B

Blattner Company

Builds infrastructure and renewable energy projects

Instrumentation and Controls Engineering Manager 2 - Gas Power Generation

Full-TimeUpdated on 10/23/2026
$147.2k - $213.5k
Senior
Bachelor's
Remote in USA
RemoteRemote role with up to 25% travel to client offices and/or project sites.
Electrical EngineeringControls & Automation Engineering
No H1B Sponsorship

About the job

Requirements
  • A four-year engineering degree in electrical or mechanical engineering from an ABET-accredited college.
  • At least five years of progressive engineering experience in gas power generation, including two or more years of leadership experience.
  • A valid driver’s license and an acceptable motor vehicle driving record.
  • Knowledge of reciprocating engine and gas turbine equipment, associated balance of plant equipment, and their applications.
  • Knowledge of multiple communication protocols and their integration, including MODBUS, Profi-Bus, and Foundation Field-Bus.
  • Knowledge of civil, mechanical-instrumentation and controls, and electrical power engineering principles, and familiarity with computer and analytical tools for equipment sizing, construction design, and 3-D modeling.
  • Familiarity with computer tools and programs used for instrumentation and controls programming and commissioning, including communications protocols, vibration monitoring, instrumentation programming and calibration, and transformer monitoring.
  • Familiarity with Continuous Emissions Monitoring Systems specifications, regulatory protocols, equipment, commissioning, and certification.
  • Familiarity with emissions control systems, primarily Selective Catalytic Reduction specifications, regulatory requirements, equipment, controls design, commissioning, and safety compliance.
  • Familiarity with engineering standards and best practices related to power generation.
  • Ability to influence and persuade groups toward common objectives.
  • Effective oral, written, listening, and presentation communication skills to work with owners, vendors, and employees.
Responsibilities
  • Serve as the company program engineering representative during all phases from conception through construction completion of gas generation pursuits, and as company program manager, interact with Blattner Business Units, reciprocating engine and gas turbine generator suppliers, and balance of plant equipment providers to establish long-lasting relationships.
  • Understand client design criteria and intent, and determine how clients and the energy market are evolving in design trends, philosophy, and criteria for gas generation plant design.
  • Travel to client offices and/or project sites as required to foster client relationships, idea propagation, and problem solving.
  • Build an understanding of the strategic dynamics essential to the gas generation market.
  • Coordinate and support engineering activities, make detailed plans to accomplish goals, and direct the integration of client and company technical activities; work with clients to ensure both parties understand design standards and process philosophies.
  • Participate in defining the company engineering and gas business plans, goals, and actions for the gas generation segment.
  • Develop and facilitate safety standards for the gas generation Engineering program and company.
  • Ensure projects are designed and constructed in compliance with applicable and prudent industry standards, including provisions specific to reciprocating engine and combustion turbine installations and fuel gas systems.
  • Serve as the root cause analysis expert for company Engineering and Instrumentation and Controls items.
  • Develop and implement consistent policies, standards, and procedures for program management, especially engineering design standards for reciprocating engine and gas turbine generating facilities; implement guardrails for design philosophy and criteria within the company program.
  • Own the design basis for power block instrumentation and controls, and collaborate with and ensure integration of the Blattner Business Units responsible for electrical design for generators and services, including protection and generation control, generator step-up and auxiliary transformers, medium voltage switchgear and collection, generator protection and synchronizing, station service and emergency power, grounding and lightning protection, cable and raceway systems, and lighting.
  • Own the design basis for balance of plant instrumentation and controls, collaborate with and ensure integration of the Blattner Business Units responsible for electrical design for equipment power, and review electrical interface design for balance of plant equipment, including fuel gas conditioning and compression, inlet air and filtration systems, lube oil and cooling systems, water treatment, cooling systems, emissions control equipment, fire protection and detection, and plant control system integration.
  • Stay current on new technologies and industry practices, identify opportunities to add value through best available technology, perform economic analysis and value engineering to determine cost-effective solutions, and prepare recommendations to the procurement team.
  • Analyze technology, resource needs, and market demands to plan and assess the feasibility of projects and engineering initiatives.
  • Facilitate creation and maintain a library of design basis documents for all company segments; ensure Procurement Managers are current on client design basis and scope of work before project estimating kickoff meetings.
  • Be an available technical resource to support engineering leads’ reviews of owner, contractor, and company scopes for completeness, identifying gaps or overlaps, particularly at terminal points between generating equipment suppliers, balance of plant vendors, and company scope.
  • Support constructability reviews of engine and turbine power block layouts, modular and skid-mounted equipment, and pre-assembled cable and conduit systems to reduce field labor and improve installation quality.
  • Support instrumentation and controls requirements for plant startup, first fire, synchronization, and performance testing, and ensure commissioning needs are reflected in design.
  • Verify and own complete protection and controls for the power block and balance of plant.
  • Act as the escalation point for instrumentation and controls commissioning issues, including protection and control settings, monitoring systems, controls testing, and controller interfaces.
  • Perform preliminary engineering through final review of design, installation, and commissioning for power generation block and balance of plant instrumentation and controls, including redundancy of instrumentation, controls hardware and logic design, winterization of instrumentation and control devices, control loop diagrams, instrument loop diagrams, and controls narratives and logic.
  • Own all controller communication protocol and interface design, including the distributed control system at power block level.
  • Own data historian configuration and representation of available data points, including internally configured points, and ensure the distributed control system provides points for the historian.
Desired Qualifications
  • A Registered Professional Engineering license is strongly preferred.

