F

FluidStack

Builds and runs GPU clusters for AI labs

Controls Engineer - Capacity Delivery

Controls & Automation EngineeringConfirmed live in the last 24 hours
Full-time$164k - $206k /yrIn-person

About the Job

Requirements

  • Experience engineering building or industrial controls on mission-critical projects.
  • Ability to read and write sequences of operations.
  • Experience reviewing integrator work and providing specific feedback.
  • Ability to debug controls issues starting from the points list.
  • Ability to work in non-climate-controlled environments, including active construction areas, data halls, electrical and mechanical rooms, and outdoor spaces, in potentially high or low temperatures and humid, loud, or dusty conditions.
  • Ability to lift, carry, push, and pull up to 40 pounds independently.
  • Ability to sit, stand, walk, kneel, bend, and crouch for long periods, including full shifts on one's feet.
  • Ability to wear required personal protective equipment, such as hard hats, safety glasses, steel-toed boots, gloves, and hearing protection, and follow site safety rules.
  • Ability to climb stairs and ladders and move around equipment, cable trays, and uneven surfaces.

Responsibilities

  • Own controls engineering for assigned sites, including building management system and electrical power monitoring system design review, integration oversight, and commissioning support.
  • Review controls submittals against the standard for architecture, points, sequences, and graphics.
  • Oversee integrator programming quality before it reaches the field.
  • Support Level 3 through 5 commissioning by providing engineering answers within hours.

Desired Qualifications

  • Experience with Niagara or Ignition, electrical power monitoring system platforms, networking for controls, or commissioning.

About the Company

FluidStack

Builds and runs GPU clusters for AI labs

Fluidstack provides large clusters of GPU servers to AI labs training advanced models, and it builds custom data centers for customers that outgrow existing facilities. In 2025, Anthropic chose Fluidstack to build data centers in Texas and New York as part of a $50 billion investment in American AI infrastructure. Labs pay for dedicated clusters of Nvidia GPUs, sometimes tens of thousands of chips, housed in partner data centers around the world. They reach the clusters through a web console or API, while Fluidstack runs the hardware, networking, and day-to-day operations. Fluidstack was founded in London in 2017 and has its headquarters in New York.

Company size
501-1,000
Company stage
Late Stage VC
Total funding
$12.4B
Headquarters
New York City, New York
Founded
2017

Recently Posted Jobs

Explore more opportunities at FluidStack

See more jobs