E

Enbridge

Pipeline-based energy transport and renewables generation

Infrastructure Planning Specialist - Infrastructure Planning

Full-TimePosted on 10/23/2026Deadline 11/2/26
No salary listed
Expert
Bachelor's
Calgary, AB, Canada+2 moreMore locations: Edmonton, AB, Canada | Fort McMurray, AB, Canada
HybridHybrid work; travel under 10%, including short overnight trips within Canada and the United States, is required. A valid passport is required.
Business & StrategyBusiness Operations

About the job

Requirements
  • A technologist diploma is required.
  • A bachelor's degree in engineering would be considered.
  • A professional designation such as CET or P.Eng. is considered an asset.
  • At least 12 years of relevant industry experience, preferably in pipeline operations, commercial optimization, engineering, or related disciplines; project development and/or project execution experience is preferred.
  • Knowledge of Liquids Pipeline systems, operations, and key internal stakeholder relationships is required.
  • Ability to travel throughout Canada and the United States and a valid passport are required.
Responsibilities
  • Evaluate commercial opportunities and operational requests, assess feasibility, and develop executable solutions that maximize system value.
  • Provide strategic recommendations on complex business and technical challenges to support informed decision-making and business growth.
  • Identify, develop, and advance optimization initiatives and business cases that improve throughput, efficiency, and financial performance.
  • Define project scope and support high-impact growth, optimization, and energy transition initiatives with significant financial implications.
  • Partner across commercial, operational, technical, and functional teams to align priorities, resolve issues, and deliver successful outcomes.
  • Leverage technology, system expertise, and commercial insight to improve processes, increase efficiency, and drive continuous improvement.
Desired Qualifications
  • Experience in project development and/or project execution is preferred.

About the company

Enbridge builds and operates energy infrastructure in North America, focusing on the transportation, distribution, and generation of energy. It runs a vast network of pipelines that move crude oil and natural gas from production sites to refineries and customers, and it also generates renewable energy from wind and solar projects. The company earns money mainly through long-term fees charged for transporting and distributing energy, with additional income from its renewable assets and related services. Compared with peers, Enbridge combines a large, integrated pipeline network with a growing portfolio of renewable generation, underpinned by long-term contracts that provide predictable revenue. Its commitments to safety and sustainability, including a goal to reach net-zero emissions by 2050, guide its operations and corporate strategy. Overall, Enbridge aims to keep energy flowing safely and reliably while supporting the transition to cleaner energy.

Company Size

10,001+

Company Stage

IPO

Headquarters

Calgary, Canada

Founded

1949

Get referred to Enbridge

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 adjusted EBITDA reached $4.8 billion, while operating cash flow rose to $4.1 billion.
  • Enbridge sanctioned the $1 billion Line 5 Relocation project and advanced a $41 billion backlog.
  • September 2026 Tallgrass assets add 460,000-bpd Pony Express capacity and Cushing connectivity.

What critics are saying

  • Wisconsin DNR cited permit violations after Enbridge restarted Line 5 bypass work in September 2026.
  • The August 25 Saxon spill released 1.3 million gallons, triggering PHMSA corrective action and cleanup costs.
  • Michigan courts reopened Line 5 tunnel fights in 2026, threatening years of delays and stranded assets.

What makes Enbridge unique

  • September 2026 Tallgrass and Salt Creek deals deepen Enbridge’s integrated Rockies-to-Gulf Coast crude system.
  • Enbridge’s $41 billion secured backlog and 31-year dividend streak signal durable fee-based cash generation.
  • Michele Harradence’s January 2027 promotion preserves continuity across gas utilities, pipelines, and renewables.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Flexible Work Hours
  • Hybrid Work Options
  • Paid Vacation

Growth & Insights and Company News

6 month growth

3%

1 year growth

3%

2 year growth

3%
Yahoo Finance
Oct 21st, 2026
Retirees swap Social Security for 5 dividend stocks yielding up to 6.64%

Retirees looking for income beyond Social Security are turning to dividend stocks. The 2027 cost-of-living adjustment is tracking toward 3.3%, and five companies from different industries were screened for dividend safety first, then yield. Verizon yields 6.64% and Altria 6.17%. Verizon's free cash flow guidance of $21.94 billion to $22.14 billion covers its roughly $11.76 billion annual dividend. Altria's payout is about 79% of the low end of its 2026 earnings guidance. Realty Income pays monthly at a 5.99% yield and has raised its dividend 115 consecutive quarters. Enbridge yields 5.95%. AbbVie yields 2.48%, but its quarterly dividend has grown from $0.40 in 2013 to $1.73 in 2026. Risks include satellite competition for Verizon, falling cigarette volumes for Altria, and currency swings for Enbridge.