About the company

Blattner builds critical infrastructure with a focus on renewable energy projects, using an engineering, procurement, and construction (EPC) approach to deliver turnkey solar, wind, and storage facilities for utilities and developers. With over 115 years of construction experience, it handles large-scale installations across the United States, drawing on past work in railroads, highways, dams, and mines. Blattner is the parent of Blattner Energy and D.H. Blattner & Sons and is part of the Quanta Services family, which provides broad resources and capabilities. Its goal is to support America’s energy transition by delivering reliable, large‑scale renewable projects and other essential infrastructure.

Company Size

201-500

Company Stage

N/A

Total Funding

N/A

Headquarters

Avon, Minnesota

Founded

N/A

Get referred to Blattner Company

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Quanta installed over 6,000 MW in 2025, reinforcing Blattner's backlog and credibility.
  • The 2025 three-year Built Robotics agreement expands automation across U.S. solar projects.
  • Shoals' 10 GW supply agreement signals sustained demand from Blattner's utility-scale pipeline.

What critics are saying

  • Built Robotics dependency deepens if autonomous deployment slips at 15-20 simultaneous solar sites.
  • Solar construction concentration ties Blattner to Quanta's capital allocation and project pipeline.
  • Any major safety incident on robot-assisted sites in 2026 could delay adoption and contracts.

What makes Blattner Company unique

  • Blattner delivered over 80% of Quanta's 2025 solar capacity, showing unmatched EPC scale.
  • It repeatedly ranked among Solar Power World's top U.S. solar contractors from 2020-2026.
  • Blattner industrializes utility-scale solar with autonomous robots and standardized construction workflows.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) Company Match
  • Paid Vacation
  • Education Assistance (Tuition Reimbursement)
  • Gym Membership

Company News

Blattner Company
Jul 21st, 2026
Quanta leads in solar installation capacity.

Quanta leads in solar installation capacity. Posted on July 21, 2026 | 2 min. read AVON, Minn., July 21, 2026 - Blattner's parent company, Quanta Services, Inc. (NYSE: PWR), earned the top spot on Solar Power World's 2026 Top Solar Contractors list after installing more than 6,000 MW of solar capacity in 2025. The rankings, published annually by Solar Power World, recognize the leading solar contractors across the United States. Quanta's top ranking reflects its growing impact on the U.S. energy market. In 2025, Blattner delivered more than 80% of Quanta's solar capacity, helping reinforce its position as the most experienced EPC contractor in utility-scale renewable energy construction. Blattner appeared on the Top Solar Contractor list independently as No. 1 in 2020, No. 2 in 2021 and 2022, and as part of Quanta when the company was ranked No. 1 in 2023, No. 4 in 2024 and No. 1 in 2025. Quanta's Press Release, "Quanta Services Named 2026 Top U.S. Solar Solutions Provider by Solar Power World" 2026 Solar Power World Story, "2026 Top Solar Contractors List showcases veterans of dominant energy industry" 2026 Solar Power World Top Solar Contractors List

Texas Civil Justice League
May 19th, 2026
Fort Worth Court of Appeals affirms TC summary judgment for contractor in third-party liability case.

