R

Regal Rexnord

Automatic transfer switches for backup power

Facharbeiter Montage

Product AssemblyConfirmed live in the last 24 hours
Full-timeWaldenburg, Germany

About the Job

Requirements

  • Completed vocational training in a metal-related occupation, such as industrial mechanic, mechatronics technician, or comparable training.
  • Initial practical experience in mechanical assembly, preferably in fan manufacturing.
  • Confident use of technical drawings and knowledge of relevant quality regulations.
  • Ability to work independently, carefully, and with a focus on quality.
  • Willingness to work shifts.

Responsibilities

  • Assemble industrial fans and air-handling components.
  • Adjust, commission, and functionally test assembled fans.
  • Perform quality checks using technical drawings and measurement plans.
  • Maintain and service existing equipment.
  • Diagnose faults and repair defective components.
  • Document assembly and inspection results in the enterprise resource planning system.
  • Balance rotors and complete fans according to specified balancing plans.

Desired Qualifications

  • Practical experience in mechanical assembly, preferably in fan manufacturing.

About the Company

Regal Rexnord

Automatic transfer switches for backup power

Regal Rexnord’s Thomson Power Systems designs and manufactures critical electrical gear that sits between a building’s main power and its backup source. Its core products are automatic transfer switches (ATS) and switchgear, which monitor for power interruptions and seamlessly switch to a backup generator to keep important facilities—like hospitals and data centers—online. The system works with microprocessor-based controls to monitor power conditions and execute transfers quickly and safely, ensuring minimal downtime during outages. The company differentiates itself through a long, focused history in power-control engineering, a niche specialization in backup power for critical infrastructure, and its integration into the Regal Rexnord portfolio, which provides broader industrial component resources and support. The goal is to give reliable, automatic backup power so essential operations stay powered when the main grid falters.

Company size
51-200
Company stage
Not listed
Total funding
Not listed
Headquarters
City of Langley, Canada
Founded
1973

Recently Posted Jobs

Explore more opportunities at Regal Rexnord

See more jobs