M

MasTec

Infrastructure engineering and construction for energy

Project Scheduler 2 - Renewables EPC

Full-TimeDeadline 8/21/27
$76k - $110k/yr+ Annual bonus + 401(k) match
Mid
Bachelor's
Indianapolis, IN, USA+4 moreMore locations: Dallas, TX, USA | Fargo, ND, USA | Phoenix, AZ, USA | Denver, CO, USA
In PersonOffice-based role with 10–20% travel.
Project & Program ManagementProject Management

About the job

Requirements
  • A bachelor's degree in Construction Management, Engineering, or a related field, or an equivalent combination of education and experience.
  • Two to four years of related experience in planning and scheduling on engineering and/or construction projects.
  • Knowledge or experience using earned value software applications and methodology.
  • Proficiency in Microsoft Office, Excel, and Primavera.
  • Ability to read, analyze, and interpret blueprints, technical procedures, contracts, or governmental regulations.
  • Ability to write reports and business correspondence and document project activities.
  • Ability to present information and respond to questions from project managers, superintendents, clients, customers, and other project personnel.
  • Knowledge of planning, scheduling, and reporting techniques.
  • Ability to work effectively and independently, follow through on assignments, and work well with others.
  • Accuracy, reliability, and completeness in job accomplishment.
  • Effective oral and written communication skills.
  • Ability to interpret instructions provided in written, oral, diagram, or schedule form.
  • Ability to compute rates, ratios, and percentages.
  • Ability to evaluate information using measurable or checkable standards, work within precise limits or standards of accuracy, interpret flat drawings and blueprints in three dimensions, and identify subtle differences in shapes or shading.
  • Take reasonable care of personal and others' health and safety, including personal responsibility for working toward Wanzek's Zero Injury principles.
Responsibilities
  • Develop and monitor the schedule and earned value baseline.
  • Prepare Work Breakdown Structures and develop schedules and budgets, including resource loading, for those elements.
  • Obtain and collect schedule updates from construction management personnel and contractors.
  • Maintain the project construction schedule baseline and updates.
  • Assemble and compile schedules and inputs, and provide detailed computer-generated schedule reports, charts, and diagrams as requested.
  • Analyze schedule progress and performance and identify developing problem areas.
  • Maintain master schedule logic; assess the impact of construction task delays, critical path changes, accelerations, cancellations, and additions on the overall Project Master schedule and individual Project areas; and determine corrective action.
  • Provide data processing support for network schedule calculations, reports, and related services.
  • Perform planning, scheduling, and reporting duties with particular construction contractors and/or areas.
  • Participate in developing and maintaining periodic daily, weekly, and monthly status reports that inform management and/or the owner about project progress, including labor, equipment, operations productivity, and schedule status.
  • Participate in the continuing development and maintenance of project computer systems and Primavera-based databases.
  • Receive work assignments and specific instructions from the Senior Scheduler, Project Controls Manager, Estimating Manager, and Project Manager, and may act as the responsible planning and scheduling representative on project tasks with accountability for schedule and reporting requirements.
  • Obtain input from the project team and contractors and prepare the schedule portion of the Monthly Report.

About the company

MasTec provides engineering, construction, installation, maintenance, and upgrade services for energy, utility, and communications infrastructure across North America. It builds and maintains power plants, renewable energy facilities, and related networks, and helps clients with site selection, sizing, materials, and construction strategy. The company employs about 22,000 professionals and a large fleet of specialized equipment to execute projects end-to-end. Its focus on utilities, communications, and government sectors, plus work in natural gas and renewable energy facilities, sets it apart; its goal is to deliver reliable, safe, and efficient infrastructure that supports energy delivery and connectivity.

Company Size

5,001-10,000

Company Stage

IPO

Headquarters

Coral Gables, Florida

Founded

1929

Get referred to MasTec

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 revenue rose 23% to $4.37 billion, beating expectations.
  • MasTec raised 2026 guidance to $18.2 billion revenue and $1.6 billion EBITDA.
  • Superior brought about $1.4 billion backlog and expanded data-center demand exposure immediately.

What critics are saying

  • Communications revenue guidance fell to $3.25 billion after wireless timing issues and delays.
  • NLRB case 01-CA-382214 filed March 2, 2026 alleges discriminatory discharge in Maine.
  • Superior adds leverage and integration risk; pro forma net leverage reached 2.2x after closing.

What makes MasTec unique

  • July 2026 Superior acquisition gave MasTec inside-the-fence data center electrical capability.
  • MasTec’s June 2026 backlog hit $21.4 billion, a record across power, pipeline, clean energy.
  • MasTec spans communications, power delivery, pipeline infrastructure, and clean energy nationwide.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Disability Insurance
  • Life Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Employee Stock Purchase Plan
  • Health Savings Account/Flexible Spending Account
  • Paid Vacation
  • Paid Holidays
  • Bereavement Leave

Growth & Insights and Company News

Headcount

6 month growth

19%

1 year growth

19%

2 year growth

19%
Business Insider
Oct 18th, 2026
MasTec (MTZ) Receives a Buy from Barclays.

