H

Hut 8

Bitcoin mining and enterprise HPC infrastructure

Transmission & Interconnection Principal

Full-TimePosted on 10/2/2026
No salary listed
Senior
Bachelor's
Miami, FL, USA
In PersonIn-office at the corporate headquarters in Miami's Brickell area.

About the job

Requirements
  • A Bachelor of Science in Electrical Engineering from an ABET-accredited program with a power emphasis is required.
  • Five to eight years of experience in power systems, transmission planning, and interconnection as a consultant, ISO/utility engineer, or in an equivalent role is required.
  • Proficiency with power-system modeling and simulation software such as PSS/E, PSLF, PowerWorld, or TARA, or equivalent software, is required.
  • Practical hands-on experience or experience overseeing consultants in validating dynamic models through comparative assessment against PSCAD or EMTP modeling and simulation is required.
  • Strong analytical skills and the ability to interpret complex interconnection study results and develop actionable recommendations are required.
  • Skills in report preparation, data analytics, and cost modeling are required, along with clear written and verbal communication and the ability to translate technical findings for engineering and business audiences.
  • Proficiency with workflow automation and application programming interfaces to scale process development as study volume grows is required.
Responsibilities
  • Prepare materials for utility and grid operator submittals.
  • Track study milestones and support related negotiation processes.
  • Maintain internal records to support study oversight.
  • Ensure model currency across regional grid operator systems.
  • Lead power-flow studies to support load-capacity screening, network-upgrade cost estimation, and system-reliability analysis.
  • Direct system-stability and protection-related studies as needed.
  • Prepare and review clear, decision-ready technical reports and analysis.
  • Translate technical findings for engineering, business, and executive audiences.
  • Drive coordination and alignment across internal teams and stakeholders.
  • Direct external consultants to build and validate power-flow and dynamic models using standard industry software; perform required dynamic-model quality testing as the work is internalized.
  • Own dynamic-model validation and benchmarking through model-quality testing.
  • Drive adoption of workflow automation and modern software tools to scale study throughput as project volume grows.
Desired Qualifications
  • Experience within an ISO/RTO is strongly preferred, followed by consulting-firm or utility experience, with exposure to organized markets such as PJM, ERCOT, MISO, SPP, or the Southeast (Georgia Power, Duke, TVA).
  • Direct exposure to large-load or high-performance-computing/data-center power requirements, including in an academic context, is a strong plus.
  • Demonstrated experience mentoring or leading junior engineers on interconnection studies.
  • Experience presenting study findings and negotiation strategy directly to senior leadership or executive stakeholders.
  • A Professional Engineer license is strongly preferred.

About the company

Hut 8 operates in digital asset mining and high-performance computing infrastructure. It mines Bitcoin at scale with vertically integrated operations, owning mining hardware and managing power and facilities to control costs and profitability. In addition to mining, Hut 8 offers enterprise-grade technology services, including cloud and colocation data centers and high-performance computing infrastructure designed for security, reliability, and scalability. The company’s business model blends mining with enterprise data-center services to reduce cryptocurrency market risk while capitalizing on demand for compute-at-scale and digital infrastructure. Hut 8 differentiates itself by owning and operating its own energy and infrastructure, allowing tighter cost control, and by serving enterprise clients with secure, scalable data-center solutions alongside its mining activities.

Company Size

201-500

Company Stage

IPO

Headquarters

Miami, Florida

Founded

2020

Get referred to Hut 8

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 28, 2026 revolver expands parent liquidity and funds interconnection deposits without cash collateral.
  • Beacon Point and River Bend represent 949 MW contracted AI capacity and $26.6 billion value.
  • Initial Beacon Point energization remains targeted for Q1 2027, preserving near-term commercialization timing.

What critics are saying

  • Texas ERCOT review still threatens Beacon Point energization; Hut 8 lacks formal authorization.
  • Beacon Point’s second phase begins in Q2 2028, leaving execution exposed for eighteen months.
  • If the unnamed hyperscaler defects, Hut 8 loses $19.6 billion of contracted campus value.

