C

City of Marietta, GA

Municipal government delivering city services

Equipment Operator

Full-Time
$17 - $21.43/hr
Junior
Marietta, GA, USA
Remote
Building Trades

About the job

Requirements
  • A high school diploma or GED is preferred.
  • Must have a Georgia Class A commercial driver's license at time of hire, with seven years of satisfactory driving history and no driving under the influence convictions in the last five years.
  • A minimum of two years of experience operating backhoes, front-end loaders, tractors, jackhammers, asphalt wagons, tamps, and other related equipment.
  • Must pass a pre-employment street repair equipment test on backhoes, front-end loaders, and other heavy equipment.
  • Knowledge and skill in laying brick and pouring concrete.
  • Knowledge of basic carpentry skills.
  • Successful candidates are required to submit to a drug screen and background inquiry.
Responsibilities
  • Operate construction equipment, including a dump truck, boom truck, street sweeper, bus hog, front-end loader, and backhoe, to repair and construct city streets, drains, and sidewalks.
  • Build forms and pour concrete for curbs, gutters, drains, and sidewalks.
  • Dig ditches with a tractor and lay drainage pipe; lay brick or blocks in drain systems; and build head walls.
  • Repair streets by removing broken asphalt and filling with new asphalt.
  • Operate a jackhammer, tamp, air compressors, and other gas-powered equipment.
  • Cut grass and weeds and pick up trash on public rights-of-way.
  • Clean storm drains, grates, and gutters.
  • Check drainage pipes for overflow during rainstorms.
  • Replace or repair state highway catch basin lids.
  • Clean equipment, perform maintenance inspections, and complete maintenance report forms as required.

About the company

Marietta, Georgia operates as a municipal government serving residents and businesses with utilities (Marietta Power & Water), sanitation, roads, parks, public safety, planning, zoning, and code enforcement. Its government uses a Mayor-Council-Manager system, where the elected council sets policy and a City Manager handles daily operations. The city differentiates itself through its department structure and an active Economic Development division that offers incentives to attract and retain businesses. Its goal is to provide reliable services, maintain infrastructure, ensure public safety, preserve community character, and foster economic growth for large employers and small firms.

Company Size

201-500

Company Stage

N/A

Total Funding

N/A

Headquarters

Marietta, Georgia

Founded

1834

Get referred to City of Marietta, GA

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • FY2027 general fund rises to $80.9 million, preserving core municipal hiring capacity.
  • 2026 sewer and water replacements address aging infrastructure before failures spread.
  • January 2026 water and wastewater rate increases fund system upgrades and operating resilience.

What critics are saying

  • 2024 audit remains unfinished, with state investigation into $156,881.50 of questioned payments.
  • Upper ER Sewer Replacement runs through early 2027, disrupting roads near Kennestone Regional Medical Center.
  • A 2026 surety notice could raise bonding costs and strain future city financing.

What makes City of Marietta, GA unique

  • Marietta Power & Water gives the city direct control over utilities and reliability.
  • FY2027 budget totals $433.2 million, supporting police, fire, public works, and development.
  • Lockheed Martin and Dobbins Air Reserve Base anchor Marietta's employer base.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Flexible Work Hours

Company News

City of Marietta, Georgia
Aug 4th, 2026
Marietta's Public Works department receives distinguished awards.

Marietta's Public Works department receives distinguished awards. Home Posted on August 04, 2026 August 8, 2026 Communications Manager 770-794-5509 MARIETTA, GA - The City of Marietta's Department of Public Works received two distinguished awards given at the Georgia Chapter of American Public Works Association (APWA) Annual Awards Banquet on July 9th. These recognitions include Public Works Manager of the Year and Project of the Year awards for the State of Georgia. The Georgia Chapter APWA's Awards Program honors outstanding public works employees, individuals, groups, and projects, representing the best achievements in the public works profession in Georgia. "These awards reflect the exceptional quality of our Public Works staff and the high level of service they provide," said Mark Rice, the City's Director of Public Works. "This recognition speaks to the professionalism found throughout our department. Our employees take great pride in their work and remain committed to finding effective solutions that benefit the community." The awards received are as follows: * The 2026 Public Works Manager of the Year (Administrative) was awarded to Scott Stokes, Deputy Director of Operations, in recognition of his more than 49 years of local government experience, strong leadership and continued commitment to public service. Since joining the City of Marietta in 2018, he has overseen employees across the Fleet, Sanitation, Streets and Traffic divisions and helped lead major initiatives, including the Fleet building expansion, Sanitation roll cart conversion, improved collection routing, numerous construction and maintenance projects, and the department's achievement of APWA accreditation. He is also recognized for maintaining a high standard of customer service, supporting emergency operations, mentoring public works professionals, and consistently prioritizing the safety of employees. * The 2026 Structures Project of the Year (<$1 Million) was awarded to the City for the Lake Dodd Pipe Crossing Project for the department's innovative rehabilitation of a failing double-barreled stormwater system beneath a heavily traveled roadway. Faced with major utility conflicts that prevented a traditional pipe replacement, Public Works developed an alternative approach that allowed the road to remain open with only minimal lane closures. The project included replacing the most damaged pipe sections, manually clearing approximately 300 feet of debris, stabilizing underground voids, installing cured-in-place pipe lining, constructing a new outlet headwall and improving erosion control and pedestrian accessibility. Managed and inspected by City staff, the $556,837 project was completed in approximately two and a half months, ahead of the 120-day schedule, while maintaining public access and minimizing impacts to nearby businesses, emergency services and motorists.