Fort Worth Court of Appeals affirms TC summary judgment for contractor in third-party liability case. The Fort Worth Court of Appeals has affirmed a trial court order granting summary judgment to a contractor in a worksite injury case in which the plaintiff alleged that the contractor retained control of the subcontractor's work. Jeremy Haggard v. Blattner Energy, Inc. (No. 02-25-00056; February 26, 2026) arose from a 2019 worksite injury at an Iowa windfarm. Plaintiff worked as a rigger, hooking parts to the crane, signaling instructions to the crane operator, and serving as the crane crew's foreman. While standing on top of a wind tower's old nacelle without fall protection, Plaintiff was knocked off when the crane operator "let this load swing out of control." Plaintiff hit the crane's stowage container on his way to the ground, injuring his abdomen. Plaintiff sued four entities, including Blattner, alleging negligence and gross negligence. After the close of discovery, Blattner filed traditional and no-evidence MSJs asserting no duty. The trial court granted summary judgment. Plaintiff appealed. In an opinion by Justice Kerr, the court of appeals affirmed. NextEra Energy, which owned the windfarm, contracted with Blattner for "repowering" and with GE for equipment supply and restarting the turbines. Blattner's job was to provide engineering, procedure, and construction services, which involved isolating the tower from electricity, removing vintage GE components, setting them on the ground, installing and rewiring new GE components, and inspecting and certifying the completion of the work. NextEra would then inspect and issue a certificate of completion, freeing Blattner to move on to the next tower. GE's job was to disassemble and remove used parts that Blattner placed at each tower's base, of which GE reacquired ownership. Blattner and GE hired subcontractors for the work. GE hired C2 logistics, Plaintiff's employer, to disassemble the old nacelles. Blattner thus neither employed Plaintiff nor had a contract with his employer. Blattner argued that it owed Plaintiff no duty. Plaintiff countered that Blattner retained contractual control of the work, creating a duty. Blattner responded that since it didn't have a contract with Plaintiff's employer, Plaintiff couldn't show that Blattner retained such control. Plaintiff didn't dispute that Blattner had no direct relationship with C2 but instead "focus-ed] on the NextEra-Blattner repowering agreement - an agreement that [Plaintiff] did not file but said NextEra would submit for an in camera inspection based on the contract's alleged confidentiality." Plaintiff failed to produce the agreement in his summary judgment evidence, but managed to produce screenshotted excerpts of it purporting to show Blattner's "complete control" of the worksite, together with a screenshot of Blattner's safety manual (which specified fall protection measures). But because Plaintiff didn't attach the agreement and safety manual themselves to his summary-judgment evidence, the court had before only unauthenticated screenshots. Additionally, the court observed "we are being asked to construe the agreement's paragraphs in isolation, including without having the agreement's defined terms - notably "Labor," "Work," and "employees." Plaintiff thus couldn't show that GE and its subs were covered by the repowering agreement in the first place. He also failed to show that Blattner's safety manual covered anyone else besides its own employees. "Based on the record before us," the court concluded, "it is unclear whether it is even corre t to classify Blattner as theor a general contractor of the entire repowering project; the devil is in the contractual details that [Plaintiff] did not produce." What is odd about this case is that nobody seemed to know whether the trial court actually reviewed the repowering agreement, nor did they request that the trial-court clerk include the unfiled agreement in the appellate record. Faced with that uncertainty, the court "must presume that the missing repowering agreement did not raise any fact issues that would have precluded the trial court's granting Blattner's no-evidence summary-judgment motion." Plaintiff would equally have failed in defeating Blattner's traditional MSJ, since nothing he produced "demonstrate that requisite level of control over the operative details of C2's work." He attempted to argue that he raised a fact issue as actual (as opposed to contractual) control. But that would require evidence that Blattner retained "a right of supervision that the independent contractor [C2] is not entirely free to do the work in its own way." As the court stated, "[f]or a duty to arise through exercising actual control over a job worksite - what is essentially a negligent undertaking - an affirmative course of action is required." But even Plaintiff's testimony acknowledged that he didn't see any Blattner people at the worksite until after he was hurt, when they gave him first aid while awaiting the ambulance. Plaintiff also testified that two weeks prior to the accident, Blattner stopped work on his tower because he was unharnessed. The work resumed when C2 told the Blattner safety rep that a harness could't be used because there was nothing to which to attach it. None of this established actual control. It did establish that Plaintiff's employer "controlled the disassembly work at each tower" without interference from Blattner," which was "free to direct C2 on when and where it worked and to set minimal safety standards without becoming C2's insurer for its negligent acts." And, by the way, the testimony of Plaintiff's "safety expert" about OSHA multi-employer directives concerning who is a "controlling entity" have no effect on Texas common law one way or the other. The trial court thus properly granted summary judgment.

PR Newswire
Jul 25th, 2023
Quanta Services Named 2023 Top Solar Contractor By Solar Power World

Quanta Operating Companies Collaborate to Achieve Solar Industry Top Spot and Historic MilestoneHOUSTON, July 25, 2023 /PRNewswire/ -- Quanta Services, Inc. (NYSE:PWR) announced today that it has been named the top solar infrastructure solutions provider in the United States by Solar Power World. This achievement was made possible by the collaborative work of three Quanta operating companies: Blattner Company, RP Construction Services (RPCS) and The Ryan Company. The combined expertise and efforts of the three companies installed more than two gigawatts of domestic solar generating capacity in 2022 alone – a new milestone of achievement in Top Solar Contractor history.Duke Austin, Quanta Services' President and Chief Executive Officer said, "Being named Top Solar Contractor is an honor and tells part of the bigger story of how we are working to build a brighter and cleaner energy future for the country. To achieve a reduced-carbon economy, we must actively collaborate to drive the shift toward renewable and sustainable energy solutions."Quanta's renewable energy infrastructure solutions powers modern life, and with its more than 200 operating companies, Quanta is building, modernizing and maintaining energy infrastructure across North America and Australia. Powerhouse renewable energy engineering, procurement and construction (EPC) solutions provider, Blattner Company, was acquired by Quanta in 2021 and during its history has constructed more than 25 percent of the utility-scale renewable energy generating capacity in the United States

Factor This
Jul 19th, 2023
The race is on to build solar farms with robots

Meanwhile, Sarcos has signed an agreement with engineering, procurement, and construction firm Blattner Company to develop and refine its own autonomous mobile robotic system for utility-scale solar construction.

Investors Prism
Jun 12th, 2023
Shoals Technologies Signs Master Supply Agreement with Blattner

Shoals Technologies Group (Nasdaq: SHLS ) has signed a Master Supply Agreement with Blattner Company to deliver 10 GW of its award-winning Big Lead Assembly (BLA) and systems solutions over the next two years.