I

IREN

Operates renewable-powered AI GPU cloud infrastructure

Commissioning Project Manager

Project ManagementConfirmed live in the last 24 hours
Full-time

About the Job

Requirements

  • A bachelor's degree in Mechanical Engineering, Electrical Engineering, Construction Management, or equivalent experience.
  • At least 7 years of data center or mission-critical commissioning experience, including full Level 1 through Level 5 delivery on at least two projects.
  • Demonstrated experience managing a third-party Commissioning Authority as a vendor, including specification, procurement, contract, performance, and change management.
  • Working knowledge of medium-voltage distribution, UPS, generators, chilled-water and liquid-cooling plants, and BMS/EPMS integration.
  • Experience leading an on-site team, including direct reports or a matrixed project team, and running readiness gates while holding contractors and the Commissioning Authority to acceptance criteria.
  • Project-management ownership of commissioning scope, including schedule, budget, change control, and vendor contracts; ability to plan early cluster stand-up with Construction, Operations, and customer technical program managers.
  • OSHA 30 and NFPA 70E awareness.
  • Ability to work on-site at the assigned campus for the duration of the assignment and travel between IREN sites.
  • Authorization to work in the United States.
  • Ability to commute to the site daily or relocate before starting.
  • Ability to provide rotational coverage, including nights and weekends, during Level 3 to Level 5 testing and integrated systems test windows.
  • Ability to complete pre-employment screening, including background check and substance testing, if required by company policy.

Responsibilities

  • Issue the project's Division 1 MEP commissioning specification and Commissioning Authority request for proposal from IREN templates, route them to the Director for review, and lead Commissioning Authority selection with Procurement.
  • Own the Commissioning Authority contract and performance, including scope, staffing levels, scorecards, monthly reviews, and change management; approve its commissioning plan, scripts, methods of procedure, schedule, and final reports; and act as its primary point of contact.
  • Be on site from fit-out start of the project's first building, two months before Level 3; mobilize the team and Commissioning Authority so the IREN commissioning platform, records, and witness plan are in place before the first energization release.
  • Lead, develop, and performance-manage the campus commissioning team and run the daily and weekly commissioning cadence with the Commissioning Authority, crew, trade contractors or general contractor, and Construction.
  • Manage the campus commissioning scope as a project, including the commissioning schedule in Microsoft Project and its feed to the Primavera P6 master schedule; the budget and change control for commissioning services; and early GPU cluster stand-up during Level 4 and Level 5.
  • Hold the Level 3 entry gate by confirming Level 1 and Level 2 records are complete in the IREN platform, recommending entry to the Director, and refusing entry in writing when records are incomplete.
  • Own the project issues log through the Commissioning Authority, drive identification, remediation, and verified closure of deficiencies before each level gate, and chair Level 3, 4, and 5 readiness reviews with the Project Director.
  • Peer-review Construction quality by witnessing hold points and sampling records to the agreed plan; share first-pass rate, defects by discipline, and rework with the quality manager.
  • Coordinate factory witness testing, site acceptance testing, and vendor start-up with Engineering, Procurement, and Operations; ensure vendor evidence arrives progressively before final handoff.
  • Provide commissioning input into construction contracts before award, including Commissioning Authority templates, hold points, and IREN witness rights in general-contractor contracts.
  • Report progress, risks, and KPIs to the Director and project leadership; escalate schedule-versus-standard conflicts early for joint decision.
  • Ensure safe execution of commissioning activity through energization permits, lockout/tagout under the site program, arc-flash and hot-work controls, method-of-procedure reviews, pre-task planning, and change control; exercise stop-work authority and ensure no equipment is energized without the Commissioning Authority's written release.
  • Own turnover sequencing for systems and data halls, agree it with Construction and the Commissioning Authority, maintain it in the commissioning schedule, and lead readiness reviews and walkdowns before each energization and start-up.
  • Coordinate commissioning with HSE, project controls, utility representatives, and the general contractor or trade contractors, including utility energization sequences and protection coordination at the point of interconnection.
  • Own the project's commissioning record set in the IREN platform and the operator training and knowledge-transfer plan delivered with the Commissioning Authority and vendors before each handoff to Operations.
  • Prepare the Level 5 acceptance package for the Director's signature and capture lessons learned at each level gate for the Commissioning Subject Matter Experts and KPI & Lessons Learned Lead.

Desired Qualifications

  • BCxP, CCP, or CxA certification; PMP certification.
  • Commissioning experience with GPU or liquid-cooled data halls, including coolant distribution units and direct-to-chip loops.
  • Experience working under both self-perform and general-contractor delivery models.
  • Experience with CxAlloy or an equivalent commissioning platform, Microsoft Project, and Primavera P6.

About the Company

IREN

Operates renewable-powered AI GPU cloud infrastructure

IREN runs renewable-powered AI cloud and digital infrastructure by operating data centers and GPU clusters. Customers access high-performance NVIDIA GPUs and AI training/inference infrastructure through cloud-based services powered by grid-connected and renewable energy assets. It differentiates itself through full vertical integration of energy assets with compute infrastructure and a focus on North America. The company aims to provide scalable, renewable-powered AI compute for enterprises and developers to support large-scale AI workloads.

Company size
501-1,000
Company stage
IPO
Headquarters
Sydney NSW, Australia
Founded
2018

Recently Posted Jobs

Explore more opportunities at IREN

See more jobs