A

ACCIONA

Global renewable energy and infrastructure company

Grid Integration Studies Engineer

Full-TimeDeadline 11/20/26
No salary listed
Junior
Bachelor's
Madrid, Spain
In Person
Electrical EngineeringPower Systems Engineering

About the job

Requirements
  • A degree in Industrial Engineering with a specialization in Electricity is required.
  • Complementary training in renewable energy integration into the electrical grid is required.
  • Experience with simulations in PSS/E and DigSilent is required.
  • Programming experience in Python is required.
  • Knowledge of grid codes applied to renewable energy is required.
  • At least 2 years of experience is required.
  • Intermediate-to-advanced English proficiency is required.
  • Availability to travel is required.
Responsibilities
  • Identify and reduce risks associated with interconnection, including congestion, planning, and grid-code compliance, as early as possible in project development, especially before the investment decision.
  • Support activities related to grid-code compliance for company projects.
  • Select optimal grid nodes to guide Business Development in finding new projects by developing impact studies that identify optimal or unsuitable nodes on networks of interest, developing methodology, and synthesizing results. Perform studies using the network-modeling software applicable to each country, PSS/E or DigSilent, with Python scripts for automation.
  • During project development before the investment decision, identify interconnection risks, calculate losses and curtailment constraints caused by insufficient grid evacuation capacity, identify potential commercial operation date delays arising from the interconnection process, and preliminarily size equipment to meet grid-code requirements.
  • Prepare specifications defining the scope of studies needed to calculate constraints caused by insufficient grid evacuation capacity and analyze congestion. Participate in evaluating, contracting, and managing consulting firms.
  • Perform or review congestion analyses for Acciona Energía's global project portfolio and estimate expected project constraints based on those analyses, using the applicable network-modeling software and Python scripts.
  • Review Security Constrained Economic Dispatch analysis results for Acciona Energía projects in North America.
  • Analyze grid codes to identify potential risks and technology developments that may be needed.
  • Analyze the connection process to ensure energization and commercial operation dates meet investment schedules.
  • Participate in designing inverters, wind turbines, and connection equipment to ensure grid-code compliance and help calculate project capital expenditure.
  • Coordinate with interconnection colleagues in offices in Chile, Mexico, the United States, and Australia.
  • Coordinate with the Business Development, Energy Management, Engineering, Planning, and Resource departments.
  • Develop scripts to automate studies, analyses, and plotting of results.
  • Determine and update the parameters of static and dynamic models submitted to the grid operator during the interconnection process.

About the company

Acciona builds and operates infrastructure and develops renewable energy assets worldwide. It covers the full project life cycle, from engineering, procurement, and construction to owning, operating, and maintaining power plants and related infrastructure. It differentiates itself through vertical integration and a long history of shifting from general construction to a pure-play renewable and sustainable infrastructure group with a large, globally diversified portfolio. Its goal is to be a leading global developer and operator of sustainable infrastructure, expanding clean-energy capacity and reducing carbon emissions.

Company Size

10,001+

Company Stage

IPO

Headquarters

Madrid, Spain

Founded

1861

Get referred to ACCIONA

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • H1 2026 revenue rose 9.9% to €10.142 billion, showing momentum.
  • ACCIONA closed a £125 million green loan and US$340 million private placement in 2026.
  • Kwinana waste-to-energy and Vertical Earth should lift Infrastructure and Concessions earnings through 2027.

What critics are saying

  • Australia's ACCC probe on East Rockingham threatens a blocked waste-to-energy acquisition in 2026.
  • Silence burned €62 million plus €40 million in 2026 after 2024 production halts.
  • ACCIONA carries €8.243 billion net financial debt, pressuring returns if project execution slips.

What makes ACCIONA unique

  • ACCIONA combines infrastructure contracting with renewables, unlike pure-play peers like Ferrovial.
  • The 2026 Sustainable Impact Financing Framework unifies green, blue, and sustainability-linked funding.
  • Vertical Earth expands ACCIONA's self-execution in Georgia and Florida, strengthening U.S. delivery.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • Tuition Reimbursement
  • Paid Time Off
  • Health Savings Account/Flexible Spending Account
  • Paid Holidays
  • Flexible Work Hours

Growth & Insights and Company News

Headcount

6 month growth

27%

1 year growth

28%

2 year growth

28%
Latham & Watkins LLP
Jul 17th, 2026
Latham & Watkins Advises Acciona on Green Private Placement

Cross-border team represents the company on a green private placement with institutional investors.

Bolsamania
Jul 8th, 2026
Acciona acquires 80% of Vertical Earth to accelerate US infrastructure growth

Acciona has agreed to acquire 80% of Vertical Earth, a Georgia-based infrastructure contractor, consolidating Atlanta as the strategic centre for its Infrastructure division's growth in the United States. The deal is expected to close before year-end, subject to regulatory approvals. Brett Johnson, Vertical Earth's founder and CEO, will retain 20% and continue leading the company. Founded in 1997, Vertical Earth generated revenues of $217 million (€191 million) in 2025 and employs over 600 professionals in Georgia and Florida. The acquisition strengthens Acciona's self-execution capacity in a strategic market. The US represents 20% of the global infrastructure industry, with potential contracts worth $303 billion this year. Acciona's Infrastructure division is expanding across the US with major projects including the SR400 motorway in Atlanta and bridge replacement over the Calcasieu River in Louisiana.

Expansión
Nov 21st, 2025
Acciona injects €40M into Silence

Acciona has injected €40 million into its electric motorcycle subsidiary, Silence, to support growth and strengthen its financial structure. This follows a previous €62 million investment earlier in the year. Silence faced production halts due to low demand and high inventory levels, leading to a temporary employment regulation in 2024. The company's revenue was €18 million in 2024, down from €45.6 million in 2023. The capital now totals €102 million.

Construction Briefing
Oct 8th, 2025
Acciona secures €120m EIB loan to advance R&D

Loan to support digitalisation strategy and sustainability efforts

Global Competition Review
Jul 17th, 2025
Acciona's Waste-to-Energy Merger Scrutiny

The Australian Competition and Consumer Commission (ACCC) is investigating Acciona's proposed acquisition of a competing waste-to-energy facility. This probe is prompting broader discussions on how Australia's merger regulations address issues such as creditor influence, infrastructure contracts, and the demand driven by sustainability.