Full-Time

Non-Destructive Test Inspector

TPI Composites

TPI Composites

1,001-5,000 employees

Manufactures wind blades and automotive composites

No salary listed

Newton, IA, USA

In Person

Category
QA & Testing (1)
Required Skills
Metrology

Get referred to TPI Composites

See people who can refer or advise you

Requirements
  • High school diploma and 0 - 2 years of experience in the field or in a related area, or equivalent combination of education and experience.
Responsibilities
  • Interpret or evaluate test results in accordance with applicable codes, standards, specifications, or procedures.
  • Interpret the results of all methods of non-destructive testing (NDT) such as acoustic emission, electromagnetic, leak, liquid penetrant, magnetic particle, neutron radiographic, radiographic, thermal or infrared, ultrasonic, vibration analysis, and visual testing.
  • Select, calibrate, or operate equipment used in the non-destructive testing (NDT) of products or materials.
  • Examine structures or vehicles such as aircraft, trains, nuclear reactors, bridges, dams, and pipelines using non-destructive testing (NDT) techniques.
  • Make radiographic images to detect flaws in objects while leaving objects intact.
  • Identify defects in solid materials using ultrasonic testing techniques.
  • Prepare reports on non-destructive testing (NDT) results.
  • Conduct liquid penetrant tests to locate surface cracks by coating objects with fluorescent dyes, cleaning excess penetrant, and applying developer.
  • Document non-destructive testing (NDT) methods, processes, or results.
  • Produce images of objects on film using radiographic techniques.
  • Visually examine materials, structures, or components using tools and equipment such as endoscopes, closed circuit television systems, and fiber optics for signs of corrosion, metal fatigue, cracks, or other flaws.
  • Map the presence of imperfections within objects using sonic measurements.
  • Identify defects in concrete or other building materials using thermal or infrared testing.
  • Develop or use new non-destructive testing (NDT) methods such as acoustic emission testing, leak testing, and thermal or infrared testing.
  • Evaluate material properties using radio astronomy, voltage and amperage measurement, or rheometric flow measurement.
  • Perform other duties like crawler inspection and metrology as assigned.
  • Metrology Duties o Sets up and uses Coordinate Measuring Machines (CMM) for the 3D inspection of 3D products and for certification of jigs and fixtures.
  • Converts CMM dimensional reports in customer/TPI accepted form.
  • Assist quality engineers in performing product audits using CMM.
  • Coordinates gage/jigs/fixtures calibrations with quality technicians.
  • Support products in both production and prototype phases.
  • Maintains inventory of standard measurement tools such as rulers, protractors, gauges, calipers, etc.
  • Conducts research on new measurement methods or technologies to improve efficiency and accuracy in measuring processes.
  • Develops, implements, and maintains measurement protocols for specific applications.
  • Performs other duties and special projects as required.

TPI Composites makes and supplies composite materials for wind energy and transportation. It produces independent wind blades with a global network of facilities in the US, Mexico, Turkey, and India, serving major wind turbine OEMs under long-term supply agreements, and also fabricates composite components for transportation, including parts for passenger and commercial electric vehicles. Its manufacturing uses a cost-efficient, scalable process to produce lightweight, durable blades and automotive parts that can meet high-volume production needs. The company differentiates itself by being an independent wind blade producer with a global footprint and long-term contracts, while applying its composite expertise to automotive parts to enable diversified, large-scale production, with a goal of providing reliable, scalable solutions for wind energy and transportation markets to support high-volume demand and diversified revenue streams.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Scottsdale, Arizona

Founded

1968

Get referred to TPI Composites

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Zero debt after July 6, 2026 emergence removes the Chapter 11 overhang.
  • GE Vernova’s five-year supply agreement supports Iowa blade output through 2031.
  • TPI’s expanding field services business monetizes turbine maintenance demand across North America and Europe.