What makes Hut 8 unique

  • Hut 8 commercialized Beacon Point with two 15-year leases totaling 704 MW on July 20, 2026.
  • Hut 8 pairs power origination, data-center development, and project financing into one platform.
  • Hut 8 secured $7.5 billion non-recourse project financing and a $1.07 billion revolver in 2026.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

Health Savings Account/Flexible Spending Account

Unlimited Paid Time Off

Flexible Work Hours

Remote Work Options

Paid Vacation

Paid Sick Leave

Paid Holidays

Sabbatical Leave

Hybrid Work Options

Stock Options

Company Equity

401(k) Retirement Plan

Wellness Program

Mental Health Support

Gym Membership

Phone/Internet Stipend

Home Office Stipend

Conference Attendance Budget

Professional Development Budget

Family Planning Benefits

Fertility Treatment Support

Adoption Assistance

Parental Leave

Relocation Assistance

Commuter Benefits

Employee Referral Bonus

Tuition Reimbursement

Professional Certification Support

Mentorship Program

Training Programs

Education allowance

Tuition Reimbursement

Meal Benefits

Pet Insurance

Legal Services

Employee Discounts

Company Social Events

Growth & Insights and Company News

Headcount

6 month growth

↓ -2%

1 year growth

↓ -2%

2 year growth

↑ 0%
Umbrex
Sep 29th, 2026
Hut 8 Strategy and Business Model

Get concise insights into Hut 8's operations, services, leadership team, market strategy, and competitive positioning.

Seeking Alpha
Sep 28th, 2026
Hut 8 closes $1.07B revolving credit facility to strengthen corporate liquidity

Hut 8 has secured a $1.07 billion four-year senior secured revolving credit facility to strengthen its corporate liquidity. The facility offers committed capital with a drawn margin ranging from SOFR plus 150 to 200 basis points, based on the company's consolidated performance.

Yahoo Finance
Sep 24th, 2026
Hut 8 acquires bankrupt Poolin's Texas data centres for $140M

Hut 8 has acquired bankrupt crypto miner Poolin's two Texas data centre facilities for $140 million, according to court filings. The winning bid secures the "Pyote" and "Tarbush" sites, adding to Hut 8's existing Beacon Point campus in Texas. Hut 8's offer was nearly triple the $52 million opening bid, beating out competing offers that reached $137 million. Poolin filed for Chapter 11 bankruptcy protection in July after winding down its Texas crypto mining operations. The acquisition expands Hut 8's data centre portfolio as the former Bitcoin miner pivots to data centre operations. The company now has 949 MW of contracted artificial intelligence infrastructure capacity, representing an estimated $26.6 billion in expected contract value. Hut 8 stock has risen 170% over the past 12 months.

Yahoo Finance
Sep 1st, 2026
Hut 8 stock jumps 5% as Nvidia backs $35B Anthropic-Lambda cloud deal

Hut 8 Corp. shares jumped nearly 5% in overnight trading Monday after reports emerged that the company will develop a data center as part of a $35 billion cloud-computing deal between Anthropic and Nvidia Corp. According to The Wall Street Journal, Hut 8 will develop the data center in Nueces County, Texas. The company signed an agreement with Nvidia weeks ago to secure capacity. Lambda will use Hut's data center to plug in chips bought from Nvidia, whilst Nvidia will hold the lease. The deal adds to Hut 8's growing portfolio. The company is already developing data centers for Anthropic to use Google's tensor processing units, backed by financial guarantees from Google. In July, Hut 8 announced 15-year leases for its entire 700-megawatt Texas campus to an unnamed company.

Yahoo Finance
Aug 26th, 2026
Hut 8 CFO sells $508K in shares after 240% one-year return

Sean Joseph Glennan, Chief Financial Officer of Hut 8 Corp., sold 6,445 shares at $78.76 per share on 24 August 2026, according to an SEC filing. The sale was worth approximately $508,000. The transaction was executed automatically under a Rule 10b5-1 trading plan to cover tax liabilities from vesting restricted stock units, not a discretionary sale. Despite the sale, Glennan's direct holdings increased from 12,068 to 17,978 shares following the vesting event. The sale occurred as Hut 8's stock achieved a 240% return over the prior year. Shares closed at $79.56 on the transaction date, giving the company a market capitalisation of $9.0 billion. Hut 8 operates as an energy infrastructure platform serving energy-intensive computing operations, including cryptocurrency mining and data centres.