A

Archirodon Group

Builds ports and energy infrastructure

E&1 Job Performer

Full-TimeUpdated on 10/23/2026
No salary listed
Mid, Senior
Bachelor's
Abu Dhabi - United Arab Emirates
In Person
Building TradesElectrical

About the job

Requirements
  • Bachelor degree, diploma, or ITI in Electrical Engineering, Instrumentation Engineering, Electronics, or an equivalent.
  • Minimum 3–5 years of experience working on ADNOC facilities or similar operating oil and gas plants.
  • Proven experience working inside ADNOC facilities with Permit-to-Work system exposure.
  • Strong knowledge of the ADNOC Permit-to-Work system and Energy Isolation procedures.
  • Ability to read and interpret electrical drawings, single-line diagrams, P&IDs, loop drawings, cable schedules, and wiring diagrams.
  • Experience with electrical installations, cable laying, termination, testing, field instrumentation, loop checking, calibration, and control systems.
  • Knowledge of electrical testing, instrument calibration, and troubleshooting techniques.
Responsibilities
  • Perform the duties of an E&I Job Performer in accordance with ADNOC Permit-to-Work requirements.
  • Ensure all electrical and instrumentation work is carried out in accordance with approved permits, method statements, Job Safety Analysis, and risk assessments.
  • Supervise installation, testing, maintenance, modification, and commissioning activities for electrical and instrumentation systems.
  • Verify that all required isolations, Lock Out/Tag Out, gas testing, and safety precautions are completed before starting work.
  • Conduct toolbox talks and ensure all personnel understand the work scope, hazards, and control measures.
  • Ensure compliance with ADNOC Life Saving Rules, HSE procedures, and the proper use of Personal Protective Equipment.
  • Coordinate with the Permit Holder, Area Authority, Operations, HSE, and other disciplines to ensure safe work execution.
  • Monitor work progress and ensure activities comply with project specifications, approved drawings, and quality requirements.
  • Support pre-commissioning, commissioning, loop checking, functional testing, and system handover activities where applicable.
  • Maintain accurate records of permits, inspections, testing, and completed work.
Desired Qualifications
  • ADNOC-approved Electrical or Instrumentation Job Performer certification is an added advantage.
  • ADNOC WMS/PTW/Job Performer training and authorization is preferred.

About the company

Archirodon Group builds ports, bridges, oil and gas facilities, and other large infrastructure, mostly in the Middle East, Africa, and Europe. Its past projects include Jebel Ali Terminal 2 in Dubai and Khalifa Port in Abu Dhabi, and its work spans marine construction, energy projects, government infrastructure, dredging and pipe laying. National oil companies in Abu Dhabi and Kuwait are among the clients that pay it to run whole projects, from engineering the design and buying materials and equipment to construction, commissioning and operation. Two Greek firms founded Archirodon in 1959, and the group is headquartered in Dordrecht, Netherlands, with a major presence in Athens.

Company Size

10,001+

Company Stage

N/A

Total Funding

N/A

Headquarters

N/A

Founded

1959

Get referred to Archirodon Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Archirodon's October 2025 Kuwait award added a KD160 million oil-pier contract to its construction workload.
  • Archirodon says most teams have worked together for more than ten years, providing established colleagues to learn from.
  • Archirodon reports $4 billion in active projects, a substantial base of contracted work.

What critics are saying

  • Hyundai's March 2026 disclosure confirmed NEOM had terminated Archirodon's tunnel venture after a client-led project reorganisation.
  • Archirodon's consortium withdrew from Albania's port tender in March 2026, citing rising international construction costs, according to the minister.
  • Archirodon's fabrication managers face client audits, verify steel-and-pipe testing before dispatch, and submit weekly and monthly progress reports.

What makes Archirodon Group unique

  • Archirodon owns over 5,000 equipment units, including 300 for marine and diving work and 20 for dredging.
  • Archirodon invests project equity and arranges financing without recourse to investors' balance sheets, alongside construction delivery.
  • Archirodon's Saudi power-and-water experience includes Shoaiba's 15-year construction programme covering electricity generation and desalination.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Relocation Assistance

Company News

Tunnels & Tunnelling
Mar 18th, 2026
Neom cancels The Line tunnels contracts.

Neom cancels The Line tunnels contracts. The 170km-long linear city is being redesigned as data centres. Neom has cancelled the contracts related to the construction of the tunnel sections of The Line in north-west Saudi Arabia, T&TI's sister publication, MEED, reports. In a stock exchange announcement filed on March 13, South Korean contractor Hyundai E&C said that Neom cancelled its contract on December 29 last year. Hyundai E&C was executing the drill-and-blast section of The Line's tunnels in a joint venture with Greece's Archirodon and South Korean counterpart Samsung C&T. The firm said its share of the joint venture was about 35%, amounting to $483m. Neom awarded contracts for constructing the mountain tunnel sections of The Line in June 2022. The drill-and-blast works were split into four packages, with two contracting teams winning two packages each. The other joint-venture team comprised Spain's FCC, the local Shibh Al-Jazira Contracting Company (Sajco) and Beijing-based China State Construction Engineering Corporation. The tunnels formed part of the infrastructure backbone of Neom's 170km The Line development, launched in January 2021. What began as Crown Prince Mohammed Bin Salman's defining symbol of a post-oil Saudi Arabia unravelled with quiet finality over roughly two years. By April 2024, planners were reportedly being forced to cut the initial phase to just 2.4km by 2030. By July last year, with the sovereign wealth fund facing tightening liquidity, the kingdom was reported to have conducted a "strategic review" to determine whether The Line was feasible - a process described as a "recalibration" of Vision 2030. Resources are now being directed to projects essential for the Fifa World Cup 2034, Expo 2030, and critical housing, healthcare and education targets. According to media reports, the government has pivoted towards repositioning what remains of Neom as an industrial and data centre hub, leveraging the Red Sea coastline's access to seawater cooling for AI infrastructure. This news article was first reported by T&TI's sister publication, MEED. Give your business an edge with its leading industry insights.