What critics are saying

  • Vestas and GE Vernova are vertically integrating blades, shrinking TPI’s OEM customer base in 2026.
  • Türkiye’s Izmir unit entered liquidation in May 2026, proving international operations remain fragile.
  • If blade manufacturing margins stay weak, ECP can shrink TPI into a services-only shell.

What makes TPI Composites unique

  • July 6, 2026 ECP ownership keeps TPI’s Iowa, Juárez, and field services businesses intact.
  • BladeAssure AI-driven quality software differentiates TPI’s blade manufacturing efficiency on July 6, 2026.
  • TPI’s field services span North America and Europe, serving aging wind fleets.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Remote Work Options

Flexible Work Hours

Growth & Insights and Company News

Headcount

6 month growth

10%

1 year growth

10%

2 year growth

10%
Weather Guard Wind
Jul 20th, 2026
ECP buys TPI blade factories, GE pours billions into LM Wind Power.

ECP buys TPI blade factories, GE pours billions into LM Wind Power. * July 20, 2026 Allen covers Energy Capital Partners buying TPI's blade factories, GE Vernova's $1.7 billion rescue of LM Wind Power, offshore wind cutting oil burn during a heat wave, Scotland's Caledonia approval, and 19 states suing the Pentagon over stalled wind reviews. Good Monday everyone. A few months ago, Weatherguardwind told you about a Houston bankruptcy court carving up TPI Composites. Well, that story just got a whole lot bigger. On July sixth, TPI walked out of Chapter Eleven. Zero debt. New owners. A private equity firm called Energy Capital Partners picked up TPI's blade factories in Iowa and Juarez, Mexico for about twenty million dollars. Twenty million, against more than a billion dollars in liabilities. ECP did not stumble into wind blades. They bought Calpine back in twenty eighteen, inherited seventy-seven power plants, and became GE's biggest private gas turbine customer in the Western Hemisphere. That relationship, forged in gas turbine halls, is what brought them to composite factories. GE Vernova signed a five-year supply deal requiring it to send blade orders to ECP's factories. GE is ECP's partner, its customer, and was even the backup buyer if the deal fell through. So TPI lives on, leaner, debt-free, with locked-in demand from one of the biggest turbine makers on earth. But now, the other side of that coin. While ECP picked up two blade factories for twenty million dollars, GE Vernova recently pumped one-point-seven billion dollars into its own blade company, LM Wind Power. LM's equity had fallen to negative 575 million euros. Revenue dropped ninety-six percent in one year, from 2.1 billion Danish kroner down to just ninety-three million. The Danish workforce, cut to about twenty-five people. LM Wind Power has lost money every single year since GE bought it in twenty seventeen. Nine straight years of red ink. So think about that. Two American blade factories now serve GE Vernova's onshore business. One in Grand Forks, North Dakota, owned by GE, inside a division losing four hundred million dollars a year. The other in Newton, Iowa, owned by ECP, zero debt, five-year supply deal. The independent contract blade business that TPI Composites built is gone. Vestas took the India and Mexico plants in-house. GE's supply is locked to ECP. The OEMs and their financial partners now own the factories directly. And that is a new era for wind manufacturing. Now, let Weatherguardwind talk about what those blades are doing once they are spinning. Earlier this month, a brutal heat wave hit the eastern United States. Air conditioners running full blast. Grid operators scrambling to keep up. And off the coast of New England, two offshore wind farms stepped up. Vineyard Wind, eight hundred and six megawatts off Massachusetts. Revolution Wind, seven hundred and four megawatts near Rhode Island. Together they pushed hundreds of megawatts into the grid right when people needed it most. And here is the number that matters. Oil-fired power plants met about ten percent of peak demand on July second this year. Last summer, at the height of a similar heat wave, oil plants covered nearly fifteen percent. That is more than a gigawatt less oil burned. The projects that survived lawsuits, survived construction shutdowns, survived lease freezes, are now keeping the lights on in New England. Across the Atlantic, Scotland just approved two massive offshore wind farms. The Caledonia North and South projects in the Moray Firth, up to one hundred and forty turbines spread across one hundred and sixty-five square miles. Enough power for two million homes. Ocean Wind is leading the development with a commitment of about 1.7 billion pounds. And here is what makes this project different. Caledonia South will mix fixed-bottom and floating turbines, up to thirty-nine floaters. That blend of proven and next-generation technology on a single project is something to watch. Back in the United States, nineteen state attorneys general are suing the Department of Defense. The reason, wind project reviews. Federal law says any wind turbine taller than two hundred feet must go through a Defense Department check, to make sure it does not interfere with military radar or flight paths. Last August, the Pentagon stopped reviewing those projects. No explanation. No timeline for starting again. Maryland Attorney General Anthony Brown is leading the coalition, joined by attorneys general from eighteen other states including California, New York, and New Jersey. They want a court to force the Defense Department to start doing its job again. And finally, a story from the sea floor. Down in southern New England, lobster populations have been falling for decades. Back in nineteen ninety-eight, there were about fifty million lobsters in those waters. By twenty twenty-two, fewer than ten million. But something else is moving in. Jonah crabs. Fishermen used to throw them back. Now they are hauling them in by the thousands, selling them as a cheaper option to lobster. And researchers at the University of Rhode Island are finding that offshore wind foundations are acting like artificial reefs. Algae grows first, then barnacles and mussels, then fish and crabs follow. The question scientists are working to answer is whether these structures create new marine life, or just pull it in from the surrounding ocean. Either way, the turbines are not just making electricity. They are making habitat. Now, here is what to watch. This Wednesday, July twenty-second, GE Vernova reports second quarter earnings. And the numbers Weatherguardwind just talked about will be in the room. One-point-seven billion dollars pumped into LM Wind Power, a blade company that has lost money nine years straight. Twenty million dollars to let ECP walk away with two factories and a five-year supply deal. GE Vernova is guiding for four hundred million dollars in wind segment losses this year. Meanwhile, its Power and Electrification divisions are printing money, nearly five billion dollars in free cash flow last quarter alone. So the question on that earnings call is simple. If you are spending eighty times more to keep your in-house blade maker alive than a private equity firm paid to buy your contract supplier, how long do you keep doing both? Watch for what GE Vernova says about LM Wind Power's future, about North American onshore blade strategy, and about whether that 1.7 billion dollar injection was a rescue, or a goodbye. The answer could reshape who makes blades in this industry for the next decade. And that is the state of the wind industry for the 19th of July, twenty twenty-six. Join Weatherguardwind for the Uptime Wind Energy Podcast tomorrow.

