Simplify Logo
Clearway Energy

Clearway Energy

Develops and operates utility-scale solar, wind

Manager/Senior Manager - EPC Procurement

Full-TimeUpdated on 9/17/2026
$110k - $180k/yr

+ Annual cash bonus

Mid, Senior
Bachelor's
Houston, TX, USA+3 more

More locations: San Francisco, CA, USA | Scottsdale, AZ, USA | Denver, CO, USA

Hybrid

Three days on-site per week required.

No H1B Sponsorship

About the job

Requirements
  • A bachelor's degree in economics, finance, procurement and supply chain, engineering, or a related field.
  • For the Manager level, 3–5 years of relevant EPC contracting or negotiation experience, plus 2 or more years of management experience managing employees or projects.
  • For the Senior Manager level, 6–8 or more years of relevant experience, plus 4 or more years of management experience managing employees or projects.
  • Excellent written and verbal communication skills, with a strong understanding of contract language and negotiation.
  • Ability to travel up to 10%.
  • Proficiency in Microsoft SharePoint, Microsoft Office Suite including Word, PowerPoint, and Excel, OneNote, and document control.
Responsibilities
  • Support the Director, Procurement, in developing and implementing a sourcing strategy focused on wind engineering, procurement, and construction contractors for new-build and repower projects.
  • Orchestrate competitive RFx bidding and contracting efforts for engineering, procurement, and construction contracts in coordination with development, engineering, construction, legal, finance, and operations and management.
  • Conduct engineering, procurement, and construction bid reviews and contractor performance reviews to assess risks and opportunities and recommend contractor-selection strategies.
  • Oversee bid levelization through an Excel workbook to evaluate baseline variances, identify key cost drivers, and track and report cost movements throughout negotiations.
  • Lead negotiations, identify and mitigate cost and schedule risks, and ensure alignment with Clearway policies.
  • Align major project agreements, including TSA, service and maintenance agreements, PPAs, EPC agreements, and warranties, to mitigate Clearway risks.
  • Review scopes of supply and scopes of work across contracts to identify gaps and establish clear interfaces among parties.
  • Manage relationships with key EPC partners, ensure effective contract management, and drive progress toward MOUs and project milestones.
  • Interface with EPC contractors to gather and analyze market intelligence on emerging trends, tariff impacts, and legislative or policy changes affecting bidding processes and project schedules.
  • Manage bidding strategy development and bidder qualification.
  • Engage cross-functional teams on issues related to wind EPC contracts.
  • Support and facilitate internal resolution of material commercial and technical changes to agreements.
  • Coordinate with Engineering to gather and maintain specifications, scopes of work, and standards for Clearway wind projects.
  • Build relationships with internal teams and external vendors and contractor partners.
  • Support project financing by coordinating inputs from wind EPC contractors and cross-functional teams to address independent engineering questions.
  • Assist in identifying, developing, and implementing contract policies and processes, including continuous process improvements.
Desired Qualifications
  • Project management, contracting, and negotiation experience with large-scale wind, solar, or battery storage development projects.
  • Six or more years of wind contracting experience and an in-depth understanding of engineering, procurement, and construction contracting and turbine technology.
  • Experience in wind, solar, and/or battery energy storage system engineering, procurement, and construction procurement.

About the company

Clearway Energy Group develops and operates renewable energy projects across the United States, including utility-scale solar and wind farms and community solar programs. It owns, develops, and runs solar and wind facilities, selling the electricity they generate to utilities and other large energy customers through long-term power purchase agreements (PPAs). This provides steady revenue and helps customers transition to clean energy. The company also has a controlling interest in Clearway Energy, Inc., acting as a sponsor that develops projects and provides administrative support. Compared with many competitors, Clearway Energy Group emphasizes owning and operating a large portfolio of projects (over 350) and carefully selecting EPC partners to ensure safety and performance. Its goal is to deliver clean, reliable, and affordable energy while advancing the energy transition for utilities, corporations, and communities.

