B

Barrios

Aerospace engineering and mission operations contractor

Technical Project Scheduler 3

Project ManagementConfirmed live in the last 24 hours
Full-timeHouston, TX, USANo salary listed

About the Job

Requirements

  • A Bachelor of Science or Bachelor of Arts degree from an accredited college or university and ten years of applicable experience are required.
  • Excellent written and verbal communication skills and the ability to interface with various customers are required.
  • The ability to work well in a team and independently on a dynamic development program is required.
  • Data-gathering, attention-to-detail, analytical, and critical-thinking skills are required.
  • The ability to take initiative and complete tasks with minimal management direction is required.
  • Proficiency in Microsoft Office and scheduling software such as Primavera P6 or Microsoft Project is required.
  • Advanced understanding of Microsoft Excel is required.
  • The ability to understand technical concepts and designs and relate them to schedule inputs and impacts is required.
  • The ability to create and analyze integrated master schedules is required.
  • U.S. citizenship is required, along with successful completion of a U.S. government background investigation.
  • Applicants selected may be subject to a government security investigation and must meet eligibility requirements for access to classified information.
  • The ability to sit for extended periods, lift and carry up to 25 pounds, and enter test-facility areas when necessary is required.
  • Regular attendance and the ability to work outside normal hours and adjust schedules during peak periods or surges are required.
  • The ability to work in a team atmosphere and maintain professional behavior and appropriate grooming and dress is required.

Responsibilities

  • Support a project team contributing to human spaceflight and exploration.
  • Coordinate with technical leads and project management personnel to develop and maintain technical schedules.
  • Conduct schedule analyses and assessments to ensure schedules have complete network logic and can report critical paths.
  • Provide guidance and recommendations on schedule workarounds and recovery plans to support effective decision-making.
  • Perform schedule risk assessments and provide guidance and recommendations to NASA management.
  • Track schedule progress and develop custom reports and metrics.
  • Attend key project meetings and reviews, and present schedule status and metrics.
  • Integrate cost and schedule, ensuring budget and resource requirements for programs and projects are achievable.
  • Assess impacts resulting from changes to project cost, schedule, or technical baselines.
  • Perform other duties as required.

Desired Qualifications

  • A degree in science, technology, engineering, or mathematics from an accredited college or university is preferred.
  • Experience with Tableau, Structured Solutions, Inc. tools, and ASIT is preferred.
  • Prior experience developing resource-loaded schedules is preferred.
  • PMI-SP certification or equivalent is preferred.
  • Schedule analytics experience is preferred.
  • Experience with very large, complex project schedules is preferred.
  • Experience working in human spaceflight programs is preferred.

About the Company

Barrios

Aerospace engineering and mission operations contractor

Barrios Technology provides mission-critical engineering and technology services for the aerospace sector, serving primarily as a NASA prime contractor. Its work covers the full mission lifecycle, including planning, payload integration, real-time flight operations, and post-flight analysis, with capabilities in systems engineering, software, program management, and data analytics for programs like the ISS, Orion, and Artemis. It differentiates itself as a long-standing, woman-owned small business with deep NASA ties and end-to-end mission support, backed by ISO 9001 and AS9100 quality certifications. Its goal is to deliver reliable, long-term mission support for government and commercial space initiatives while upholding high performance and quality standards.

Company size
501-1,000
Company stage
Not listed
Total funding
Not listed
Headquarters
Houston, TX
Founded
1980

Recently Posted Jobs

Explore more opportunities at Barrios

See more jobs