S

Statkraft

State-owned renewable-energy producer: hydropower, wind

Electrical Engineering Specialist

Full-TimeUpdated on 10/21/2026
No salary listed
Mid
Bachelor's
Florianópolis, State of Santa Catarina, Brazil
In Person
Electrical EngineeringPower Systems Engineering

About the job

Requirements
  • A degree in Electrical Engineering is required.
  • Solid experience in electrical engineering, maintenance, commissioning, or operation of generation or transmission assets is required.
  • Experience with wind and/or solar assets, including BOP, SCADA, or inverters, is required.
  • Advanced English is required for frequent interaction with global teams.
  • Availability for frequent travel is required.
  • Knowledge of substations, transformers, electrical panels, medium- and high-voltage cables, and auxiliary systems is required.
  • Knowledge of protection, control, automation, selectivity, and relay settings is required.
  • Knowledge of grounding, lightning protection systems, power quality, and failure analysis is required.
  • Knowledge of generators, converters, inverters, and wind/solar interfaces is required.
  • Knowledge of technical standards, electrical safety, ONS, ANEEL, and operations and maintenance is required.
  • Knowledge of root cause analysis, failure mode and effects analysis, reliability-centered maintenance, maintenance management, risk management, and reliability indicators is required.
  • Knowledge of medium- and high-voltage electrical testing is required.
  • Knowledge of data, artificial intelligence, and automation applied to engineering is required.
  • Knowledge of Power BI, key performance indicators, and asset/maintenance management is required.
Responsibilities
  • Develop, implement, and monitor technical strategies to increase the reliability, availability, safety, and performance of electrical systems and BOP across Statkraft assets.
  • Lead or support analyses of failures, electrical events, outages, operational restrictions, unavailability, and performance deviations, and propose corrective and preventive actions.
  • Develop, review, and monitor protection and selectivity studies, relay settings, short-circuit analysis, protection coordination, and interfaces with ONS, transmission companies, distribution companies, and suppliers.
  • Propose technical improvements, modernizations, retrofits, and investments based on risk analysis, cost-benefit, availability impact, CAPEX/OPEX, and asset value.
  • Prepare, review, and optimize electrical maintenance plans, inspection criteria, procedures, work instructions, and technical standards for operations and maintenance electrical systems.
  • Support local operations and maintenance during critical events, troubleshooting, system restoration, energization, commissioning, testing, inspections, and planned interventions.
  • Ensure compliance with applicable technical standards, legal, regulatory, corporate, and safety requirements for the assets' electrical systems.

About the company

Statkraft is a state-owned energy company that generates electricity from renewable sources. It operates and owns power plants, including hydropower, wind, and solar facilities worldwide, and sells the electricity produced to markets and customers. Unlike many competitors, it remains wholly owned by the Norwegian state and has never had an IPO, which shapes its long-term, public-sector backing. Its portfolio spans Europe, South America, and Asia, with a history rooted in Norway’s hydropower development. The company aims to be a leading provider of environmentally friendly energy in Europe and to expand its renewable generation globally through reliable, large-scale projects.

Company Size

1,001-5,000

Company Stage

Growth Equity (Non-Venture Capital)

Total Funding

$1.4B

Headquarters

Oslo, Norway

Founded

1895

Get referred to Statkraft

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Hydro signed third Statkraft PPA on 24 August 2026, locking 8.8 TWh revenue.
  • Statkraft approved NOK 80 billion Norwegian reinvestment, including major hydropower upgrades through 2035.
  • The 2026 UK hydrogen sale and Mer merger freed capital for core renewables and grid services.

What critics are saying

  • NVE licensing can stall Høyanger, Mår, and other projects, delaying NOK 80 billion returns.
  • Hydrogen and offshore-wind exits shrink growth options, while 1,000 jobs disappear in 2026.
  • Persistent hydrological shortages or weak power prices can slash output and undermine reinvestment capacity.

