Full-Time

Lead EMS Engineer

Systems Engineering

Posted on 9/9/2026

GE Vernova

GE Vernova

1,001-5,000 employees

Global energy provider: power, wind, electrification

No salary listed

Chennai, Tamil Nadu, India

In Person

Travel within India and overseas may be required, including short- and long-term assignments.

Bachelor's

Category
Electrical Engineering (1)
Required Skills
Python
Cybersecurity
C#
PLC

Get referred to GE Vernova

See people who can refer or advise you

Requirements
  • A degree-level qualification in Electrical Engineering from a reputed college or university.
  • At least 10 years of experience with communication protocols, networks, protection relays, and controls in Energy Management Systems or Substation Automation Systems.
  • Experience capturing requirements and writing technical specifications.
  • Understanding of communication protocols, including TCP socket and serial communications; knowledge of DNP3, IEC 61850, and IEC 60870-5-101 protocols.
  • Knowledge of design principles and the ability to write clear documentation.
  • Previous experience in a similar or related role.
  • Knowledge of complex network topologies, switch configuration, and routers.
  • Knowledge of network protocols including RSTP, PRP, MRP, and SNMP.
  • Knowledge of integrating, configuring, simulating, and analyzing substation communication protocols including IEC 61850 MMS and GOOSE, IEC 60870-5-101 and IEC 60870-5-104, DNP3.0, Profinet, OPC UA, OPC DA, and Modbus.
  • Knowledge of time synchronization using NTP and PTP.
  • Knowledge of simulation tools including DTM, IED Scout, Test Suite Pro, and Modsim.
  • Knowledge of network analysis and network storm testing tools.
  • Knowledge of PLC programming using function blocks, Structured Text, and Sequential Function Chart for power management applications.
  • Proficiency preparing single-line diagrams, schematics, network architecture, bills of materials, and reports.
  • Ability to interface effectively with all levels of the organization and external customers.
  • Willingness to travel within the base country and overseas for short- and long-term assignments.
  • Willingness to work extended hours, including weekends and holidays, during critical periods.
Responsibilities
  • Perform basic and detailed engineering for Energy Management System, Substation Automation System, and microgrid-based projects and solutions.
  • Coordinate with customers and vendors as the key technical interface for Energy Management System, Substation Automation System, marine, oil and gas, and power projects.
  • Work with the service organization to align new developments with business strategy and current regulations and standards.
  • Support business verticals in creating and reviewing systems solutions as part of the order-to-revenue process, ensuring technical fitness, risk understanding, and contingency planning.
  • Execute projects by analyzing customer contracts and preparing specifications for vendors and internal stakeholders.
  • Prepare technical documentation according to contractual requirements and review vendor documentation.
  • Identify technical risks and implement mitigation plans.
  • Review developed solutions and identify opportunities to improve processes, systems, or equipment.
  • Ensure compliance with company and customer environmental, health, and safety policies and procedures.
  • Identify and propose improvements to processes, tools, system solutions, and technologies, and roll out agreed improvements.
  • Build relationships with other GE Vernova business entities to maximize synergies.
  • Coordinate with Platform Engineering, Technology and Value Engineering, Supply Chain, other GE Vernova businesses, platform verticals, subcontractors, and suppliers to support projects and business objectives.
  • Apply lean principles to provide optimal technical solutions for projects.
  • Comply with company and customer health and safety regulations.
Desired Qualifications
  • Knowledge of Product Lifecycle Management.
  • Knowledge of Python, Embedded C, or C# programming.
  • Knowledge and experience with Electrical Power Management Systems, Generator Management Systems, load sharing, and load-shedding priorities.
  • Knowledge of cybersecurity.
  • Strong oral and written communication and interpersonal skills.
  • Ability to anticipate customer needs and ensure they are met.
  • Self-motivated and creative approach to solving complex problems.
  • Ability to work with multidisciplinary international teams and maintain effective personal organization.
  • Ability to manage multiple projects within strict timelines.
  • Ability to identify best practices and apply them within the team.
  • Strong prioritization and time-management skills.

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders rose 88% to $24.2 billion, led by Power and Electrification.
  • Backlog hit $176 billion in July 2026, with gas equipment expected to reach 125 GW.
  • August 2026 JV with LS Electric expands GE Vernova in Korea's HVDC market.

What critics are saying

  • Vineyard Wind sued GE Vernova in April 2026; blade failures damaged offshore credibility.
  • Wind execution remains fragile after the 2024 blade break and court-ordered project continuation.
  • If gas-turbine production slips below 20 GW in 2026, backlog monetization stalls.

