Work Control Planner or Senior Work Control Planner
Savannah River Mission Completion
Work Control Planner or Senior Work Control Planner
Savannah River Mission Completion
Manages legacy liquid radioactive waste cleanup
Savannah River Mission Completion (SRMC) is seeking a Work Control Planner or Senior Work Control Planner to be based in our Aiken, SC location on the Savannah River Site (SRS).
Apply online using a current resume under the careers section of www.savannahrivermissioncompletion.com.
The Work Control Planner or Senior Work Control Planner develops work packages for equipment and/or system modification work to be done by non-union operations staff. Work packages include written step-by-step instructions, procedures, safety and testing requirements within a given area. Planner identifies potential hazards, routes work package for appropriate approvals and review and after all changes are made and work package restraints are resolved, the planner signs off so the work can be scheduled.
Additional responsibilities as a Senior Work Control Planner:
Bachelor’s degree in a non-technical discipline and practical work experience in work control, E&I/mechanical maintenance, plant operations, or related areas; or
Additional notes:
Savannah River Mission Completion (SRMC), a prime contractor for the US Department of Energy, is responsible for managing the Department of Energy’s Savannah River Site’s Liquid Waste operations contract. Located in Aiken, South Carolina, SRMC is a limited liability company formed by nuclear operations and environmental remediation global leaders BWXT, Amentum, and Fluor. The SRMC Team is responsible for the closure of waste tanks, the operation of the Savannah River Site’s Defense Waste Processing Facility, tank farm operations and associated production and disposal facilities. www.savannahrivermissioncompletion.com
Savannah River Mission Completion offers a competitive and comprehensive benefits package with flexibility to meet your needs.
Highlights of our plans include:
Savannah River Mission Completion is committed to equal employment opportunity to employees and qualified applicants regardless of their race, color, religion, gender, national origin, age, physical or mental disability, veteran status, status as a parent, sexual orientation, or genetics. Our equal employment opportunity policies encompass all aspects of the employment relationship, including application and hiring, promotion and transfer, selection for training opportunities, wage and salary administration.
Compensation: 69000 to N/A (USD)
Manages legacy liquid radioactive waste cleanup
SRMC handles the safe management, treatment, and disposition of radioactive liquid waste at the Savannah River Site under the Integrated Mission Completion Contract for the DOE. It brings BWX Technologies, Amentum, and Fluor together to operate all liquid-waste facilities under one umbrella, streamlining cleanup and risk reduction. The process separates high-activity waste for vitrification at the Defense Waste Processing Facility and converts the remaining salt waste into a grout-like material for disposal in Saltstone Disposal Units, aided by the Next Generation Solvent technology. The goal is to close all waste tanks by 2037, using drones and AI to map sites and optimize operations within a cost-focused, performance-based contract.
Explore more opportunities at Savannah River Mission Completion