What makes Statkraft unique

  • Norway’s state-owned hydropower giant controls Europe’s largest flexible renewable portfolio.
  • Statkraft’s legacy dams, tunnels, and reservoirs create unmatched dispatchability versus wind-only rivals.
  • Its market-operations desk monetizes industrial PPAs and balancing services across power-price volatility.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Hybrid Work Options

Growth & Insights and Company News

Headcount

6 month growth

-1%

1 year growth

-1%

2 year growth

0%
Pulpaper News
Oct 13th, 2026
Voith secures modernization contract from Statkraft.

Voith secures modernization contract from Statkraft. Sima power plant in Eidfjord, Norway. Photo: Voith Published by Statkraft Energi AS has selected Voith to modernize the Sima hydropower plant, a critical asset in Norway's renewable energy infrastructure. Commissioned in 1980, the country's second-largest hydropower plant will undergo extensive modernization of its electrical power and automation systems. The primary goals are to extend the operational lifespan of the station, secure high plant availability for the long term, and reduce the risk of failures and unscheduled downtimes in the future. To avoid costly downtimes, Voith will carry out the comprehensive modernization work while the plant remains in operation. By inte grating new components into existing infrastructure in a carefully managed process, Voith will secure the plant's reliable operation throughout the transition period. This step-by-step approach to replacing the plant's entire control and electrical systems is key to maintaining plant availability and minimizing the risk of unscheduled shutdowns during the extensive upgrades. Voith has full-scope responsibility for the modernization The Sima hydropower plant features two waterways and four generating units. The station has a total installed capacity of 1,120 MW and generates roughly 3,100 GWh of renewable energy annually. Under the contract, Voith will take responsibility for the modernization of the existing control system. As part of the refurbishment, Voith will supply electrical and balanceof-plant equipment, including software that is developed and maintained by in-house specialists. The Sima hydropower plant will be equipped with new automation systems, electrical protection systems, new AC / DC systems and various medium voltage components including cabling. Statkraft is Norway's and Europe's largest producer of renewable energy. Its hydropower plants generate roughly one-third of the country's power output. Statkraft continues to invest in modernizing its hydropower fleet to support reliable renewable energy generation for the future. Voith has collaborated with Statkraft for more than 20 years. "We have partnered with Statkraft for more than twenty years, which gives us in-depth knowledge of their requirements and a clear perspective on the complexities involved in the modernization of the Sima plant," said Oeyvind Holm, Head of Sales Norway at Voith Hydro. "By taking full responsibility for this project, we are able to streamline processes, minimize risks, and ensure a smooth and rewarding experience for everyone involved. We are proud to support Statkraft's commitment to ensuring reliable hydropower generation for the long term." "The Sima hydropower plant is an impressive example of engineering excellence that has been generating electricity since 1980," added Kristin Lindvik, Power Plant Manager at Statkraft. "Our goal is to extend its lifetime in the most sustainable and efficient manner possible. It is crucial that modernizing of such a critical plant is performed Statkraft Internalsafely and efficiently with minimal disruption to our operations and production of renewable power." About Statkraft Statkraft is a leading company in hydropower internationally and Europe's largest generator of renewable energy. The Group produces hydropower, wind power, solar power, and gas-fired power.

Power Technology
Sep 25th, 2026
Statkraft completes sale of UK green hydrogen portfolio.