What makes GE Vernova unique

  • GE Vernova controls Power, Wind, and Electrification across generation and grids worldwide.
  • Its gas turbine backlog reached 116 GW in Q2 2026, supporting long-duration demand.
  • GridOS, HVDC, and gas turbines position GE Vernova for AI-driven electrification buildouts.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Sep 10th, 2026
Big Tech burns $13.5B as AI buildout sends Treasury yields to 4.79%

US Treasury yields near 4.79% reflect strong corporate borrowing for AI investments rather than economic weakness, according to analysts Joel Litman and Rob Spivey. They argue that context matters more than absolute rate levels. Companies borrowing at 5% to fund projects returning 30-40% benefit from current rates, whilst those earning less than borrowing costs face pressure. The analysts note that AI-related corporate debt issuance reached roughly $1.5 trillion this year, driving yields higher. Alphabet posted its first negative free cash flow since 2004, burning $5.9 billion in Q2 as capital expenditure hit $44.9 billion. Amazon swung to negative $7.6 billion on a trailing basis. However, negative cash flow can signal productive investment rather than distress, the analysts suggest.

Yahoo Finance
Sep 4th, 2026
GE Vernova and Quanta Services poised to weather market crash with strong backlogs and AI-driven growth

GE Vernova and Quanta Services are positioned as resilient stocks that could withstand market volatility, according to a new analysis. Both companies are benefiting from surging demand for electrical infrastructure driven by AI and data centre expansion. GE Vernova, spun off from General Electric in 2024, has seen its stock rise more than sixfold since debut. The company's backlog expanded 37% year over year to $176.3 billion at the end of Q2 2026, nearly four times its projected annual revenue of $46.2 billion. Quanta Services, an energy infrastructure builder, reported a backlog of $53.4 billion in Q2 2026, up 49% year over year. The company's revenue is projected to grow 39% in 2026. Analysts expect GE Vernova's revenue and adjusted EBITDA to grow at compound annual growth rates of 17% and 60% respectively from 2025 to 2028.

Fortune
Sep 1st, 2026
GE Vernova hires Rivian CFO Claire McDonough, leaving EV maker without clear successor

GE Vernova has hired Claire McDonough as CFO, effective 1 January, leaving electric vehicle maker Rivian to find her successor. McDonough joined Rivian in January 2021 and helped take the company public through a $13.7 billion IPO that November. She also negotiated Rivian's technology joint venture with Volkswagen, which agreed to invest up to $5.8 billion. Rivian shares fell more than 6% following the announcement, whilst GE Vernova shares declined about 3%. Analysts cited Rivian's lack of a clear succession plan as a factor weighing on its shares. Derek Mulvey, Rivian's VP of finance, is expected to serve as interim CFO after McDonough's departure. McDonough will join GE Vernova in November, succeeding Kenneth Parks, who is retiring.

Yahoo Finance
Aug 31st, 2026
SpaceX builds turbine foundry to break AI power bottleneck, cut GE Vernova wait times by 18 months

Elon Musk's SpaceX is building a foundry in Bastrop, Texas, to manufacture blades and vanes for industrial gas turbines, according to The Information. Musk confirmed the move on X, saying in-house casting could accelerate natural gas turbines coming online by up to 18 months. The initiative targets the same supply chain bottleneck GE Vernova has flagged to investors. GE Vernova CEO Scott Strazik said the company pushed suppliers to add capacity in 2024, sometimes providing capital for new furnaces. GE is mostly sold out through 2030 and aims to increase annual turbine production from 20 gigawatts this year to 30 GW by decade's end. SpaceX has committed over $2.8 billion to gas turbines over three years to support its Colossus data centres near Memphis. The move addresses growing power demand from AI infrastructure expansion.

Yahoo Finance
Aug 29th, 2026
GE Vernova and LS Electric form JV to target South Korea's HVDC market

GE Vernova has formed a joint venture with LS Electric to strengthen its position in the high-voltage direct current sector. Announced at the CIGRE 2026 event in Paris, the partnership will focus on South Korea's voltage source converter-based HVDC projects, which are crucial for transmitting renewable energy from the southwestern region to greater Seoul. The venture combines GE Vernova's VSC-HVDC technology with LS Electric's local capabilities and market presence. The companies also plan to pursue HVDC opportunities in other global markets. The move aligns with GE Vernova's strategy to capitalise on growing power infrastructure demand. During Q2, the company's Power orders jumped 135% year-over-year, whilst Electrification revenue grew 68%. However, the joint venture faces execution risks and may take time to generate meaningful revenue.