MasTec (MTZ) Receives a Buy from Barclays. Oct. 18, 2026, 09:15 PM In a report released on October 16, Adam Seiden from Barclays maintained a Buy rating on MasTec, with a price target of $320.00. The company's shares closed last Friday at $191.02. Seiden covers the Industrials sector, focusing on stocks such as MasTec, Agco, and Caterpillar. According to TipRanks, Seiden has an average return of 8.3% and a 54.56% success rate on recommended stocks. Currently, the analyst consensus on MasTec is a Strong Buy with an average price target of $398.82, representing a 108.78% upside. In a report released on October 15, KeyBanc also maintained a Buy rating on the stock with a $320.00 price target. Based on MasTec's latest earnings release for the quarter ending June 30, the company reported a quarterly revenue of $4.37 billion and a net profit of $130.12 million. In comparison, last year the company earned a revenue of $3.54 billion and had a net profit of $85.77 million Read More on MTZ:

Insider Monkey
Oct 10th, 2026
Jim Cramer weighs MasTec's (MTZ) business against the selling pressure.

Jim Cramer weighs MasTec's (MTZ) business against the selling pressure. Published October 10, 2026 at 11:26 am EDT Toward the end of the October 6 lightning round of Mad Money, a caller asked about MasTec, Inc. (NYSE:MTZ). Jim Cramer acknowledged its operating performance but remained reluctant to buy, as he said: This thing has been crushed. I mean, it's been crushed. And you know what? It's doing pretty well. It's not even that expensive... It helps wind farms and solar farms. And boy, those are farms that nobody wants. And what can I say? I'm not going to get in front of that kind of selling. MasTec, Inc. (NYSE) ranks #8 on our list of 10 Best Construction Stocks for Data Center Infrastructure. See which seven stocks rank higher? Data centers broaden the construction opportunity. MasTec, Inc. has exposure beyond wind and solar construction. Its July acquisition of The Superior Group added electrical contracting capabilities for data centers and other critical facilities, extending its services from supporting infrastructure outside a facility to electrical work inside it. Cramer's reluctance contrasts with an earlier analyst response to weakness in the shares. MasTec's entry in a roundup of long-term data-center stocks highlighted Baird's case for treating a pullback as an opportunity. Second-quarter revenue increased 23% to approximately $4.4 billion, while adjusted earnings per share rose 49% to $2.22. Its estimated 18-month backlog reached approximately $21.4 billion, including $7.8 billion in Clean Energy and Infrastructure and $6.35 billion in Power Delivery. Management raised full-year adjusted earnings guidance to $9.30 per share. MasTec's expansion also places it among the fastest-growing grid construction companies, although two contractors ranked ahead of it on trailing revenue growth. That broader comparison provides context for how quickly its business is growing. Its valuation also gives context to Cramer's acknowledgment that the stock is not particularly expensive. As data shows, MasTec at approximately 20.2x forward earnings, compared with 22.5x for EMCOR and 38.1x for Quanta Services. These contractors have different project mixes, but MasTec traded below both on the same valuation measure. Project growth has yet to translate fully into cash. MasTec, Inc.'s first-half free cash flow was negative $47.6 million, compared with negative $0.4 million a year earlier. Net debt increased to approximately $2.42 billion at June 30 from $1.93 billion at year-end. These figures preceded the July closing of the Superior acquisition. Backlog also requires careful interpretation. MasTec's estimate includes anticipated work under service agreements, change orders and renewal options. It is not entirely composed of firm, unconditional orders. The cash-flow weakness sharpens the question behind an earlier Quanta-MasTec comparison: how much extra should investors pay for stronger cash conversion? That analysis weighed Quanta's advantage against the room for improvement in MasTec's collections. The company identifies permitting delays, changes in renewable-energy support, customer financing costs and inaccurate project-cost estimates as risks. Those factors can affect when projects begin and how much profit they ultimately produce, even when demand for infrastructure remains strong. Ownership changes little as short interest remains notable. According to Insider Monkey, there were 82 hedge funds that held MasTec, Inc. in Q2, compared with 83 in Q1. Short interest stood at 8.54% of the float, indicating a meaningful level of bearish positioning. Cramer recognized that MasTec was performing well but did not want to buy into the selling. Its growing backlog and lower peer valuation give investors reasons to keep watching. Better cash conversion would strengthen the case, especially as the company brings its new data-center construction business into the group. While we acknowledge the risk and potential of MTZ as an investment, our conviction lies in the belief that some AI stocks hold greater promise for delivering higher returns and doing so within a shorter time frame. If you are looking for an AI stock that is more promising than MTZ that has 10,000% upside potential, check out our report about this cheapest AI stock.

