Full-Time
Posted on 9/10/2026
Climate-aligned HPC powered by wasted energy
$100k - $115k/yr
Denver, CO, USA
In Person
Extended site assignments and weekly travel to remote project sites are required; resident assignment may be required during peak construction and commissioning.
Bachelor's
See people who can refer or advise you
Crusoe Energy Systems uses wasted, stranded, or clean energy sources to power high-performance computing and AI workloads. It turns otherwise unused energy into scalable computing resources and offers technical support to enterprises in AI and data-intensive fields. Unlike traditional data centers, Crusoe colocates infrastructure at energy sources to capture excess energy and convert it into computer power, reducing emissions. Its goal is to help the energy transition by providing climate-aligned, reliable computing while boosting resource efficiency.
Company Size
1,001-5,000
Company Stage
Series F
Total Funding
$18.7B
Headquarters
Denver, Colorado
Founded
2018
See people who can refer or advise you
Help us improve and share your feedback! Did you find this helpful?
Industry competitive pay
Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents
Paid life insurance, short-term and long-term disability
Parental leave
Stock options in a fast-growing, well-funded technology company
Pet-friendly offices
Teladoc
401(k) with a 4% match
Unlimited time off
Cell phone reimbursement
Tuition reimbursement
Company paid commuter benefit; $100 per month
Calm
Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.
Crusoe has opened its second manufacturing facility in Tulsa, Oklahoma, adding 400,000 square feet to its operations and bringing its national manufacturing footprint to roughly 1 million square feet. The AI infrastructure company has hired more than 300 local workers across its two Tulsa sites, up from the 100 initially expected when the first facility opened in 2024. The facilities produce electrical equipment for AI infrastructure, including medium-voltage switchgear, low-voltage switchboards, electrical enclosures, industrial controls, and custom-fabricated copper busbar. The company has supplied more than 2,500 switchboards to its Stargate Project site in Abilene, Texas. Crusoe now employs more than 1,800 people, with 15,000 skilled workers across its sites. The company manufactures components in-house to reduce production time and maintain quality control.
Crusoe, a cloud-computing provider and data center developer doing business with OpenAI, Microsoft Corp. and Meta Platforms Inc., has raised over $3 billion in a funding round that values the startup at roughly $30 billion, according to people familiar with the situation.
Crusoe has registered two additional data-centre buildings at its Goodnight campus near Claude, Texas, with estimated construction costs totalling $1 billion, according to state filings. The buildings would add approximately 1.61 million square feet to the Armstrong County development, also known as Project Llano. Each single-storey structure is planned at roughly 805,380 square feet, with multiple data halls, office space and support areas. Public reporting has linked Google to the campus development through intermediary Ensign Infrastructure. Building 3 is scheduled for completion on 1 August, whilst Building 4 has a March 2027 completion date. Power plans include grid-supplied electricity and potential on-site generation, with a natural-gas plant proposal for up to 933 MW capacity. Separately, Crusoe announced a partnership with Aalo Atomics to examine modular nuclear generation for future data centres.
Crusoe and ON.energy have announced a partnership to deploy 5 gigawatts of AI UPS™ technology across multiple hyperscale campuses, with commissioning starting in 2026 and continuing into 2027. AI data centres create unprecedented grid challenges. During training, thousands of GPUs ramp up and down in synchronised bursts, causing power demand fluctuations hundreds to thousands of times daily. These load swings can propagate through interconnection points into transmission systems. ON.energy's patented AI UPS™ is a medium-voltage uninterruptible power system that sits between power sources and data centres. It decouples facilities from the grid, protecting equipment during voltage faults whilst preventing GPU load swings from affecting the grid. The technology has been validated against ERCOT's Large Load Interconnection requirements, meeting grid stability and voltage ride-through standards.