Q

Quanta Services

Builds and repairs power grids and utility networks

Senior Scheduler

Project ManagementConfirmed live in the last 24 hours
Full-timeHeber City, UT, USANo salary listed

About the Job

Requirements

  • A minimum of 6 years of scheduling experience in electrical utility construction, heavy civil, or power delivery infrastructure; construction industry experience is required, and scheduling for design or consulting firms alone does not satisfy this requirement.
  • Demonstrated experience scheduling transmission line, substation, or distribution construction projects.
  • Advanced proficiency in Primavera P6 EPPM in a cloud-hosted environment, including building projects from scratch, establishing baselines, applying approved constraints in accordance with company CPM Technical Standards and contractual requirements, and generating custom reports without relying on templates or IT support.
  • Working knowledge of critical path methodology, resource loading, schedule compression techniques including crashing and fast-tracking, and earned value fundamentals.
  • Experience preparing and supporting time impact analyses and delay claims in a contractor role.
  • Ability to read and interpret construction drawings, one-lines, plan-and-profile sheets, and project specifications sufficiently to validate schedule logic.
  • Strong written communication skills and ability to produce clear, defensible schedule narratives ready for owner submission without heavy revision.
  • Proficiency in Microsoft Office Suite, particularly Excel for schedule data manipulation and reporting.

Responsibilities

  • Develop and maintain Level 3 and Level 4 critical path method schedules for transmission, distribution, substation, and renewable energy projects using Primavera P6.
  • Build project schedules from the ground up during pre-construction, incorporating procurement lead times, permitting milestones, right-of-way constraints, crew mobilization windows, and utility owner outage requirements.
  • Establish and maintain the schedule baseline in coordination with the project manager and owner, documenting agreed-upon scope, logic, and constraints.
  • Update schedules on a defined reporting cycle using actual progress from field reports, daily logs, and foreman input.
  • Develop 2-week, 4-week, and 8-week look-ahead schedules to support field superintendents and crew planning.
  • Perform critical path analysis, monitor float consumption, and analyze schedule variances to identify risks before they cause delays.
  • Prepare monthly schedule narrative reports for internal project controls review and submission to owners and engineers of record.
  • Conduct time impact analyses for owner-directed changes, differing site conditions, weather events, and other schedule-affecting occurrences.
  • Support delay claims and request for equitable adjustment preparation by developing fragnet logic and contemporaneous schedule analysis documentation.
  • Maintain as-built schedule records throughout the project lifecycle to support closeout and post-project dispute resolution.
  • Develop schedule recovery plans for projects falling behind, modeling resequencing, crew additions, and compression options with their cost and risk implications.
  • Integrate schedule data with cost control systems to support earned value management reporting, including cost performance index and schedule performance index trending.
  • Collaborate with the estimating department during the bid phase to validate schedule assumptions in proposals and unit-price bids.
  • Support project managers with resource loading and crew allocation modeling, identifying labor, equipment, and material constraints affecting schedules.
  • Participate in owner progress meetings, present schedule status, and respond accurately to schedule-related questions.
  • Coordinate with procurement to track major equipment delivery dates, including transformers, poles, conductor, and switchgear, and flag procurement-driven float erosion.
  • Represent the company in schedule negotiations with owners and engineers of record, defending schedule positions, time extension requests, and agreed recovery approaches.
  • Serve as a senior scheduling technical resource within Project Controls, applying and supporting enforcement of CPM Technical Standards, standard work breakdown structures, procedures, and quality assurance and quality control requirements established by the Project Controls Manager.
  • Mentor Junior and Project Schedulers by providing technical guidance on Primavera P6, CPM methodology, logic sequencing, schedule analysis, and reporting discipline.
  • Identify and implement improvements to scheduling workflows, templates, and tools in coordination with the Project Controls Manager.
  • Ensure schedules comply with Project Controls procedures, CPM Technical Standards and Requirements, owner contract requirements, and applicable industry standards, including Defense Contract Management Agency 14-point schedule health checks where required.
  • Perform quality assurance and quality control reviews of schedules produced across the project controls team before owner submission, verifying logic integrity, progress accuracy, and compliance with contract schedule specifications.

Desired Qualifications

  • PMI Scheduling Professional certification or Planning and Scheduling Professional certification through AACE International.
  • Experience working within a shared enterprise project structure in P6 EPPM, including multi-project resource pools, global calendars, standardized activity coding, and controlled baseline and layout administration.
  • Familiarity with North American Electric Reliability Corporation and Federal Energy Regulatory Commission interconnection project milestones and utility owner scheduling requirements for transmission projects.
  • Experience supporting FIDIC, Federal Acquisition Regulation, or utility-owner contract environments with defined schedule submission and review requirements.
  • Background in utility construction field operations; prior experience as a crew foreman, field engineer, or project engineer in a construction role is a meaningful differentiator.
  • Experience with schedule risk analysis tools such as Oracle Risk Analysis (Pertmaster) or Safran Risk.
  • Familiarity with Procore, B2W, or similar construction management platforms as they relate to schedule integration.

About the Company

Quanta Services

Builds and repairs power grids and utility networks

Quanta Services builds, upgrades and repairs the power lines, substations, pipelines and communications networks that utilities, power producers and large energy users rely on. It runs its own training school, Northwest Lineman College, which prepares workers for electric line work at campuses in several states. Quanta works through regional operating companies that handle engineering, construction, storm restoration and routine upkeep for their customers. Clients pay under long-term master service agreements for ongoing work and under fixed-price or cost-based contracts for large projects. Quanta was founded in 1997 by combining four electrical contractors and is based in Houston, Texas.

Company size
10,001+
Company stage
IPO
Headquarters
Houston, TX
Founded
1997

Recently Posted Jobs

Explore more opportunities at Quanta Services

See more jobs