Statkraft completes sale of UK green hydrogen portfolio. The divestment follows Statkraft's decision to halt all new green hydrogen project development globally. Norwegian renewable energy company Statkraft has completed the sale of its UK green hydrogen development assets, concluding a divestment process first announced in May 2025. Statkraft has transferred its hydrogen portfolio in the UK to Kentron Green Nordic, an entity with Norwegian ownership and operations in the UK. The sale is part of Statkraft's decision to halt the development of new green hydrogen projects across all markets. The company had previously indicated that while it would cease initiating new projects, it was committed to continuing the development of its existing mature portfolio in the UK, seeking investors to progress these ventures into construction and operational phases. Kentron Green Nordic, which develops a range of renewable energy projects including wind farms and green ammonia initiatives, has now acquired Statkraft's UK hydrogen assets. These divested schemes will join a pipeline that already includes the Neptun Tromsø and Neptun Glomfjord green ammonia projects in Norway. Additionally, Statkraft's stake in Grenian Hydrogen, a joint venture, has been sold to its current partners Progressive Energy and Foresight. The company confirmed that its UK operations will continue to contribute to broader group objectives, focusing on investment and development in solar, onshore wind, hydropower and grid stability services. Statkraft's previous strategy included developing green hydrogen projects in European countries including Norway, Germany, Sweden, the Netherlands and Italy. Some of these projects in the UK, including one in Scotland, have obtained external funding, with others shortlisted for possible government support. Earlier this month, Statkraft received planning approval for the Trerice Solar Farm in St Dennis, Cornwall, after winning a planning appeal. The project will feature a 32MW solar farm, a battery energy storage system and related infrastructure. Statkraft stated that the site will produce enough renewable electricity each year to provide power for more than 10,000 homes. Give your business an edge with its leading industry insights.

EuropaWire
Aug 24th, 2026
Statkraft to supply Hydro with 876 GWh of power annually under new long-term agreement.

Statkraft to supply Hydro with 876 GWh of power annually under new long-term agreement. (IN BRIEF) Statkraft and Hydro Energi have signed a long-term power purchase agreement (PPA) securing 876 GWh of annual power supply from 2031 to 2040, representing a total of approximately 8.8 TWh over the contract period, with delivery in Norwegian electricity price area NO5. The agreement follows two additional long-term PPAs signed by Hydro and Statkraft in April 2026, covering 0.9 TWh per year in 2029 and 2030 and 1.3 TWh per year from 2031 to 2038. Statkraft said the latest contract is the third long-term agreement with Hydro this year and will provide stable, competitive power to Hydro's aluminium plants in Norway over the next decade, while Hydro said predictable power at competitive prices is vital to maintaining low-carbon aluminium production for customers in Europe. The companies said long-term power contracts help reduce risk, support predictable prices and revenues, and strengthen industrial competitiveness, jobs and value creation. (PRESS RELEASE) OSLO, 24-Aug-2026 - /EuropaWire/ - Statkraft has entered into a new long-term power supply agreement with Hydro Energi, further strengthening the energy partnership between the two Norwegian companies. Under the new power purchase agreement, Statkraft will deliver 876 GWh of electricity per year to Hydro from 2031 through 2040. The contract covers a total volume of approximately 8.8 TWh over the full agreement period. The electricity will be supplied in Norway's NO5 price area. The agreement adds to two long-term power contracts signed by Statkraft and Hydro in April 2026. Those earlier agreements secured deliveries of 0.9 TWh annually for 2029 and 2030, followed by 1.3 TWh annually from 2031 to 2038. Together, the contracts provide Hydro with greater long-term visibility over electricity supply for its aluminium operations in Norway. Hallvard Granheim, Executive Vice President Markets at Statkraft, said the latest agreement is the third long-term PPA signed with Hydro this year. He said the contracts will help ensure stable and competitive electricity supplies for Hydro's Norwegian aluminium plants over the coming decade. Granheim added that the agreements also underline Statkraft's role as a key power supplier to Norwegian industry. Kari Ekelund Thørud, Executive Vice President of Hydro Energy, said access to predictable, competitively priced electricity is essential for Hydro's aluminium production in Norway. She said the new agreement supports Hydro's ability to supply low-carbon aluminium and related solutions to customers in Europe. Long-term power contracts help reduce exposure to market volatility for both industrial customers and power producers. For industry, they support price predictability and future production planning. For Statkraft, they provide stable revenues and strengthen its position as a supplier to energy-intensive sectors. The companies said such agreements also support industrial competitiveness, employment and value creation in Norway. Hydro is working through several sourcing channels to meet its future power requirements. Alongside long-term agreements with suppliers such as Statkraft, the company is developing new renewable power projects and upgrading assets within its own renewable energy portfolio. The new PPA forms part of Hydro's broader strategy to secure reliable electricity for future aluminium production while continuing to serve European customers with low-carbon materials and solutions. Renew the way the world is powered Statkraft is a leading company in hydropower internationally and Europe's largest generator of renewable energy. The Group produces hydropower, wind power, solar power, and gas-fired power. Statkraft is a global company in energy market operations. Statkraft has around 6,200 employees in 20 countries. Media Contact: Lars Magnus Günther Corporate media relations lead Telephone: +47 912 41 636 E-mail: [email protected] MORE ON STATKRAFT, ETC.: EDITOR'S PICK:

Group Africa Publishing Limited
Aug 21st, 2026
Statkraft applies to build new 257 MW Høyanger K5 and Breidal hydropower plants in Norway.

Statkraft applies to build new 257 MW Høyanger K5 and Breidal hydropower plants in Norway. Home " Energy " Hydropower " Statkraft applies to build new 257 MW Høyanger K5 and Breidal hydropower plants in Norway. Published on Aug 21, 2026 Discover more constructing Project Management Business & Industrial Statkraft has applied to the Norwegian Water Resources and Energy Directorate (NVE) for a licence to build two new hydropower plants - the Høyanger and Breidal plants - in Høyanger municipality, western Norway. The new facilities would replace the existing Høyanger K5A and K5B plants, delivering more renewable power and greater flexible capacity without new reservoirs, additional water resources or changes to existing regulation limits. The project forms part of Statkraft's plan, announced in May 2026, to invest NOK 80 billion in Norway over the next ten years to upgrade and further develop the country's hydropower assets. The investment framework for the Høyanger K5 development is just under NOK 3 billion. Making better use of a regulated watercourse. Høyanger K5A and K5B were commissioned between 1965 and 1979 and played an important role in the development of Høyanger as an industrial community. The plants remain in good condition, but several key components have limited remaining lifetime. Rather than carry out extensive reinvestments in the existing facilities, Statkraft is applying to build new plants that make more efficient use of the already-regulated water resources while securing production for decades to come. Discover more Energy & Utilities Construction Consulting & Contracting "This is a project that will deliver more power and greater flexibility from a watercourse that is already regulated," said Pål Otto Eide, Senior Vice President Development Nordics at Statkraft. "When older hydropower plants are facing major reinvestments, we must assess whether the resources can be utilised more efficiently." The application is one of several hydropower upgrades Statkraft is advancing across Norway, alongside its proposed US$890 million new Mår hydropower plant, as the company modernises ageing assets to raise output and flexibility from existing watercourses. More power and flexibility from existing regulation. Discover more The existing plants have a combined installed capacity of around 109 MW and annual production of approximately 700 GWh. The new plants are being applied for with a combined installed capacity of around 257 MW and estimated annual production of approximately 780 GWh - an increase of around 10 per cent in annual renewable output, alongside an improved ability to produce when demand for power is high. "Increased capacity and flexibility in the Norwegian power system are important for society," Eide said. "With this project, we can get more out of existing regulations and contribute more production during periods of high demand." Licensing, timeline and local impact. If a decision to build is taken, the construction period is estimated at four to five years. The project would generate local and regional ripple effects through the purchase of goods and services, while construction work would also cause local inconvenience, including traffic, noise, dust and temporary rig areas. "Hydropower projects must be assessed thoroughly. Even though this project builds on existing regulations, it will have impacts on the environment and the local community," Eide said. "Through the licensing process, the benefits and disadvantages will be weighed against each other, and the Høyanger community will have the opportunity to provide input during the consultation." Statkraft has been in dialogue with Høyanger municipality and other stakeholders about the plans for several years. NVE will now process the licence application and, as usual, submit it for public consultation, allowing the municipality, affected parties, sector authorities, organisations and others to provide input. If the project is granted a licence and demonstrates sufficient profitability, an investment decision will be made, and a detailed environmental and landscape plan prepared, before construction can begin. Project factsheet: Høyanger K5. Project: New Høyanger and Breidal hydropower plants (replacing Høyanger K5A and K5B) Location: Høyanger municipality, western Norway Developer: Statkraft Regulator: Norwegian Water Resources and Energy Directorate (NVE) - licence application submitted Investment framework: Just under NOK 3 billion Existing capacity: ~109 MW combined (Høyanger K5A and K5B, commissioned 1965-1979) New installed capacity: ~257 MW combined Existing annual production: ~700 GWh New annual production: ~780 GWh (an increase of around 10 per cent) Water resources: No new reservoirs, no additional water, no changes to existing regulation limits Estimated construction period: Four to five years (if approved) Status: Licence application under NVE review, ahead of public consultation

