G

GE Vernova

Builds equipment and software for electric power

Engineering Technical Lead - I&C Embedded Software

Full-TimeUpdated on 10/23/2026Deadline 10/30/26
$113.2k - $188.8k+ Discretionary annual bonus
Expert
Bachelor of Science (BS)
Remote in USA+1 moreMore locations: Wilmington, NC, USA
RemoteRemote role; onsite attendance for testing operations about once a month. U.S.-based remote candidates considered.
Engineering ManagementEngineering Leadership

About the job

Requirements
  • A Bachelor of Science in Electrical Engineering, Computer Science, or an equivalent four-year technical degree from an accredited college or university is required.
  • A minimum of 10 years of experience in embedded software development is required, including deep working knowledge of the C programming language and software development tools such as GitLab version control, integrated development environments, and debuggers.
  • A minimum of 10 years of experience with C coding conventions, unit testing, and integration testing of software is required.
  • A minimum of 5 years of experience performing independent or preferably team-based system design or technical reviews, including interfacing with requirements management and independent verification and validation, is required.
  • The candidate must be able to travel onsite as needed for testing operations, about once a month.
  • The candidate must be legally authorized to work in the United States.
  • The candidate must be able to obtain authorization from the U.S. Government to access U.S. export-controlled information, if applicable.
Responsibilities
  • Lead preparation of high- through low-level work planning, scheduling, and resource loading across engineering, procurement, and construction lifecycle phases or new product introduction, using applicable practices, guides, and tools.
  • Support project engineering or project management in understanding execution metrics and status, issues, risks, and mitigation or recovery plans, and proactively identify scope changes.
  • Drive compliance with scope, detailed work planning, budget, overall schedule, applicable design processes, and discipline-specific practices and tools, including design and technical reviews.
  • Lead day-to-day operations and follow up to ensure deliverables meet commitments and are delivered to specification, budget, and schedule.
  • Coordinate proactively and inclusively across engineering disciplines to support integrated plant design objectives.
  • Collaborate with project management, project engineering, support functions, and others to drive project completion.
  • Identify, confirm, document, and lead resolution of technical, risk, and other emergent issues.
  • Provide technical oversight and mentorship to ensure system designs and deliverables comply with requirements through design release to manufacturing or suppliers, including production, validation, installation, and commissioning tests.
  • Support strategy, planning, statements of work, and implementation of resource loading.
  • Assist with hosting learning sessions and knowledge-capture and transfer initiatives.
  • Use tools for requirements, design, change, configuration, and document management.
  • Champion nuclear safety culture and ensure compliance with company policies, the quality management system, and the corrective action program.
  • Deliver work with integrity, safety, security, and quality, and on time.
Desired Qualifications
  • Experience in nuclear analog and digital instrumentation, control, monitoring, electric power systems, and field engineering.
  • Competency in IEEE and IEC industry standards and quality standards.
  • Ten years of experience in the commercial nuclear industry working with plant instrumentation application software and control and monitoring software system design, including implementation, testing, installation, and commissioning.
  • Ten years of application, field installation, and testing experience with systems and equipment.
  • Competency in modeling and test data collection tools.
  • Ability to solve technical challenges using common design patterns and identify appropriate patterns for problem solving.
  • A proven track record of delivering commitments to specification, on budget, and on schedule.
  • Strong verbal communication, facilitation, and presentation skills for technical and business audiences, including the ability to communicate openly, calmly, and clearly in stressful situations.
  • Ability to quickly learn diverse organizational interfaces and operate with professional astuteness.
  • A continuous improvement mindset and ability to identify, influence, and implement better ways to perform activities or processes.
  • Solid technical writing skills focused on requirements and design documents.
  • Effective use of data structures and algorithms.
  • Experience understanding C coding standards and delivering desired functionality using the technology selected for a project; familiarity with MISRA-C is desirable.
  • Experience in product, instrument, and system design, verification, validation, and qualification.
  • Experience in design verification and validation.
  • Ability to articulate clearly in written and verbal communications.
  • Ability to contribute creative solutions and challenge the status quo.
  • Proactively learn new tools, identify opportunities for improvement, and promote their adoption.

About the company

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company Size

10,001+

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2024

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Demand supports expansion: July 2026 results show GE Vernova booked $24.2 billion of quarterly orders, up 88% organically.
  • Service commitments support recurring work: GE Vernova says services account for more than 55% of its backlog.
  • Graduates build depth through rotations: GE Vernova runs two-year Next Gen development programs in engineering, technology, and operations.

What critics are saying

  • Wind remains a drag: July 2026 results show GE Vernova lost $275 million in quarterly Wind segment EBITDA.
  • Project margins absorb overruns: GE Vernova locks prices before completion and discloses meaningful expenses from excess costs and penalties.
  • Field assignments demand long weeks: GE Vernova's listed transformer specialist works typical 12-hour site days, up to six weekly.

