Full-Time

Assistant Superintendent

Updated on 8/1/2026

Deadline 10/13/26
ACCIONA

ACCIONA

10,001+ employees

Global renewable energy and infrastructure company

Compensation Overview

CA$100k - CA$125k/yr

+ RRSP matching + Performance-based discretionary bonus + Share purchase program

Ontario, Canada

In Person

Category
Operations & Logistics (1)
Required Skills
AutoCAD
Plumbing

Get referred to ACCIONA

See people who can refer or advise you

Requirements
  • Relevant construction management or supervision experience may substitute for formal education.
  • Must possess a valid Ontario Driver’s License G or G2.
  • Must have 3-5 years of experience in construction management or supervision in transit stations.
  • Experience reading and understanding civil, architectural, structural, mechanical, electrical, and plumbing drawings.
  • Knowledge of station construction practices, materials, and relevant local regulations and standards.
  • Proficiency in project management software, along with an understanding of AutoCAD and other design tools.
  • Must be committed to safety and quality, with attention to detail and problem-solving skills.
  • Must have strong organizational skills and the ability to manage time effectively.
Responsibilities
  • Assist in managing and supervising on-site construction activities, including civil, foundations, structural steel and concrete, architectural, mechanical, electrical, and plumbing works.
  • Coordinate daily operations and communicate with the superintendent, contractors, and subcontractors to ensure workflow and compliance with project schedules.
  • Conduct regular inspections and assessments of work in progress to ensure adherence to project specifications, industry standards, and safety regulations.
  • Ensure that all work complies with local authority project standards, requirements, and applicable regulations.
  • Assist in supervising foremen and crews, including labor and equipment, and track daily production.
  • Assist in confirming manpower and equipment resources required for performance and propose alternatives to increase efficiency.
  • Coordinate job requirements for company resources to ensure optimum use.
  • Help oversee and coordinate subcontractor work to ensure it is performed on schedule and in accordance with the subcontract.
  • Maintain positive jobsite relations with the owner, subcontractors, and prime contractor.
  • Maintain accurate records of project activities, including daily reports, inspection reports, and safety documentation.
  • Coordinate with the Superintendent on production review, activity planning, progress, and compliance with contract documents.
  • Take the steps necessary to complete the contract in accordance with its provisions.
  • Ensure work is performed according to the project's safety, quality, and environmental guidelines.
  • Conduct daily safety checks to ensure protocols are monitored and risks are mitigated.
  • Work in a fast-paced environment under different weather and environmental conditions.
  • Work extended hours, including weekends and holidays, when needed to meet project deadlines.
Desired Qualifications
  • A Bachelor's Degree in Civil Engineering, Construction Management, or a related field is preferred.
  • Experience with Toronto Transit Commission and Metrolinx specifications and standards for transit stations is an asset.
  • Go Corridor experience is an asset.

Acciona builds and operates infrastructure and develops renewable energy assets worldwide. It covers the full project life cycle, from engineering, procurement, and construction to owning, operating, and maintaining power plants and related infrastructure. It differentiates itself through vertical integration and a long history of shifting from general construction to a pure-play renewable and sustainable infrastructure group with a large, globally diversified portfolio. Its goal is to be a leading global developer and operator of sustainable infrastructure, expanding clean-energy capacity and reducing carbon emissions.

Company Size

10,001+

Company Stage

IPO

Headquarters

Madrid, Spain

Founded

1861

Get referred to ACCIONA

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Vertical Earth adds US self-execution capacity and local contractor scale.
  • Atlanta becomes a stronger hub for Acciona's North American infrastructure expansion.
  • Green private placements support capital-intensive renewable and resilient infrastructure growth.

What critics are saying

  • Vertical Earth integration delays could weaken pricing and execution on US projects.
  • Renewable power-price volatility compresses Acciona Energía cash flow and valuation.
  • Permitting, labor, and political disputes slow revenue recognition across Acciona's global projects.

What makes ACCIONA unique

  • Founded in 1997, Acciona unites construction heritage with renewables and water.
  • Acciona Energía's 2021 IPO funded global expansion while preserving group control.
  • Management leads across infrastructure, energy, and water with integrated project delivery.

Help us improve and share your feedback! Did you find this helpful?

Benefits

401(k) Retirement Plan

401(k) Company Match

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

Tuition Reimbursement

Paid Time Off

Health Savings Account/Flexible Spending Account

Paid Holidays

Flexible Work Hours

Hybrid Work Options

Paid Vacation

Primary Care

Family Planning Benefits

Fertility Treatment Support

Parental Leave

Wellness Program

Phone/Internet Stipend

Home Office Stipend

Career development opportunities

Tuition Reimbursement

Professional Development Budget

Conference Attendance Budget

Growth & Insights and Company News

Headcount

6 month growth

28%

1 year growth

28%

2 year growth

28%
Unidad Editorial
Nov 21st, 2025
Acciona injects €40M into Silence

Acciona has injected €40 million into its electric motorcycle subsidiary, Silence, to support growth and strengthen its financial structure. This follows a previous €62 million investment earlier in the year. Silence faced production halts due to low demand and high inventory levels, leading to a temporary employment regulation in 2024. The company's revenue was €18 million in 2024, down from €45.6 million in 2023. The capital now totals €102 million.

Construction Briefing
Oct 8th, 2025
Acciona secures €120m EIB loan to advance R&D

Loan to support digitalisation strategy and sustainability efforts

Global Competition Review
Jul 17th, 2025
Acciona's Waste-to-Energy Merger Scrutiny

The Australian Competition and Consumer Commission (ACCC) is investigating Acciona's proposed acquisition of a competing waste-to-energy facility. This probe is prompting broader discussions on how Australia's merger regulations address issues such as creditor influence, infrastructure contracts, and the demand driven by sustainability.

ACCIONA
Jul 3rd, 2025
ACCIONA closes the largest german "Schuldschein" green loan for the iberian peninsula

This transaction is the largest issuance of its kind by an Iberian company and the third largest one for southern Europe.

EVMagz
May 7th, 2025
Acciona Energia Acquires Shell’s Cable Energía to Expand EV Charging Network in Iberia

Spanish energy company Acciona Energia said it has acquired Cable Energía, the operator of the Shell Recharge electric vehicle charging network in Spain