G

GE Vernova

Builds equipment and software for electric power

Casting Processor

Machine & Process OperationConfirmed live in the last 24 hours
Full-timeSchenectady, NY, USAIn-person

About the Job

Requirements

  • A high school diploma or GED is required.

Responsibilities

  • Secure job assignments, interpret sequence of operations, obtain required materials, tooling, and equipment using pendant-controlled cranes, fork trucks, pallet jacks, and other equipment.
  • Prepare the work area from drawings, parts lists, written and verbal instructions, and accepted shop practices.
  • Set up, load and unload, and operate parts cleaners and equipment used to produce complex ceramic cores.
  • Prepare, repair, and finish cores using hand tools, cutting machines, and automated inspection equipment.
  • Prepare and assemble wax patterns; set up, load and unload, and operate wax presses; and prepare and assemble wax trees.
  • Prepare molds for dewaxing; set up, load and unload, and operate steam autoclaves and sintering furnaces.
  • Perform borescope inspections of molds.
  • Remove shells and gating from cast parts.
  • Perform alloy checks and surface-finish measurements; set up, load and unload, and operate heat-treating furnaces.
  • Grit blast parts.
  • Conduct airflow and waterflow tests.
  • Perform manual post-cast finishing operations; inspect and certify own work and document it as required.
  • Follow all safety protocols.
  • Identify and implement process-improvement opportunities to improve quality and product flow.
  • Keep work areas and equipment clean and operating safely; participate in and own environmental, health, and safety initiatives.

Desired Qualifications

  • One to three years of manufacturing experience is preferred.

About the Company

GE Vernova

Builds equipment and software for electric power

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company size
10,001+
Company stage
N/A
Total funding
$17.6M
Headquarters
Cambridge, MA
Founded
2024

Recently Posted Jobs

Explore more opportunities at GE Vernova

See more jobs