Simplify Logo
Critical Loop

Critical Loop

Mobile megawatt-scale storage with autonomous control

Master Electrician - Battery Energy Storage Systems, BESS

Full-TimeUpdated on 9/17/2026
$85 - $110/hr

+ Stock options

Senior, Expert
Torrance, CA, USA
In Person

Travel up to 30% to customer sites is required.

No H1B Sponsorship

About the job

Requirements
  • A Master Electrician license or equivalent journeyman-level experience with demonstrated field leadership is required.
  • At least 8 years of industrial, utility, or commercial electrical experience is required.
  • At least 3 years of hands-on experience with utility-scale Battery Energy Storage Systems is required.
  • Experience commissioning and servicing utility-scale energy storage platforms such as Tesla Megapack, Fluence, Sungrow, Powin, Wärtsilä, or BYD is required.
  • Experience working with 480V AC, 1000–1500V DC battery systems, and medium-voltage electrical equipment is required.
  • Hands-on experience with inverter installation and commissioning, including EG4, SMA, Sungrow, or SolarEdge platforms, is required.
  • Strong understanding of battery systems, series and parallel configurations, battery management systems, phase rotation, multi-phase commissioning, arc flash, and DC electrical hazards is required.
  • Experience performing lockout/tagout, live-dead-live verification, and electrical testing using multimeters, insulation resistance testers, and phase rotation meters is required.
  • Ability to read and interpret electrical schematics, one-line diagrams, wiring diagrams, and technical documentation is required.
  • A valid driver's license and ability to travel as needed are required.
Responsibilities
  • Lead electrical installation, commissioning, maintenance, and troubleshooting of utility-scale Battery Energy Storage Systems.
  • Perform factory acceptance testing, including continuity testing, joint impedance measurement, phase rotation verification, multi-phase commissioning, energization, and functional testing.
  • Perform and oversee commissioning activities, including phase rotation verification, multi-phase commissioning, energization and startup, functional testing, and point-to-point verification.
  • Perform high-voltage AC/DC troubleshooting.
  • Safely isolate, de-energize, verify zero energy, and return Battery Energy Storage Systems to service.
  • Install, replace, and troubleshoot power conversion systems/inverters, combiners, transformers, switchgear, breakers, communication systems, and battery racks/modules.
  • Interpret electrical drawings, one-line diagrams, wiring diagrams, and commissioning procedures.
  • Route and install high-ampacity terminations ranging from 2/0 to 500 MCM wire.
  • Support root cause analysis of electrical failures.
  • Work with documented work instructions, quality-assurance hold points, and torque and inspection requirements.
  • Partner with Engineering to resolve field issues and improve product reliability.
  • Mentor and develop junior field technicians and electricians.
  • Maintain compliance with NFPA 70E, OSHA, lockout/tagout, and all site safety requirements.
  • Travel up to 30% to customer sites for commissioning, maintenance, and troubleshooting activities.
Desired Qualifications
  • SCADA, Modbus, or battery management system communications troubleshooting experience.
  • Hands-on experience with cable connections in transformers, panel boards, and inverters.
  • NETA certification.
  • NFPA 70E certification.
  • OSHA 30 certification.
  • Forklift certification.
  • Experience with utility interconnection and substation equipment.
  • SCADA, programmable logic controller, or industrial controls experience.
  • Previous experience in a startup or rapidly growing company environment.

About the company

Critical Loop provides rapidly deployable energy solutions for industrial customers facing grid instability. It combines mobile, megawatt-scale battery storage with a three-part hardware stack—the Controller for autonomous power management, the Combiner as a microgrid backbone, and relocatable air-cooled batteries—managed by autonomous software that uses real-time telemetry to optimize performance and ensure uninterrupted power. The company differentiates itself with an integrated hardware-software platform, fast deployment timelines, autonomous power management, and scalability from microgrids to multi-site deployments, offered under a batteries-as-a-service model. Its goal is to make reliable, scalable power accessible where the existing electrical grid struggles by delivering flexible, fast-to-deploy energy solutions that keep facilities online and cost-efficient.

Company Size

11-50

Company Stage

Series A

Total Funding

$26M

Headquarters

Long Beach, California

Founded

2023

Get referred to Critical Loop

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • April 13, 2026 funding raised $26 million, bringing total capital to $49 million.
  • The company already manages four MWh at San Diego International Airport and 30 MWh mobile capacity.
  • California Public Utilities Commission cited Critical Loop in February 2026 flexible-service tariff rulemaking.

What critics are saying

  • LG Energy Solution Vertech supply dependence exposes schedules to battery shortages and pricing shocks.
  • Critical Loop still looks early-stage; one major project delay would damage credibility with utilities.
  • If utility tariff approvals stall, the interconnection workaround evaporates and the business loses its core value proposition.

What makes Critical Loop unique

  • Critical Loop standardizes microgrids with a proprietary Combiner and Cygnus controller.
  • It deploys relocatable, megawatt-scale batteries in months, not years, for constrained industrial loads.
  • San Diego International Airport and TeraWatt validated its hardware-agnostic, load-flexing approach in 2025-2026.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Hybrid Work Options

Company Equity

Growth & Insights and Company News

Headcount

6 month growth

21%

1 year growth

25%

2 year growth

25%
Business Wire
Apr 15th, 2026
Critical Loop Raises $26M Series A to Accelerate Grid Interconnection

Critical Loop, an industrial power solutions company, today announced a $26 million Series A round led by Conifer Infrastructure Partners and Hanover, with p...

