW in August 2026, anchored by domestic-cell supply.
  • Q2 2026 net sales hit $250.1 million, with adjusted EBITDA $10.7 million.
  • September 2026 secured another $50 million bridge, preserving G2_Austin construction momentum.

What critics are saying

  • First Solar dropped ITC in September 2026, then kept federal patent suits alive.
  • G2_Austin Phase 1 capex rose to $510 million; financing still remains unfinished.
  • Heavy debt and repeated raises signal dilution risk; failure to fund Austin threatens viability.

What makes T1 Energy unique

  • T1 Energy pairs G1_Dallas modules with G2_Austin cells for domestic-content contracts.
  • Q2 2026 output reached 935 MW, proving scale before Austin cell startup.
  • Mo i Rana rezoning and 50-year lease give European optionality beyond solar.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Flexible Work Hours
  • Hybrid Work Options

Growth & Insights and Company News

Headcount

6 month growth

9%

1 year growth

3%

2 year growth

-14%
Kalkine Media
Sep 29th, 2026
T1 Energy raises $50M in convertible notes to fund G2_Austin solar fabrication plant

T1 Energy has raised $50 million through convertible notes to fund its G2_Austin solar cell fabrication facility. The company entered into a note purchase agreement on 28 September 2026 for 4.75% Convertible Senior Notes due 2031, with expected gross proceeds of $50.4 million. The proceeds will finance construction and equipment purchases for Phase 1 of G2_Austin and general corporate purposes. Following this issuance, T1 Energy's total outstanding notes will reach $170 million. The notes carry an initial conversion price of approximately $4.46 per share and cannot be redeemed before 6 August 2029. They mature on 1 August 2031. The company described the funding as a bridge to a comprehensive financing solution for remaining capital expenditures.

Simply Wall St
Sep 10th, 2026
T1 Energy raises $160M at $4.96 per share, secures Norway data centre rezoning

T1 Energy raised approximately $160 million through a follow-on share sale at roughly $4.96 per share, shortly after securing rezoning approval for a potential data centre project in Mo i Rana, Norway. The company's share price has fallen 37.37% year to date and 42.03% over three months in 2026, despite delivering a one-year total shareholder return of 162.57%. The stock now trades around $4.91, well below the most followed analyst fair value estimate of $10.25 per share. Analysts point to US electricity demand growth driven by AI infrastructure, transport electrification, and manufacturing onshoring as key drivers for T1's solar modules and storage solutions business. However, the company faces risks from reliance on US policy incentives and intensive capital requirements for projects including G2_Austin.

Yahoo Finance
Aug 27th, 2026
T1 Energy gets approval to convert Norwegian facility into 50 MW data center

T1 Energy announced that local officials in Mo i Rana, Norway, have approved rezoning of part of its Giga Arctic facility for data center development. The company expects a 50 MW data center could become operational in 2027, with potential for expansion. T1 holds a position in the grid capacity queue for 396 MW total. The municipal committee approved a permit allowing 161,000 square feet of the campus to be rezoned for industrial use or data center operations. The site benefits from access to low-cost electricity supplied primarily by hydropower. T1 holds a 50-year lease on the location within an industrial park in northern Norway. The company is in discussions with multiple parties regarding the project as part of its value optimisation initiative for European assets.

Yahoo Finance
Aug 19th, 2026
Why Is T1 Energy (TE) Raising Fresh Capital Through A Follow On Offering?

T1 Energy (NYSE: TE) announced a follow-on equity offering, adding new shares to its existing stock base. The transaction is expected to affect the company’s capital structure and funding mix once completed. Management signaled that proceeds are intended to support T1 Energy’s next phase of growth and investment plans. This type of capital raise highlights how equity funding can reshape risk and return, and there are many other companies with similar exposure to consider through 79...

Yahoo Finance
Aug 13th, 2026
T1 Energy secures 641MW deal, raises $120M in convertible notes amid G2 Austin financing delays

T1 Energy reported second-quarter 2026 results, producing 935 megawatts of solar modules at its Dallas facility. The company posted a gross margin of 19.5%, up 300 basis points from the previous quarter, and adjusted EBITDA of $10.7 million. T1 Energy raised $120 million in August through convertible notes due in 2031. The company ended the quarter with $149 million in cash and equivalents. The firm secured a 641-megawatt supply agreement with Clearway Energy Group, adding to its existing 900-megawatt Treaty Oak contract. T1 Energy expects full-year production to reach the high end of its 3.1-to-4.2-gigawatt guidance range. Construction of the Austin facility remains on schedule, with first cell production expected in the first quarter of 2027. The company acquired Topcon intellectual property to eliminate future licensing costs.