Associated Press
Sep 10th, 2026
MasTec appoints Ati Modak as VP of investor relations from Goldman Sachs

MasTec has appointed Ati Modak as vice president of investor relations, effective September 2026. Modak joins the infrastructure engineering and construction company from Goldman Sachs, where he served as vice president in equity research covering energy services companies. He previously worked at Citi before joining Goldman Sachs in 2019. Chief executive José Mas said Modak brings deep knowledge of the infrastructure services sector and understanding of market trends. Chief financial officer Paul DiMarco highlighted Modak's industry expertise and experience engaging with investors. MasTec operates across four segments: communications, power delivery, pipeline infrastructure, and clean energy and infrastructure.

Yahoo Finance
Sep 10th, 2026
MasTec Announces the Appointment of Ati Modak as Vice President of Investor Relations

MasTec Announces the Appointment of Ati Modak as Vice President of Investor Relations Business Wire

Curzio Research
Aug 25th, 2026
Nobody's asking the most important AI question.

Nobody's asking the most important AI question. Every week, we see another headline about which AI model is winning. Gemini vs. ChatGPT. Anthropic vs. Grok. The model war dominates the conversation, the coverage, and most investors' portfolios. For two years now, we've been focused on a different question: who keeps the lights on? Because it doesn't matter which model wins; they all need power to run. And right now, the U.S. grid is nowhere near ready to deliver it. U.S. data center power demand is expected to climb from 41 gigawatts in 2026 to 66 gigawatts by 2027, according to Goldman Sachs Research. That's a near-doubling in roughly two years. The grid can't keep up. That gap is where the real investment opportunity lives. 1. The transmission play. Everybody's fighting over who generates the power. Almost nobody's asking how it gets from the source to the data center. You can build all the plants you want. But without transmission lines, the data center stays dark. That's where Quanta Services (PWR) comes in. The company builds and maintains the electric transmission and distribution infrastructure that connects power generation to end users. No other company in the country does this at Quanta's scale. Quanta raised its 2026 revenue guidance, implying roughly 40% growth, and lifted its diluted earnings-per-share (EPS) guidance to a midpoint around $11.66. The backlog is enormous, and the pipeline keeps growing as utilities scramble to keep pace with data center load requests. If you want a second way to play this same trade, MasTec (MTZ) does similar transmission and power delivery work (albeit at a smaller scale). MasTec reported Q2 2026 revenue of $4.37 billion, up 23% year over year, with its Power Delivery segment delivering over $1.25 billion in quarterly revenue alone. Both companies win as long as AI demand keeps growing. 2. The cooling play. Getting power to the data center is step one. Keeping $40 million worth of graphics processing chips (GPUs) from melting is step two. AI chips run hot, and the denser the workload, the more heat they generate. Cooling is what keeps the whole system from shutting down. That's Vertiv's (VRT) job. The company makes the cooling systems, power distribution units, and equipment racks that go inside data centers. Last month in the Curzio Alpha portfolio, we locked in a gain of ~200% on Vertiv. But the growth story is far from over. The company reported Q1 2026 revenue of $2.65 billion, up 30% year over year, with Americas growth up 53%. And as data center density increases - and it will, because each new generation of AI chips draws more power per rack - Vertiv's products will become even more critical. 3. The generation play. Bloom Energy (BE) makes fuel cells - power generation units that run on natural gas or hydrogen and produce electricity on-site, without connecting to the broader grid. That's important because grid interconnection can take years. A data center that needs power now can't wait. We got into Bloom early and ultimately locked in gains of ~1,000% in under two years... while most investors were still arguing about chatbots. The stock has pulled back from its June highs - shares closed around $204 in late August, down roughly 40% from a June peak near $351 - but the underlying demand story hasn't changed. AI data centers need power that can come online fast. Bloom's fuel cells can make that happen. The grid, in most cases, cannot. The bigger picture. Every dollar that Big Tech pours into AI training and inference has to flow through physical infrastructure first: transmission lines, cooling systems, on-site power generation. That's not changing. If anything, it accelerates as the models get bigger and the data centers get denser. The average investor's instinct is to buy the "winning AI." The smarter trade - one we've been making for over two years - is to buy the companies that every model depends on, regardless of who comes out on top. Power isn't a supporting character in the AI story. It's the foundation everything else is built on. For more analysis on where the real AI infrastructure opportunities are - and which names are best positioned right now - tune in to Wall Street Unplugged each week. Read the signs. Beat the market. The market intelligence you need to invest one step ahead. Go beyond the headlines. Invest with an insider's edge. More about Growth Trends