Company Size

501-1,000

Company Stage

Debt Financing

Total Funding

$821.5M

Headquarters

San Francisco, California

Founded

2018

Get referred to Clearway Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 8, 2026 named Steven Ryder CFO, strengthening finance execution.
  • August 25, 2026 Maine selected Clearway for 800 MW wind, a regional flagship.
  • August 10, 2026 BLM advanced Clearway’s 500 MW Nevada solar and 850 MW storage review.

What critics are saying

  • Maine’s 800 MW wind project still needs PUC contracts, permits, and FERC approval.
  • Aroostook transmission failed once in 2023; another delay pushes revenue years out.
  • Rutledge litigation exposed controller-related governance fights; future asset transfers invite more shareholder attacks.

What makes Clearway Energy unique

  • Clearway combines development, ownership, and operations across 27 states, not just project origination.
  • Its 13.9 GW fleet mixes wind, solar, batteries, and flexible dispatchable power.
  • Honeycomb and Spindle show Clearway can finance, build, and contract large storage quickly.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Health Savings Account/Flexible Spending Account

Unlimited Paid Time Off

401(k) Retirement Plan

401(k) Company Match

Life Insurance

Fertility Treatment Support

Adoption Assistance

Parental Leave

Tuition Reimbursement

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

0%

2 year growth

0%
New England News Press
Sep 14th, 2026
Rhode Island Energy conditionally selects 150 MW from proposed 800 MW Maine onshore wind project.

Rhode Island Energy conditionally selects 150 MW from proposed 800 MW Maine onshore wind project. Rhode Island Energy announced Sept. 8 that it has conditionally selected 150 MW of renewable energy from Clearway Energy Group's planned onshore wind project in Aroostook County, Maine. The selection was made under Rhode Island's Affordable Clean Energy Security Act and positions the utility as a participant in a broader, federal procurement initiative in New England. The 800 MW project, if completed, would dwarf any existing onshore wind turbine in the region. Travel Guides & Travelogues Rhode Island Energy conditionally selects 150 MW from Clearway wind project in Maine. Rhode Island Energy will purchase the 150 MW through a long-term power purchase agreement - but nothing has been finalized yet. The selection is conditional, meaning RIE must first begin contract negotiations with Clearway Energy Group. Regulatory review will then follow, with the Rhode Island Public Utilities Commission having to give its approval before the agreement takes effect. The selection was made based on Rhode Island's Affordable Clean Energy Security Act - the state law that directs utilities Pursuing cost-effective clean energy procurementT. This legal framework gave RIE both the authority and the obligation to participate in regional efforts such as this one. This geographical location makes it a plausible location for a development of this scale, although the distance from key load centers makes transmission planning more complex. The selection was determined by a statewide request for proposals led by the Maine Public Utilities Commission. The conditional award was not made in isolation. It emerged from a competitive statewide request for proposals led by the Maine Public Utilities Commission that sought proposals for up to 1,200 MW of renewable energy resources and transmission solutions to strengthen New England's electric grid. Rhode Island Energy joined other New England states Evaluate production proposals as part of a coordinated regional effort - something officials have described as a unique collaboration to jointly pursue large-scale clean energy and transmission solutions. The structure of the call reflects the growing recognition that energy challenges do not end at national borders. By pooling evaluation capacity and aligning procurement goals, participating states can pursue projects on a scale that the efforts of individual states alone are unlikely to support. If completed, the project would be the largest onshore wind turbine in New England. The scale of Clearway's planned development is difficult to put into context without some numbers. The project would be possible with a total output of 800 MW the largest onshore wind turbine in New England after completion - and it wouldn't be nearly that far. It would be more than four times larger than the region's currently largest operating onshore wind turbine. Travel Guides & Travelogues This is not an incremental gain. It's a real step forward in New England's onshore wind capacity. Aroostook County is located in far northern Maine - rural, sparsely populated, with significant land area and solid wind resources. This geographical location makes it a plausible location for a development of this scale, although the distance from key load centers makes transmission planning more complex. If the project moves forward, it would significantly expand New England's renewable energy portfolio and diversify the region's energy supply mix crucial for network reliability as the region continues to reduce its dependence on fossil fuel production. The project supports Rhode Island's climate targets and regional energy security goals. For Rhode Island Energy, this selection isn't just about adding megawatts. It is directly tied to the state's legal climate obligations. Rhode Island's 2021 climate law established binding decarbonization targets and utilities operating in the state are expected to align their procurement strategies accordingly. Greg Cornett, president of RIE, put it this way. "We are committed to providing our customers with a reliable, secure, affordable and increasingly cleaner energy future while supporting the climate requirements of the Rhode Island Act of 2021," he said in the announcement. He also pointed out the project Potential to strengthen New England's energy infrastructure in a broader sense. Rhode Island Energy serves more than 770,000 customers throughout Rhode Island, providing both electricity and natural gas and is a subsidiary of PPL Corporation. With a customer base of this size, securing a renewable energy source at a competitive price over the long term through regional procurement is of great importance to ratepayers. The project is also designed to contribute to regional energy security - delivering electricity generated in New England to customers in multiple states. The generation "in the region" argument is increasingly relevant as policymakers weigh the risks relying too heavily on energy sources or infrastructure that span long distances or have potential bottlenecks. A long-term power purchase agreement. Rhode Island Energy has conditionally selected 150 MW of renewable energy from Clearway Energy Group's planned 800 MW onshore wind project in Aroostook County, Maine. The selection was made under Rhode Island's Affordable Clean Energy Security Act and followed a federal request for proposals led by the Maine Public Utilities Commission. RIE will enter into a long-term power purchase agreement with Clearway, subject to contract negotiations and approval by the Rhode Island Public Utilities Commission. If completed, the 800 MW project would be the largest onshore wind facility in New England - more than four times the size of the region's currently largest operating onshore wind farm. The effort is part of a unique regional collaboration among New England states to pursue large-scale clean energy and transmission solutions. Travel Guides & Travelogues Staff writer Kelly is a veteran writer with 15 years of experience exploring the big stories that shape its world, from technological breakthroughs and space exploration to climate, energy, and the fascinating quirks of science. She has a talent for transforming complex ideas into sharp, memorable insights that stay with readers long after they've finished reading.

