D

Dominion Energy

Regulated utility delivering electricity and gas

Graduate Intern - Electric Transmission Planning

Internship
$37 - $42/hr+ Bonus eligibility
Bachelor's, Master's, PhD
Glen Allen, VA, USA
In Person
Electrical EngineeringPower Systems Engineering

About the job

Requirements
  • Must have earned a bachelor's degree in an engineering field and be accepted to and working on a master's or Ph.D. degree in engineering from an ABET-accredited engineering program at a four-year or post-graduate college or university.
  • Must have a minimum GPA of 3.2.
  • Must have a graduation date of Fall 2027 or later.
  • Must have a strong understanding of engineering principles and practices.
  • Must have a general understanding of AC/DC fundamentals, including three-phase power systems.
  • Must have an interest in electric utility systems, including generation, transmission, and distribution.
  • Must be able to work cooperatively in a team environment and independently seek knowledge and information.
Responsibilities
  • Assist in evaluating transmission system needs and developing expansion plans.
  • Collaborate with internal teams, including ET Planning, Operations Engineering, and Substation Execution, and external stakeholders, including PJM and Electric Distribution Companies.
  • Support the development of transmission solutions for new substations, data centers, and generator interconnections.
  • Contribute to competitive FERC Order 1000 processes by proposing innovative and cost-effective solutions.
  • Help prepare project scopes, justifications, and presentations for internal and external approvals.
  • Participate in meetings and discussions with PJM and regulatory bodies.
  • Perform other duties as assigned to support the team's objectives.
Desired Qualifications
  • Working knowledge of analysis software packages such as PSS/E, Python, PowerGem's TARA software, and Aspen One-Liner is preferred.
  • Preferred engineering study fields include electrical engineering with a concentration in power systems, computer engineering, or mechanical engineering with a focus on energy systems.

About the company

Dominion Energy delivers electricity and natural gas to residential, commercial, and industrial customers across eight states, with a focus on Virginia, North Carolina, and South Carolina, under a regulated utility framework. Its generation mix includes nuclear, solar, coal, natural gas, and hydro, providing a reliable supply while gradually adding cleaner sources. Customers access services online for account management and outage reporting to improve convenience. The company aims to provide dependable energy at reasonable prices while expanding capacity and advancing the transition to cleaner energy.

Company Size

10,001+

Company Stage

IPO

Headquarters

Richmond, Virginia

Founded

1983

Get referred to Dominion Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 14, 2026 merger package added four years of bill credits and 1,000 jobs.
  • Virginia approved Dominion's $98 million Eli Lilly transmission project, strengthening industrial load growth.
  • Dividend Channel cited Dominion's September 2026 4.07% yield, supporting investor demand.

What critics are saying

  • September 2026 SCC hearings reopened Dominion-NextEra scrutiny, delaying closing into 2027.
  • Microsoft appealed the SCC's September 2026 data-center cost allocation order, threatening pricing discipline.
  • Cumberland County's 3,000-megawatt gas plant faces fierce local resistance and multi-year permitting risk.

What makes Dominion Energy unique

  • Dominion controls regulated electric and gas monopolies across Virginia, Carolina, and South Carolina.
  • Its fleet blends nuclear, solar, hydro, coal, gas, and battery storage.
  • The NextEra deal preserves local utility branding while adding national scale and capital.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Vacation
  • 401(k) Retirement Plan
  • Paid Holidays
  • Tuition Reimbursement

Growth & Insights and Company News

Headcount

6 month growth

1%

1 year growth

1%

2 year growth

1%
WHSV
Oct 19th, 2026
Meet the candidates: Elkton mayor.