Enbridge Inc.
Oct 20th, 2026
Release Details - Enbridge Inc.

News Release - Individual release details

East Daley Analytics
Oct 20th, 2026
TETCO, ARM projects take aim at Gillis bottleneck.

TETCO, ARM projects take aim at Gillis bottleneck. Posted by: East Daley Analytics Enbridge (ENB) is working with ARM Energy Holdings on pipeline expansions to move gas supply from Katy to the Gillis hub in southwestern Louisiana, to feed Port Arthur LNG and potentially other projects. The expansions are targeting a bottleneck East Daley Analytics has flagged that could stymie lofty growth expectations for LNG exports. ENB subsidiary Texas Eastern Transmission (TETCO) opened a non-binding open season on Oct. 7 for the Katy to Gillis Expansion. The project aims to deliver up to 2 Bcf/d from Katy to Gillis, a key hub for LNG projects planned in Louisiana. Under the offering, TETCO would enter into firm transport agreements with Mustang Express Pipeline, a new 2.5 Bcf/d intrastate pipeline ARM is developing with financial partner PIMCO. Mustang Express would deliver gas from Katy to Vidor, TX, near Port Arthur. Shippers would then use TETCO's Zone WLA system to move gas from Vidor to the Gillis hub. Responses to the open season are due by Oct. 30. TETCO is targeting an in-service date of 1Q31. Mustang Link is Key to Project ARM Energy's Mustang Express is the linchpin of the coordinated expansions. The 236-mile project is backed by an anchor commitment with Sempra Energy (SRE) to support the Phase 2 expansion at Port Arthur LNG. Mustang Express includes three 42-inch pipe segments: a 178-mile mainline from the Katy hub to Port Arthur, a 55-mile pipeline (the Cougar lateral) from the Tres Palacios storage facility to Katy, and a 3-mile lateral to the Golden Triangle/Spindletop storage fields near Port Arthur. ARM announced a final investment decision on Mustang Express in October 2025. The project has financial backing from PIMCO and other investors at an estimated $2.3B cost. The partners plan to start service by late 2028 or early 2029. Sempra's Port Arthur Phase 2 expansion includes two trains totaling ~13 Mtpa of LNG export capacity, or around 1.7 Bcf/d of feedgas demand. If SRE signed up for all of its feedgas needs, it would leave ~800 MMcf/d of capacity on Mustang Express for other LNG or industrial customers at the current scope, and potentially more if ARM upsizes Mustang Express. In the Houston Ship Channel Supply & Demand report, East Daley models Mustang's capacity in place by late 2028 and flowing ~1.0 Bcf/d from the middle of 2030 through 2031, growing to 1.9 Bcf/d in 2032. If fully subscribed and utilized, Mustang Express could spawn other expansions along the TX/LA corridor. According to the TETCO open season, Mustang has identified other expansion opportunities to Vidor above its initial design, and would pursue them if favorable shipper demand emerges. LNG Growth Could Hit the Wall at Gillis The TETCO and ARM projects are targeting an underappreciated bottleneck in the natural gas value chain. East Daley reviews the problem in The LNG Reckoning, our latest white paper examining trends in the natural gas market. Feedgas demand for LNG exports is on track to grow 28 Bcf/d by 2035; a large share of that growth will come from projects based in southwestern Louisiana and the Golden Triangle in Texas. The Permian Basin will supply a big share of new demand, pushing gas moving into the Katy hub through projects like WhiteWater's Eiger Express and Solitude. But the supply must then be moved from Katy into Louisiana, and here current pipeline infrastructure falls short of the task. In The LNG Reckoning, we forecast committed capacity into Gillis is exhausted by 2031. This means that many emerging LNG projects have a narrow window, through around 2027, to sanction new pipeline projects and secure feedgas in time to meet startup schedules. A 1Q31 target for the TETCO expansion would fall just inside that window. TETCO's own footprint through the TX/LA corridor is modest at current design. East Daley models just 600 MMcf/d of capacity on the system from the Houston Ship Channel to Louisiana, currently flowing ~50 MMcf/d. The project depends on new Mustang infrastructure delivering more supply into the TECTO system. The timing fits the looming infrastructure crunch. We see HSC-to-Louisiana flows rising from 2.2 Bcf/d today to 8.1 Bcf/d in 2030. The Trident project (2.0 Bcf/d, 2027 ISD) and Mustang add 4.5 Bcf/d of capacity, while flows on Blackfin/CP Express, already in the capacity base, ramp from zero to 3.5 Bcf/d by late 2028. Investor Takeaway: Growth in LNG exports will require investments along the gas value chain, and the Gillis hub is a prime target. Mustang Express and the TETCO expansion will help ease tightening takeaway into Gillis, but additional infrastructure will still be needed to meet the 28 Bcf/d of LNG demand growth that we expect. - Alec Gravelle and Andrew Ware Tickers: ENB, SRE. Introducing The LNG Reckoning, East Daley's Latest White Paper East Daley Analytics has published our latest white paper, The LNG Reckoning. Surging LNG exports are colliding with new data center demand, setting the stage for disruptions in the US natural gas market. We view midstream, not resources, as the primary bottleneck, and expect problems to emerge based on the interdependency of energy commodity chains. In The LNG Reckoning, we identify the potential choke points ahead. Download a copy now. How Will Data Centers Affect Development in the Permian Basin? Data centers are adding significant, non-intermittent demand for natural gas. What could that mean for Permian production and infrastructure? Join East Daley on Oct. 28 at 10 am MT for a look at how growing gas demand could reshape the region's natural gas, crude oil and NGL markets. We'll cover: * Natural gas: Permian demand is growing from Gulf Coast pipeline expansions and gas-fired power generation supporting data centers. The basin could very become short gas - a strange paradox for a basin that has been notoriously constrained in the past. * Crude: As gas demand and egress capacity grow, producers could shift toward gassier windows in the Delaware and Midland basins, producing more associated gas alongside lower oil volumes. We'll consider how that could ease crude egress pressure, and how much new oil pipeline capacity might be needed beyond potential brownfield expansions. * NGLs: Higher Waha prices could encourage more ethane rejection, while new very large ethane carriers (VLECs) are expected to be built over the next several years. We'll explore the tug-of-war between rejection at the wellhead and growing demand at the dock - and what it could mean for ethane production. Register now before spots fill up to hear East Daley's analysis of the infrastructure and production shifts shaping the Permian. The Daley Note Subscribe to The Daley Note for energy insights delivered daily to your inbox. The Daley Note covers news, commodity prices, security prices and EDA research likely to affect markets in the short term. Posts by topic. October 16, 2026 October 15, 2026 October 14, 2026 October 13, 2026