Recharge
Sep 11th, 2026
Perigus, Synera and Clearway Energy top this week's wind industry moves.

Perigus, Synera and Clearway Energy top this week's wind industry moves. New executive appointments announced at several wind farm developers, with one former Orsted employee taking the reins as CEO * Journalist Published 11 September 2026, 03:49 As the flurry of September moves continues, there were new executive appointments at wind power developers Perigus, Synera Renewable Energy and Clearway, while there was a new senior hire at turbine supplier Vestas. Taiwanese offshore wind developer Synera appointed a former Orsted director as its new chief executive. Sahand Holm announced that he has taken on the role of group CEO, having joined as chief technology officer in 2024 from the Danish developer. Synera had until recently been led by Yep Min Teo, who took over as CEO in June last year. His LinkedIn page states he left the company in May. Perigus Energy, the former onshore wind business of Orsted that was recently acquired and relaunched by Copenhagen Infrastructure Partners, appointed Tom O'Brien as its new independent chair and non-executive director. O'Brien had retired as managing partner of Canadian multinational Brookfield Asset Management last year. Perigus promoted Eamonn Boland into a newly created role of chief commercial officer. Declan McCarthy - another Brookfield veteran - meanwhile joined the company as chief financial officer. Both appointments will be based in the Irish developer's Cork headquarters. Vestas welcomed Victoria Louise Tilsted as head of public affairs Denmark. Tilsted is another former Orsted employee, having served in its public affairs team for almost five years until last December. Benedikt Scheel, managing director and head of policy and regulation for Equinor's German power unit, was appointed as the new chair of the German Wind Energy Offshore Association (BWO). In the US, developer Clearway Energy shook up its top team, with Steven Ryder taking on the role of chief financial officer (a role he will also reprise at parent company Clearway Group). Sarah Rubenstein, who Ryder replaces as CFO at Clearway Energy, is moving into a new role at Clearway Group as head of the transformation office focusing on digital and data transformation and integration activities. Samantha Prout also joined Clearway Energy as senior vice president, accounting and controller. Another US developer, AES US Renewables & Power, a unit of AES Corporation, named Trupti Kalbag as chief commercial officer. She had previously been vice president for origination at AES Clean Energy. German developer RWE meanwhile hired Jenni Rochelle as its director of regulatory affairs and wholesale markets covering the ERCOT market in Texas and the Southwest Power Pool region.