Meet the candidates: Elkton mayor. Published: Oct. 19, 2026 at 3:29 PM PDT | Updated: 4 hours ago ELKTON, Va. (WHSV) - Three candidates are running for mayor of Elkton: incumbent Josh Gooden, former mayor Wayne Printz and current town council member Virginia Fulginiti. Josh Gooden. Gooden, who spent 14 years on town council, is seeking another term as mayor. He points to water and sewer projects, financial reserves and downtown revitalization as priorities. He said the town must balance necessary infrastructure work with other community projects. "I think continuing definitely with our infrastructure investment and the fiscal responsibility. I know as a whole of the town, we've got more funds in reserve than we had when I started as mayor. So definitely focusing on those finances as well as making that investment in the infrastructure and balancing the two," Gooden said. "I think definitely focusing on infrastructure in our buildings that the town owns. So making sure that we have that investment made for future generations as well as our residents today to enjoy," Gooden said. "One goal that I've had for my entirety of serving on council is just that revitalization of Elkton. So helping be that voice for our downtown business owners, our property owners as they kind of work to make that investment to better their properties and the business community for Elkton as a whole," Gooden said. Wayne Printz. Printz said he has several priorities, including greater transparency on spending and development. "One of the most important is development. Okay, we've got development coming in all over the place. We need to be able to control it. Needs to be looked at very closely, and you have to make sure there's no favoritism or things going on that are underhanded," Printz said. Printz said Elkton also needs stronger oversight of its finances, faster road repairs and lower utility costs. He said the town must be more careful about how it spends taxpayer money. "We're going to pave roads immediately. We're going to mandate transparency, allow five minutes to speak respectfully. At the meetings, we're going to strictly enforce the American Disability Act, currently not respected. We're going to try to fight a merger between Dominion and Nextra. That is going to raise rates unmercifully, and we already are up so high people can't afford their bills. We're going to totally focus on utility costs that need to come down," Printz said. "I don't think that there has been anyone that's leading the show. No disrespect to anyone, but there are so many things going on. For example, we had this amount of money, which is about $9 million. We had that cash. And we spent it somewhere and then went and borrowed 8.3 million to do our water and sewer," Printz said. Virginia Fulginiti. Fulginiti said she has seen a need for new leadership and felt voters needed another choice. "I want to see Elkton grow, but I want to see it grow correctly. And I think one of the problems that we have with that is we're not bringing in the correct growth. We're bringing in subdivisions and more people, but we're not bringing in any way to sustain those people. We need to have the business and we need to have that revenue to sustain them," Fulginiti said. Fulginiti, who has served on council for four years, said she also wants to improve accessibility and communication with residents. "I just want to be open and accessible to the residents. I want to have a clear mind and I don't want to go in with any pre-planned agenda. My first goal is to definitely redirect them back to the town manager because the manager is the individual who runs and manages the town at the discretion of council," Fulginiti said. "I've seen a huge need for new leadership. To my understanding, this is the first time there's ever been three candidates running for mayor in the town of Elkton. And I feel like the residents and the voters need another choice. And all three of us have the best interest of the town at heart, but it's how we are going to go about making sure those best interests are achieved," Fulginiti said.

VPM
Oct 19th, 2026
SCC staff recommend axing Dominion-NextEra Energy merger as proposed.