GlobeNewswire
Aug 21st, 2026
Statkraft applies for licence to build new Høyanger K5 hydropower plant.

Statkraft applies for licence to build new Høyanger K5 hydropower plant. August 21, 2026 03:37 ET | Source: Statkraft AS (Høyanger, 21 August 2026) Statkraft applies for a licence from the Norwegian Water Resources and Energy Directorate (NVE) to build a new Høyanger hydropower plant and Breidal hydropower plant in Høyanger municipality. The hydropower plants will replace the existing Høyanger K5A and K5B hydropower plants and provide more renewable power for the industry and increased flexible capacity, without new reservoirs or additional water resources. In May, Statkraft announced plans to invest NOK 80 billion in Norway over the next ten years. A new Høyanger K5 hydropower plant is an important part of the plan to upgrade and further develop Norway's hydropower assets. The investment framework for the development is just under NOK 3 billion. Høyanger K5A and K5B were commissioned between 1965 and 1979 and have played an important role in the development of Høyanger as an industrial community. The plants are in good condition, but several key components have limited remaining lifetime. The alternative to a new plant would be extensive reinvestments in the existing facilities. Statkraft is therefore applying to build new power plants that makes better use of the regulated water resources while securing power production for many decades to come. "This is a project that will deliver more power and greater flexibility from a watercourse that is already regulated. When older hydropower plants are facing major reinvestments, we must assess whether the resources can be utilised more efficiently," says Pål Otto Eide, Senior Vice President Development Nordics at Statkraft. The existing plants have a combined installed capacity of around 109 MW and annual production of approximately 700 GWh. The new plants are being applied for with a combined installed capacity of around 257 MW and estimated annual production of approximately 780 GWh. This represents an increase of around 10 per cent in annual renewable power production and an improved ability to produce when demand for power is high. "Increased capacity and flexibility in the Norwegian power system are important for society. With this project, we can get more out of existing regulations and contribute more production during periods of high demand," says Eide. If a decision to build the power plants is taken, the construction period is estimated at four to five years. The project will generate local and regional ripple effects through the purchase of goods and services. At the same time, construction work will cause local inconvenience, including traffic, noise, dust and temporary rig areas. "Hydropower projects must be assessed thoroughly. Even though this project builds on existing regulations, it will have impacts on the environment and the local community. Through the licensing process, the benefits and disadvantages will be weighed against each other, and the Høyanger community will have the opportunity to provide input during the consultation," Eide continues. Statkraft has been in dialogue with Høyanger municipality and other stakeholders about the plans for several years. NVE will now process the licence application and, as usual, submit it for consultation. The municipality, affected parties, sector authorities, organisations and others may provide input. If the project is granted a licence and demonstrates sufficient profitability, an investment decision will be made, and a detailed environmental and landscape plan will be prepared before construction work can begin. Facts about the new Høyanger K5: * Will replace the existing Høyanger K5A and K5B plants with a new Høyanger K5 hydropower plant and Breidal hydropower plant. * Increases installed capacity from around 109 MW to around 257 MW. * Increases annual production by around 10 per cent, from approximately 700 GWh to approximately 780 GWh. * Does not involve additional water resources, new reservoirs or changes to existing regulation limits. Media contact: Geir Fuglseth, Statkraft AS: +47 913 70 572