EnergyMagz
Jul 11th, 2026
TPI Composites exits Chapter 11 with Energy Capital Partners as new owner

TPI Composites has emerged from Chapter 11 bankruptcy under new ownership by Energy Capital Partners. The wind blade manufacturer will continue operating its facilities in Iowa and Juárez, Mexico, alongside its global field services business under the TPI brand. The restructuring leaves TPI with no outstanding debt and an optimised capital structure backed by Energy Capital Partners. The company plans to focus on North American wind energy manufacturing whilst expanding its field services division across North America and Europe. TPI intends to accelerate investment in manufacturing technologies, including its BladeAssure digital quality suite, to improve production efficiency. The field services business provides inspection, preventive maintenance and structural repair services for wind energy assets.

Quiver Quantitative
Aug 14th, 2025
TPI Composites Announces Approval of Chapter 11 First-Day Motions to Preserve Operations and Financial Flexibility

TPI Composites announced the approval of first-day motions in its voluntary Chapter 11 proceedings, ensuring operational stability.

TXF
Aug 13th, 2025
TPI Composites files for Chapter 11 bankruptcy

TPI Composites files for Chapter 11 bankruptcy.

Market Wire News
Aug 12th, 2025
TPIC - TPI Composites Inc. Initiates Voluntary Chapter 11...

Reaches Agreement with Senior Secured Lenders for Use of Cash Collateral and Up to $82.5 Million in Debtor-in-Possession Financing Subject to.