Full-Time

Technical Project Manager

Updated on 8/12/2026

Marvel Fusion

Marvel Fusion

51-200 employees

Pursues laser-driven inertial confinement fusion

Compensation Overview

$150k - $244.2k/yr

Fort Collins, CO, USA

In Person

On-site coordination and installation work at the ATLAS facility in Fort Collins is required.

Bachelor's

Category
Engineering Management (1)
Business & Strategy (2)
,
Required Skills
ISO 9001

Get referred to Marvel Fusion

See people who can refer or advise you

Requirements
  • An engineering background with a degree in a technical field such as electrical, mechanical, systems, or industrial engineering, combined with strong project management skills applied in complex, multidisciplinary environments.
  • Five to ten years of experience managing complex technical or engineering projects, ideally Engineering, Procurement, Construction, and Commissioning projects, with full ownership from initiation through delivery.
  • Proven ability to coordinate multidisciplinary engineering teams and understand system integration challenges, including subsystem interfaces, dependencies requiring coordination, and methods for keeping multiple workstreams aligned.
  • Ability to operate autonomously on-site while maintaining close alignment with the international team and working across time zones, cultures, and engineering disciplines.
  • Excellent written and verbal communication skills in English, with the ability to translate technical complexity into clear, decision-ready information for leadership.
  • Proven ability to work effectively in a matrix organization, coordinate across teams and functions without direct authority, and build consensus across differing technical and organizational perspectives.
Responsibilities
  • Lead the integrated execution plan for the ATLAS facility, driving installation, integration, and commissioning of PW-class laser systems, beam transport, control systems, and supporting infrastructure through facility readiness.
  • Develop and maintain integrated project plans including timelines, milestones, resource planning, and deliverables.
  • Ensure alignment between engineering development activities in Germany and on-site implementation in Colorado so design intent is accurately translated into physical implementation.
  • Identify, track, and resolve integration priorities across mechanical, laser, electrical, controls, and facility subsystems while maintaining a holistic view of system dependencies and integration risks.
  • Act as the primary technical interface between the technical teams in Munich and Fort Collins and ensure structured, timely information flow.
  • Own coordination of technical requirements, interfaces, and integration points between subsystems, maintaining documented records of decisions, open items, and resolutions.
  • Lead preparation and execution of installation activities for high-power laser infrastructure, including on-site readiness, sequencing, and commissioning across all subsystems.
  • Identify technical gaps and drive resolution across engineering teams.
  • Coordinate procurement for laser systems and on-site infrastructure with the procurement department, aligning technical specifications, supplier relationships, and delivery schedules for laser components, optical systems, mechanical structures, and control hardware.
  • Own project reporting and stakeholder communication across levels and geographies through structured communication on project progress, decisions, and open items.
  • Serve as the primary interface across the ATLAS facility, on-site teams, Munich, and external partners.
Desired Qualifications
  • Hands-on experience with high-power laser systems, photonics, optics, or similarly complex scientific or industrial infrastructure.
  • Familiarity with quality and configuration management standards applicable to construction and infrastructure projects, including ISO 9001 and ISO 10007.
  • German language proficiency.
  • Prior experience in a greenfield facility build or large-scale laboratory environment involving the integration of multiple engineering workstreams into a coherent commissioning outcome.

Marvel Fusion develops laser-driven fusion energy using non-thermal direct-drive inertial confinement with nanostructured fuel targets. It aims to trigger fusion reactions with low-neutronic fuels like hydrogen-boron, reducing long-lived radioactive waste. The company builds a new high-powered laser facility in collaboration with Colorado State University, housing multiple multi-petawatt lasers to conduct experiments and advance fusion research. Its approach differs from many competitors by applying direct-drive laser for fusion with nanostructured fuels and a focus on hydrogen-boron to minimize waste, supported by a strong academic and private funding network. The goal is to enable a safe, clean, and reliable fusion power plant that helps the world move toward sustainable energy.

Company Size

51-200

Company Stage

Grant

Total Funding

$166.9M

Headquarters

Munich, Germany

Founded

2019

Get referred to Marvel Fusion

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Marvel Fusion closed €113 million in March 2025, lifting total funding to €385 million.
  • CSU expects ATLAS completion in 2026, and Marvel Fusion posted construction progress in October 2025.
  • LMU inaugurated LION 2 in July 2025, expanding Marvel Fusion's Munich experiment capacity.

What critics are saying

  • Marvel Fusion still sells a 2032 prototype, leaving eight years before revenue-scale validation.
  • ATLAS completion slipped to 2026, and any CSU delay pushes the first U.S. milestone.
  • If target fabrication costs and laser uptime miss plan, the hydrogen-boron thesis dies.

What makes Marvel Fusion unique

  • Marvel Fusion pairs laser-driven fusion with nanostructured targets, unlike tokamak competitors.
  • Siemens Energy joined in March 2025, giving industrial grid and plant-design credibility.
  • Its CSU ATLAS facility targets three multi-petawatt lasers, a rare U.S. asset for 2026.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Flexible Work Hours

Growth & Insights and Company News

Headcount

6 month growth

-1%

1 year growth

-3%

2 year growth

-4%
Germany Trade & Invest (GTAI)
Apr 16th, 2025
Marvel Fusion Secures EUR 113M Funding

Marvel Fusion, a Munich-based energy start-up, secured €113 million in venture capital funding. The company is researching laser-enabled nuclear fusion to create clean energy, with Siemens Energy leading the financing round.

MAJUNKE.com
Apr 8th, 2025
Marvel Fusion raises EUR 113M funding

Marvel Fusion, a Munich-based fusion startup, expanded its Series B funding round by €50 million, bringing the total to €113 million. New investors include EQT Ventures, Siemens Energy Ventures, and the European Innovation Council Fund, marking their first investment in fusion energy. Existing investors Tengelmann Ventures and Bayern Kapital also participated. This raises Marvel Fusion's total funding to €385 million, making it the best-funded European fusion company.

deutsche-startups.de
Mar 28th, 2025
WunderGraph raises $7.5 million funding

WunderGraph has raised $7.5 million from eBay Ventures, Karma Ventures, and Aspenwood Ventures. The startup, founded in 2020 by Dustin Deus, Jens Neuse, Björn Schwenzer, and Stefan Avram, is an open-source GraphQL federation solution. The company is currently profitable and has a team of under 20 people.

Financial Times
Mar 27th, 2025
Germany’s Marvel Fusion raises €113mn as nuclear fusion race heats up

EQT Ventures and Siemens Energy among new backers in Munich-based start-up’s latest funding round

Laser Focus World
Oct 7th, 2024
Marvel Fusion secures €62.8M Series B

In September, venture activity surged with significant photonics funding. Marvel Fusion secured a €63M Series B led by HV Capital, focusing on inertial confinement fusion. Quantum Source raised $50M in a Series A for photonic quantum computers, while Italian startup Ephos garnered $8.5M in Seed funding. MedTech firm SpectraWave obtained $50M in Series B funding. AttoTude, a networking startup, announced a $29M Series A led by Sutter Hill Ventures.