Yahoo Finance
Oct 19th, 2026
Enbridge vs. TC Energy: 6.0% yield and 31 straight raises beat TC's 4.2%

Enbridge is the better dividend stock than TC Energy, according to a comparison of the two Canadian pipeline companies. Enbridge yields 6.0% and raised its dividend 3.1% a year from fiscal 2020 to fiscal 2025. TC Energy yields 4.2% and raised its payout 1.0% a year. On December 3, 2025, Enbridge lifted its quarterly dividend 3% to C$0.97 a share, its 31st consecutive annual increase. TC Energy's dividend per share fell from C$3.70 in fiscal 2024 to C$3.40 in fiscal 2025. TC Energy has wider coverage: distributable cash flow covered its dividend 1.96x in fiscal 2025, against 1.51x for Enbridge. Enbridge's debt-to-EBITDA was 5.1x at the end of June 2026, above its 4.5x to 5.0x target. It expects to return to that range by the end of 2026.

Yahoo Finance
Oct 19th, 2026
Enbridge revenue nearly doubled, but it's a gross-up as commodity costs rose in step

Enbridge's revenue nearly doubled in the quarter ended in June, while earnings fell by a third. Neither figure reflects the business, the report says. Commodity sales drove the revenue rise, but commodity costs climbed by almost the same amount. Only 10.16% of revenue reached operating profit. The earnings drop came from other income, which swung from a sizeable gain to a small expense. The change was mostly unrealised derivative value shifts, not cash. Interest expense rose 18.10%, and 162.98% of equity is borrowed. The shares closed at $48.10 on October 16, 18% below their high. They trade at 20.37 times expected earnings and yield 5.82%. Hedge fund holders fell to 31 from 37, with a combined stake of about $3.30 billion.