What makes GE Vernova unique

  • Its technology underpins global power: GE Vernova says customers generate approximately one-quarter of world electricity using its equipment.
  • Gas turbine scale anchors expertise: GE Vernova reports the largest installed fleet by generating capacity, across approximately 7,000 turbines.
  • Nuclear work reaches beyond equipment: GE Vernova Hitachi supplies advanced reactors, fuel, and services for operating plants.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Paid Vacation
  • Paid Parental Leave
  • Mental Health Support
  • Relocation Assistance
  • Performance Bonus

Company News

Yahoo Finance
Oct 22nd, 2026
GE Vernova Q3 preview: $176B backlog and 145% expected EPS growth ahead of October 28 report

GE Vernova will report third-quarter 2026 results on October 28. Analysts expect earnings of $4.03 per share, up more than 145% from a year earlier. In the second quarter, equipment orders more than doubled and service orders rose 15%. Total backlog climbed to $176 billion. For the third quarter, the company expects Power segment revenue growth of 17%–19% and an EBITDA margin of about 17%–18%, up from 13.3% a year earlier. Electrification revenue is forecast at $3.8 billion–$4.0 billion. The stock is about 26% below its 52-week high, which has eased valuation concerns. Most analysts rate it a "Strong Buy.

Yahoo Finance
Oct 22nd, 2026
GE Vernova up 600% since spin-off, with a $176B backlog: is the dip a buying chance?

GE Vernova's shares have risen nearly 600% since the company was spun off from GE Aerospace in 2024, driven by demand for electricity from artificial intelligence data centres. The stock has been in a lull since April. In the second quarter, its power division's revenue grew 14% to $5.5 billion, while new orders rose 134% to $16.7 billion, mostly for natural gas turbines. Its electrification arm's revenue climbed 68% to $3.6 billion, with orders up 93% to more than $6.3 billion. Total backlog stands at $176 billion, more than three times next year's expected revenue of $53 billion. Manufacturing capacity is the main bottleneck. About 80% of customers are traditional, and 20% are data centres. Most analysts rate the stock a strong buy, with a consensus price target of $1,199.47.

Yahoo Finance
Oct 22nd, 2026
GE Vernova stock down 10.1% as gas turbine prices and $12.5B cash guide face six-month test

GE Vernova stock has fallen 10.1% since April 21, 2026, while the S&P 500 gained 9.8%. Investors appear to be betting that customers will keep paying rising prices for its gas turbines, with cash up front. Management expects at least 125 gigawatts of equipment under contract by the end of 2026. The company's third-quarter results, due around October 28, will show whether turbine prices keep climbing. In July, management said first-half equipment orders were priced more than 20% above fourth-quarter 2025 orders. Full-year free cash flow is due around January 26, 2027. Management raised its 2026 guide to $11.5 billion to $12.5 billion, from $6.5 billion to $7.5 billion. Wind revenue is expected to fall at a low double-digit rate in the third quarter.

Yahoo Finance
Oct 21st, 2026
GE Vernova shares rise 3.5% to $921 as Nvidia tie-up links grid planning to AI; backlog hits $176B

GE Vernova is working with Nvidia on infrastructure and digital-twin tools that link grid planning to the needs of AI factories. The company's shares rose 3.46% to $921.12 at 11:04 EDT on Wednesday. AI facilities need electricity, and GE Vernova supplies equipment that helps deliver it. The collaboration adds a digital planning layer to that opportunity. Through the second quarter, the company reported more than $5 billion in data-center orders, over twice its full-year 2025 total. Quarterly orders hit $24.2 billion, and backlog reached $176 billion, up $13 billion from the previous quarter. Revenue rose 22% to $11.1 billion. Adjusted EBITDA margin reached 11.3%. The next test is execution: turning backlog into revenue and reaching a projected 2026 adjusted EBITDA margin of 12% to 14%.

Yahoo Finance
Oct 16th, 2026
GE Vernova wins five Venture Global grid reservations; $3,400 model target implies 267% upside

GE Vernova has reserved five grid equipment packages for Venture Global, under an agreement signed October 9. GE Grid Solutions will supply transformers and gas-insulated switchgear for up to 21 power island projects, with purchase orders starting in late 2026. Venture Global also reserved eight power islands with GE Vernova, and expects to order its first by the end of 2026. Beyond reservation fees, neither deal binds the buyer; the roughly $17.2 billion total assumes every order proceeds. GE Vernova shares closed at $926.44 on October 15, 21.14% below their June record but up about 42% in 2026. The company's Electrification backlog has grown to $45 billion from $6 billion at the end of 2021. Third-quarter results are due October 28.