SCC staff recommend axing Dominion-NextEra Energy merger as proposed. Published October 19, 2026 at 4:58 PM EDT Updated: As one witness writes, the merger fails to satisfy the Utility Transfers Act. Updated 9 p.m. on oct. 19, 2026. Staff at the Virginia State Corporation Commission have recommended against the proposed $67 billion merger between Dominion Energy and Florida-based NextEra Energy - unless both companies commit to dozens of binding conditions first. The possible deal, which impacts Dominion's business in Virginia and the Carolinas and requires state and federal government oversight, would create the largest electric utility in the United States. In Virginia, a three-person panel of commissioners will evaluate all testimony in the merger case. Commission staff are responsible for reviewing all of the facts and providing their own, independent recommendations to the three presiding commissioners. Staff members do not hold decision-making authority. Other respondents, including Gov. Abigail Spanberger and Clean Virginia, have filed thousands of pages of testimony. Carol Myers, of the Commission's Division of Utility Accounting and Finance, wrote in the 201-page testimony that the Dominion-NextEra proposal fails to satisfy the Utility Transfers Act. That state law governing the merger has a simple enough hook: The utilities must prove that "adequate service to the public at just and reasonable rates will not be impaired or jeopardized." In other words, the combined company must continue to provide reliable electricity without charging ballooning, unjustified prices. Myers wrote that the joint petition, as filed, fails to prove that this merger meets the standard, because "the proposed Merger would expose [Dominion Energy Virginia] to the additional financial and business risks of NextEra's unregulated, competitive businesses." She also wrote that the commitments put forward by the companies - which include time-limited job protections and customer bill credits, the creation of 600 new jobs in Virginia and promises to build a new office tower and maintain Dominion's current leadership - don't do enough to ensure that adequate utility service would be maintained after the merger. The list of 57 conditions presented by Myers includes 25 that were included in the companies' proposals. Collectively, they have committed to holding ratepayers harmless for merger costs, contributing $100 million to energy workforce development programs, and maintaining Dominion Energy Virginia as a separate legal entity - all of which staff also included in their list of conditions. Staff also included the companies' second bill credit proposal, which sees residential customers using 1,000 kilowatt hours in a month receiving $10. That would be applied monthly for four years - accomplished in part by refusing bill credits to data centers. However, testimony was clear that SCC staff don't see this as a "persuasive reason to approve the Merger," only recommending its use because it helps ensure data centers "pay their fair share." But Myers wrote that the deal should require certain "ring-fencing" measures to protect Dominion's finances in the case that NextEra faces bankruptcy. That involves setting up a "bankruptcy-remote special purpose entity" - a holding company which would directly own Dominion Energy Virginia, insulating its assets. Staff asked the utilities if they had considered such an entity, to which they replied it was unnecessary and would prevent Dominion from improving its credit. That's a key part of the pitch - improving Dominion's credit rating results in lower borrowing costs for big investments, which are paid for by ratepayers over the long term. Dominion will need to make immense transmission and generation investments to serve data center demand in Northern Virginia. Staff argued the expected benefits to Dominion's credit rating are outweighed by the risk that NextEra's diverse business portfolio would bring. Similar ring-fencing measures were credited in part with killing a proposed NextEra acquisition of Texas utility Oncor in 2017. They also said the commission should require Dominion Energy Virginia to expand its post-merger board of directors by four people who would be unaffiliated with NextEra. And staff said commissioners should put in writing that NextEra Energy Transmission, a NextEra subsidiary, will not own future transmission projects in Dominion's Virginia service territory. They also recommended extending some workforce protection requirements to 10 years post-merger. Spanberger administration weighs in. Gov. Abigail Spanberger and Chief Energy Officer Josephus Allmond also came out against the merger terms, as currently outlined, in testimony filed Monday. Through testimony by a policy consultant, Spanberger and Allmond outlined must-haves for the deal, saying the SCC should reject the merger unless 10 specific commitments were "substantially addressed or alternative solutions are identified" on ratepayer protections and clean-energy commitments. "With the commitments made in the original filing and supplemental testimony, Dominion and NextEra have not yet satisfied the legal standard that would allow the Commission to approve this transaction," said Allmond in a press release Monday. "This testimony lays out the bold actions that will be required in this transformative moment to ensure just and reasonable rates for Virginia customers resulting from the proposed merger." Chief among these was a $29 monthly rebate for four years and a residential rate freeze for six years (the average monthly bill in 2025 was about $150 for a Virginia household). They also said costs should be shifted from residential power to other ratepayer classes, claiming the change would reduce residents' costs by 25%. Allmond and Spanberger also recommended that Dominion's financing be structured differently, reducing the company's rate of return on equity - in other words, the percentage of its investments that shareholders can earn a profit on. Spanberger and Allmond also said a deal should form a "Zero-Carbon Energy Generation Company" that is separated financially from the new mega-utility, with a Virginia headquarters. Critics of the merger have said that Virginia ratepayers would be exposed to risks from NextEra's investment in other states, and Richmond,where Dominion is headquartered, voted to intervene in the case. Under the administration's demands, the Virginia General Assembly would also need to take action to create a state energy efficiency utility and eliminate Virginia's cap on rooftop solar. All of these policies would need to be backed up by "Mandatory, Comprehensive Enforceability provisions," said Spanberger and Allmond. What's left in the process? In a statement, Dominion and NextEra reiterated their pitch that the merger presents a "generational investment." "As expected in a proceeding of this size and significance, today's testimony reflects a wide range of viewpoints and interests. We are reviewing the filings and will address the issues raised through the Commission's established process," the statement read. That process will include rebuttal testimony and an evidentiary hearing beginning Nov. 17. Parties will file post-hearing briefs, and additional hearings may be scheduled as needed. Written public comments can be submitted until Nov. 12, and telephonic public hearings will be held Nov. 5, 9 and 10. An in-person public hearing will also be held on Nov. 5 at the SCC's courtroom in Richmond, 1300 E. Main St. Commissioners must make a decision by Jan. 11, 2027, due to a provision in state law limiting deliberations to six months. Disclosure: Dominion Energy and Clean Virginia are VPM sponsors.

Yahoo Finance
Oct 19th, 2026
Five low-beta dividend stocks: Pfizer yields 5.83%, Coca-Cola raises payout since 1999

Five defensive dividend stocks offer income with less volatility than the broader market, according to a 24/7 Wall St. analysis. All five have a beta well below 1, meaning they have historically moved less than the market. Pfizer leads with a forward yield of 5.83% at $29.49 a share. AT&T yields 4.77% at $23.27, and its $1.11 dividend uses about 42% of 2026 free cash flow guidance of $18B+. Debt of $144B is its main risk. Dominion Energy yields 4.24%, while Coca-Cola and Colgate-Palmolive each yield 2.27%. Coca-Cola has raised its dividend every year since 1999, and Colgate's next ex-dividend date is October 20, 2026.

WebWire
Oct 5th, 2026
GE Vernova-powered projects receive 2026 POWER Magazine Awards for advancements in energy efficiency and decarbonization.

