P

Primoris Services

Horizontal directional drilling for pipelines

Senior Project Scheduler

Project ManagementConfirmed live in the last 24 hours
Full-timeAurora, CO, USA$130k - $150k

About the Job

Requirements

  • A four-year degree or equivalent work experience in Construction Management, Electrical Engineering, Civil Engineering, Mechanical Engineering, Industrial Engineering, Accounting, Finance, or Project Management.
  • A minimum of five years of P6 scheduling experience is required.
  • PMI-SP or PSP certification is required, or the ability to sit for and pass the exam within six months of hire.
  • A solid understanding of Critical Path Method scheduling practices is required.
  • Expert knowledge of P6 is required.
  • Proficiency in Excel, Microsoft Office, and Microsoft Project is required.
  • The candidate must be able to communicate professionally with field personnel, operations, business development, estimating, engineering, and clients.
  • The candidate must be able to read and understand prints and contracts.
  • The candidate must be able to work with limited direct supervision and solve problems independently.
  • Strong attention to detail and ongoing process-improvement vigilance are required.
  • The candidate must meet all deadlines.
  • The candidate must be able to travel as needed.

Responsibilities

  • Develop and manage resource-loaded schedules.
  • Work with estimating and project-management teams to understand schedule contract requirements.
  • Lead the project team's weekly schedule updates and revisions.
  • Lead project managers and project-controls specialists in preparing required monthly and quarterly scheduling reports for assigned projects, which may include weekly schedule updates, look-ahead schedules, critical-path analysis, schedule-impact analysis, earned-value analysis, creating and analyzing S-curves, resource reporting, and schedule narratives when requested.
  • Maintain an accurate history of schedule development and changes.
  • Create as-built schedules.
  • Complete all schedule deliverables and meet deadlines within assigned projects.
  • Create new project schedules in the system.
  • Attend weekly and monthly owner meetings with the project manager as needed.
  • Assist project managers, directors, vice presidents, and project-controls managers with special reports, requests, analyses, and subcontractor/EPC daily, weekly, and monthly reports to ensure data accuracy.
  • Attend and participate in project-planning meetings.

Desired Qualifications

  • Experience in solar, renewable energy, power generation, or industrial electrical work is preferred.

About the Company

Primoris Services

Horizontal directional drilling for pipelines

SEDD provides horizontal directional drilling (HDD) services for trenchless pipeline installations across oil and gas, telecommunications, electric, water, sewer, and irrigation. It uses a drill head and guidance system to bore beneath obstacles like roads, wetlands, or rivers and install pipes without open-cut digging, handling pipe types such as PE, HDPE, PVC, and steel; it can complete crossings up to 56 inches in diameter and 10,000 feet long with large-bore rigs. The company differentiates itself by handling technically demanding, large‑bore drilling projects for major energy and utility clients and by its history of strategic acquisitions and backing from private equity, now as part of PLH Group. Its goal is to be a leading contractor for energy pipeline and utility projects by expanding its HDD fleet, capabilities, and service footprint while minimizing surface disruption and environmental impact.

Company size
Not listed
Company stage
Not listed
Total funding
Not listed
Headquarters
Casa Grande, AZ
Founded
2007

Recently Posted Jobs

Explore more opportunities at Primoris Services

See more jobs