StreetInsider
Apr 13th, 2026
Critical Loop raises $26M Series A to cut grid connection times from years to weeks

Critical Loop, an industrial power solutions company, has raised $26 million in a Series A round led by Conifer Infrastructure Partners and Hanover, bringing total funding to $49 million. Better Ventures Climate Capital, Adapt Nation Capital and Cyrus Ventures also participated. The company addresses grid interconnection delays by combining battery storage, generation and its Cygnus software controller into deployable microgrids, reducing connection times from years to days or weeks. Its CLB-5100 is a scalable 1MW battery system that can connect to various power sources and be relocated to address grid capacity constraints. Critical Loop has secured projects including San Diego International Airport and multiple EV charging sites, and maintains a supply agreement with LG Energy Solution Vertech for US-made batteries. The company currently operates across California.

Latitude Media
Apr 13th, 2026
How Critical Loop uses microgrids to unlock industrial load.

How Critical Loop uses microgrids to unlock industrial load. Led by a former SpaceX engineer, the startup just raised a $26 million Series A for more scalable storage-based microgrids. April 13, 2026 Photo credit: Critical Loop Before starting to work in the energy industry, Balachandar Ramamurthy was putting astronauts into space. As the chief engineer responsible for flight safety at SpaceX, he took on a "multidisciplinary coordination problem" - one not unlike what the energy industry faces today, turning distributed resources into cohesive grid assets. That's why in 2023, he became the co-founder and CEO of Critical Loop, a startup that builds modular microgrids for industrial facilities. "You can see the parallels in how we think about designing and operating these microgrid systems," he told Latitude Media. "If you think about spacecrafts, you launch them, and you can't go repair them easily. In the same way, distributed energy assets need to be maintainable [as easily] as possible to be economical." Armed with this principle, Critical Loop announced today that it has raised a $26 million Series A funding round, including equity and equipment financing, bringing its total capital raised to $49 million. The round was led by Conifer Infrastructure Partners and Hanover Technology Investment Management, with participation from Climate Capital and Better Ventures, among others. The company develops energy storage-based microgrids centered on a proprietary "combiner": a piece of equipment that integrates diverse power sources. This technology enables the microgrid to interface with various battery types, grid connections, and on-site generation sources without requiring custom technical adaptations for each new component. The idea is to make microgrids hardware-agnostic, and as easy to install as plugging them in. "We've built a system that allows us to standardize how you install [microgrids] into industrial facilities, and scale them relatively rapidly, because it's an extensible system where you can add additional batteries," Ramamurthy said. Once that's done, Critical Loop orchestrates the microgrid remotely via software, and coordinates with the utility to flex the facility's load in real time as needed. LATITUDE STUDIOS Elevate your brand with Latitude studios. Work with Latitude's expert team of storytellers, producers, and marketers to create impactful campaigns that generate leads and enhance your brand's thought leadership. Addressing speed-to-power. With this approach Critical Loop aims to solve the speed-to-power challenge that is becoming core to the U.S. energy system, as a surge in artificial intelligence data centers strains an already-congested grid. While it's the data centers stuck in long interconnection queues that get the most attention, the bottleneck can also stall other industrial facilities that face load rejection letters from utilities when trying to expand their operations. For example, Critical Loop partnered with TeraWatt Infrastructure, a fleet-charging hub operator that was denied a request for 10 MW for two sites it needed to expand; the utility said it wouldn't be able to provide the power for five years unless the facility ensured load flexibility. On behalf of the customer, Critical Loop engaged the utility and noted that for the vast majority of the year, the 10 MW would be fully available. Capacity would be limited only during specific windows, and even then, the shortfall was just one to two megawatts. Critical Loop demonstrated that it could bridge that need with its microgrids. TeraWatt was ultimately able to bypass the years-long wait. "There's a lot of interest in building super off-grid, gigantic power plants," Ramamurthy said. "But most of the large loads are going to have some sort of grid tie, and this strategy allows you to have fewer batteries and fewer systems to solve the problem." Critical Loop offers its microgrids through both energy-as-a-service agreements, where it retains ownership of the assets, and long-term service agreements, where the customer purchases the equipment while Critical Loop provides ongoing remote orchestration and operation. The company is targeting the industrial midmarket, which includes sectors like industrial and commercial real estate, where there's a need for energy storage systems ranging from five to 100 megawatt-hours. Despite still being early-stage, Critical Loop already manages four MWh of permanent storage at San Diego International Airport, alongside a movable fleet of approximately 30 MWh used for critical needs such as emergency utility outages. As a technology-agnostic provider, the company utilizes batteries sourced from six different manufacturers; the individual units range from 250 kilowatts to two MW. "We've deployed about 50 MWh worth of microgrids in the last year alone," said Ramamurthy. "This year, we are well on our way to deploying at least 50 MWh, with the goal of reaching 100 MWh." The latest fundraise will support this expansion, as well as research and development activities, and "making sure the production systems and supply chain work," he said. * Bianca Giacobone Bianca Giacobone is a contributing reporter at Latitude Media. She is a freelance business reporter and fact-checker covering the clean energy transition, based in Italy. Related Reading Stay ahead of energy's next frontier. Subscribe for free:

Intelligence360 News
Feb 11th, 2026
Critical Loop files to raise $37M for rapidly-deployable microgrids and predictive software

Critical Loop, a microgrid and energy solutions startup founded in 2023, has filed to raise $37.4 million in new funding, according to documents submitted to the US Securities and Exchange Commission. The company develops rapidly-deployable microgrids combined with predictive software to make power more accessible and efficient. Critical Loop serves manufacturers, transportation hubs, data centres and critical infrastructure, helping customers operate at full capacity whilst reducing energy costs. The filing was made under Regulation D, which allows companies to raise capital without full securities registration. Companies must file within 15 days after the first investor commits to the offering. Critical Loop is led by chief executive officer Balachandar Ramamurthy. The company's mission centres on fixing the electric grid through scalable energy solutions.