M

Morris-Shea Bridge Co., Inc.

Builds deep foundations for major construction projects

Drill Tender

Building TradesConfirmed live in the last 24 hours
Full-timeUnited StatesNo salary listed

About the Job

Requirements

  • Knowledge of DeWaal Pile installation procedures.
  • Good balance, stamina, and physical strength.
  • Frequently lift, push, and pull up to 50 pounds.
  • Frequently walk, stoop, kneel, bend, reach, and climb.
  • Frequently use an acetylene torch, grinder, shovel, and hammer.
  • Provide steel-toed work boots, a long-sleeve shirt, suitable work pants with no holes, a 25-foot tape measure, a striker, a 12-inch adjustable wrench, and a torch tip cleaner.
  • Work outdoors in all weather extremes and varied ground conditions, at considerable heights with 100% fall protection measures in place.
  • Travel to and adapt to job sites in various geographical locations and conditions.

Responsibilities

  • Assist the drill-rig operator during installation of the DeWaal Pile system.
  • Position the DeWaal tool and attach the sacrificial endplate.
  • Rig reinforcing steel and flag.
  • Troubleshoot and maintain the DeWaal tool.
  • Operate an acetylene-cutting torch, grinder, and motorized equipment.
  • Assist in assembling, rigging, and disassembling equipment.
  • Fuel and grease equipment.
  • Perform other job duties as assigned.

About the Company

Morris-Shea Bridge Co., Inc.

Builds deep foundations for major construction projects

Morris-Shea builds deep foundations for commercial buildings, infrastructure and industrial facilities, creating the underground supports that carry heavy structures. Its crews install concrete and steel piles using methods selected for the ground conditions and loads at each project. The company combines foundation design with installation, and its DeWaal system displaces soil to reduce vibration and the volume of excavated material. It also drills closed-loop geothermal heating and cooling systems for commercial and institutional buildings, earning revenue through contracted construction work. Founded in 1969, Morris-Shea is headquartered in Irondale, Alabama.

Company size
201-500
Company stage
Not listed
Total funding
Not listed
Headquarters
Irondale, AL
Founded
1969

Recently Posted Jobs

Explore more opportunities at Morris-Shea Bridge Co., Inc.

See more jobs