6ix
Sep 8th, 2026
PPL: Rhode Island Energy Joins Multi-State Selection of Northern Maine Onshore Wind Project.

PPL: Rhode Island Energy Joins Multi-State Selection of Northern Maine Onshore Wind Project. Rhode Island Energy Joins Multi-State Selection of Northern Maine Onshore Wind Project Rhode Island Energy (RIE) today announced the conditional selection of 150 megawatts (MW) of renewable energy from the proposed Clearway Energy Group LLC's ("Clearway") project in Aroostook County, Maine, in accordance with Rhode Island's Affordable Clean Energy Security Act. Upon completion, the 800 MW onshore wind development would become the largest onshore wind project in New England. The conditional award follows a competitive, multi-state solicitation led by the Maine Public Utilities Commission that sought proposals for up to 1,200 MW of renewable energy resources, alongside transmission solutions, to strengthen New England's electric grid. RIE participated in the evaluation of generation proposals as part of a coordinated effort involving other New England states. If completed, Clearway's project would significantly expand New England's renewable energy portfolio. At 800 MW, the project would be more than four times larger than the region's largest operating onshore wind facility. "We are committed to helping advance a reliable, safe, affordable, and increasingly clean energy future for our customers, while supporting Rhode Island's 2021 Act on Climate requirements," said Greg Cornett, president of RIE. "The proposed project offers the opportunity to secure a significant amount of renewable energy through a competitive regional procurement while supporting broader efforts to strengthen New England's energy infrastructure and diversify the region's energy supply."

DredgeWire
Sep 4th, 2026
Clearway Energy to develop 800 MW wind farm in Northern Maine.

Clearway Energy to develop 800 MW wind farm in Northern Maine. Posted on September 4, 2026 Maine regulators have picked Clearway Energy to develop an 800-megawatt (MW) wind farm in northern Maine - a project that would boost the state's existing onshore wind capacity by about 66%. The Maine Public Utilities Commission (PUC) also selected Avangrid Networks, the parent company of Central Maine Power, to develop the high-voltage transmission line needed to carry the wind power from the north of the state to the New England grid. Clearway's proposed wind farm would be the largest in Maine, which had 1,214 MW of onshore wind-powered generating capacity as of October 2025. Maine plans to buy about 600 MW of the project's output, with the remaining 200 MW going to other New England states. The Clearway wind farm is planned for commercial timberland in rural, unincorporated southeastern Aroostook County. Clearway told Maine Public that the site has existing roads, access to transmission rights-of-way, and strong, reliable wind. Getting Northern Maine's electricity generated by excellent wind to customers has long been the challenge. Aroostook County isn't directly connected to the regional ISO New England grid, and building enough transmission to move large amounts of power south is expensive. Avangrid's proposed 1,200 MW transmission line would change that. The PUC said the company's proposal makes maximum practical use of existing transmission corridors, and Avangrid has already secured nearly all of the necessary rights of way. The line would terminate at Haynesville, where it would connect to the wider regional grid. The transmission line will have 400 MW of capacity left after the Clearway wind farm connects, and the PUC plans to issue additional requests for proposals to fill that capacity. Maine expects $387 million in ratepayer savings. Maine estimates the wind and transmission projects will deliver between $387 million and $425 million in net benefits to the state's electricity customers over their operating life. Maine ratepayers will pay for the state's share of the wind power, but the cost of the transmission line will be spread across participating states. Massachusetts, Connecticut, Rhode Island, and Vermont are taking part in the procurement, leaving Maine responsible for less than 11% of transmission costs. "This procurement reflects months of careful work to identify projects that will bring reliable, renewable energy to the grid, providing value to Maine and the region, while minimizing costs for Maine ratepayers by sharing costs with other states commensurate with the value provided," said Maine PUC chair Philip Bartlett. The PUC estimates that the projects will create more than 2,500 full-time construction jobs over four years, generate around $150 million in new state and municipal tax revenue, and produce more than $2.4 billion in economic output in Maine. This wind farm isn't ready to build yet. The PUC still has to negotiate and approve a power purchase agreement with Clearway. The transmission arrangement must also be finalized by the participating states and Avangrid, then submitted to the Federal Energy Regulatory Commission for approval. Both projects will also face engineering work, environmental reviews, permitting, and community engagement. Clearway's wind farm can't be built unless the transmission project moves ahead. And Maine has been here before. The legislature first directed the PUC to develop northern Maine wind and transmission in 2021, but the projects selected during the previous procurement fell apart in late 2023 after transmission negotiations failed. This time, five New England states are sharing the costs and benefits, and Avangrid's use of existing corridors could make the transmission line easier to build. But with contracts and permits still outstanding, it will be years before turbines can begin sending northern Maine wind power onto the New England grid. Given that the Trump administration is aggressively working to stop wind power, a few extra years to keep this project on track is probably a good thing.