GE Vernova-powered projects receive 2026 POWER Magazine Awards for advancements in energy efficiency and decarbonization. CAMBRIDGE, MA - WEBWIRE - Monday, October 5, 2026 * Nhon Trach 3&4 Power Plant in Vietnam honored as "Plant of the Year" and "Top Gas Plant" for its role in advancing high-efficiency LNG-fired generation. * Duke Energy's DeBary facility recognized with the "Hydrogen Award" for moving hydrogen from concept and pilot scale into real-world grid operations * Dominion Energy's Parr Station modernization project earns the "Reinvention Award" for its successful revitalization of a historic site to meet modern energy demands. GE Vernova Inc. (NYSE: GEV) is proud to announce that several of its customers have received top honors in the 2026 POWER Awards, an annual program organized by POWER Magazine. These prestigious industry accolades recognize top performers in the electricity-generating industry with annual awards. These awards underscore the success of our collaboration in deploying cutting-edge gas, and decarbonization technologies to accelerate the global energy transition and support security of power supply. * Nhon Trach 3&4: A Benchmark for Vietnam's Energy Future. In Vietnam, the 1.6 GW Nhon Trach 3&4 Power Plant - equipped with GE Vernova's advanced combined-cycle 9HA.02 gas turbines - was honored with the Plant of the Year Award and the Top Gas Plant Award. Owned and operated by PetroVietnam Power Corporation (PV Power), the facility is Vietnam's first LNG-fired power plant. Achieving over 63% combined-cycle efficiency, the plant plays a cornerstone role in Vietnam's Adjusted Power Development Plan VIII (PDP8) by providing the reliable, flexible capacity needed to integrate more renewables into the grid. * Duke Energy DeBary: Leading the Way in Hydrogen Innovation. GE Vernova's collaboration with Duke Energy at the DeBary facility in Florida has been recognized with the POWER Magazine Hydrogen Award. By performing combustion system retrofits on two of the facility's GE Vernova 7E.03 gas turbines, Duke Energy and GE Vernova have moved hydrogen from concept and pilot scale into real-world grid operations, with DeBary recognized as a first-of-its-kind achievement for the U.S. power sector: the nation's first end-to-end system capable of producing, storing, and combusting 100% green hydrogen for commercial peaking power generation. This initiative serves as a model for how utilities can lower the carbon intensity of their existing generation assets while maintaining the reliable, dispatchable power necessary for a modern grid. * Dominion Energy Parr Station: Writing the Next Chapter in a Century of Reinvention Dominion Energy's Parr Station modernization has been honored with the prestigious POWER Magazine Reinvention Award, celebrating the transformation of a site with over 100 years of energy history into a high-performance, flexible power asset. By deploying GE Vernova's LM6000VELOX* package solution, the project delivers the fast-start capability, black start support, and operational flexibility necessary to manage the variability of modern renewable resources. This modernization at Parr Station In South Carolina, successfully bridges a century of service with the demands of a sustainable energy future, providing the grid with the reliable, agile power it needs to evolve. These awards underscore the versatility of GE Vernova's portfolio and our ability to execute complex, high-impact projects globally. From supporting industrial growth in Southeast Asia to pioneering hydrogen-ready infrastructure and advanced generation and storage modernization in the United States, we are proud to provide the technology that helps our customers navigate the complex path toward a more sustainable, reliable, and flexible energy future. ### Notes "Decarbonization", as used in this article, is intended to mean the reduction of carbon emissions on a kilogram per megawatt hour basis. * Trademark of GE Vernova and/or its affiliates. WebWireID361395 This news content was configured by WebWire editorial staff. Linking is permitted. Distribute your news. * Every day, hundreds of individuals and companies choose WebWire to distribute their news. * WebWire places your news within numerous highly trafficked news search engines generating leads and publicity. * Submit Your Release Now!

WAVY-TV 10
Oct 3rd, 2026
27,000 without power due to salt buildup from storm.

27,000 without power due to salt buildup from storm. Posted: Oct 3, 2026 / 11:29 AM EDT Updated: Oct 3, 2026 / 03:14 PM EDT Ask WAVY anything How is Dominion Energy addressing salt buildup on equipment? Which city in Hampton Roads has the most power outages? Why does salt buildup cause power outages according to Dominion? Full Summary Dominion Energy is working to restore power to more than 20,000 customers in Hampton Roads after a coastal storm caused salt buildup on equipment, leading to widespread outages. HAMPTON ROADS, Va. (WAVY) - As more than 20,000 customers across Hampton Roads are without power, Dominion Energy states that they are working to restore power losses caused by salt buildup from last week's coastal storm. More than 9,700 people are without power in Norfolk, according to the Dominion Outage Map, as of 3:15 p.m. Additionally, around 5,200 people in Chesapeake, 1,600 in Virginia Beach, 10,000 in Portsmouth, and 600 in Hampton are without power. Salt has built up on equipment from strong winds, and rain is now activating the salt. Salt buildup conducts electricity, damages equipment, and causes power outages, according to Dominion. As power is restored, Dominion is replacing and upgrading damaged equipment. "We understand outages are frustrating, and we appreciate our customers' patience as crews continue working to restore power," said Dominion Energy spokesperon. Dominion states that restoration efforts will likely continue on into the evening.