WBUR
Aug 26th, 2026
Maine selects company to build large wind farm, plus a transmission line, to send power south.

Maine selects company to build large wind farm, plus a transmission line, to send power south. * Peter McGuire, Maine Public August 26, 2026 Maine utility regulators have selected two companies to develop untapped wind power resources in the northern part of the state, part of an eagerly anticipated clean energy project supported by most New England states. The Maine Public Utilities Commission on Tuesday selected Clearway Energy Group LLC to develop onshore wind turbines that can generate 800 megawatts of electricity in Aroostook County near the Canadian border. Commissioners also chose the company Avangrid to develop a new high voltage power line to connect the proposed wind turbines to the New England regional electric grid. With the Trump administration effectively hitting pause on offshore wind development, this land-based wind farm represents one of the only remaining opportunities to develop significant renewable energy resources in the region. The proposed wind farm would be the largest in Maine, which now has about 900 total megawatts of land-based wind generation. Phil Bartlett, who leads the commission, said the project will save Maine electric customers at least $387 million over its lifetime. Support WBUR "These transmission and generation projects will bring substantial economic benefits to the state, creating thousands of full-time jobs during construction and $2.4 billion in economic output," Bartlett said in a statement. The transmission side of the project could also connect Aroostook County directly to the New England power system, a precursor to developing the area's substantial renewable energy resources, said Commissioner Patrick Scully. "In my prior career, I saw up close the challenge of siting new energy projects in northern Maine, caused by the cost of building long transmission facilities to access the New England market, and the significant congestion on existing transmission infrastructure," Scully said. Maine plans to buy 600 megawatts of power from the project, with the remainder being delivered to other New England states, according to spokesperson Susan Faloon. Ratepayers in Massachusetts, Connecticut, Vermont and Rhode Island will share the cost of building the transmission line with Maine. In a statement, Massachusetts Energy and Environmental Affairs Secretary Rebecca Tepper praised the procurement results. "Energy demand is rising, and we need more affordable power for resident and businesses. The selected transmission project will deliver clean, affordable energy throughout New England," she said. "Massachusetts is proud to be a part of this effort to increase energy supply and lower bills." Further details of the proposed deal will be available after the commission finalizes a power purchase contract with Clearway, Faloon said. Nick Benjamin, Clearway's northeastern development director, in an interview said the project is planned for commercial timberland in rural, unincorporated southeast Aroostook County. Support WBUR Major site attributes include existing roads, proximity to electric transmission right of way and reliable wind speeds, Benjamin said. "This project is going to keep energy costs stable for Maine families and business for decades to come, while bringing material economic investment to Northern Maine and meeting the state and region's grid needs," Benjamin added. It will take years to permit and develop the project and building new generation is contingent on a new transmission line, according to the commission. The Maine Legislature directed the Public Utilities Commission to develop wind generation and transmission in northern Maine in 2021. An earlier project fell through in late 2023 after negotiations over the power line failed. Avangrid spokesperson Jon Breed, in a statement said a distinguishing feature of its proposal is its use of existing power corridors and rights of way that will reduce uncertainty and limit potential disruptions to the environment. "While selection is an important milestone, extensive engineering, environmental review, permitting, and community engagement remains ahead," Breed said. This is a production of the New England News Collaborative. It was originally published by Maine Public. WBUR's Miriam Wasser contributed reporting.