D

Deriva Energy

Builds and operates renewable power projects

Solar Technician 1

Full-TimePosted on 10/26/2026Deadline 11/9/26
No salary listed
Entry
Associate's
Rogers City, MI, USA
In PersonBased at Little Trout Solar in Rogers City, MI; daily travel may include multiple sites.
General Maintenance & RepairEquipment Maintenance
No H1B Sponsorship

About the job

Requirements
  • High school diploma or GED.
  • For Level I, the ability to complete Level I job performance measures and Deriva Energy renewables academy training within one year.
  • For Level II, two years of related work experience and the ability to complete Level II job performance measures and Deriva Energy renewables academy training within one year.
  • For Level III, four years of related work experience and the ability to complete Level III job performance measures and Deriva Energy renewables academy training within one year.
  • Ability to read and understand technical original equipment manufacturer manuals, recommendations, warranty agreements, and electrical, civil, and mechanical drawings.
  • Strong instrumentation and electrical/electronic controls knowledge to troubleshoot, maintain, and operate a photovoltaic solar plant.
  • Ability to become proficient in the required skills to troubleshoot varying technologies.
  • General knowledge of high-voltage equipment and ability to perform high-voltage switching.
  • Ability to coordinate new-site integration, manage time, and maintain thorough records.
  • Ability to work alone and in a team environment.
  • A weight restriction of 265 pounds applies as an essential job function.
  • Valid driver's license.
Responsibilities
  • Perform daily operational rounds and operations activities, including developing and implementing complex lockout/tagout procedures; develop competence for lockout/tagout desk qualification.
  • Perform inverter and array maintenance, routine preventative maintenance, and lockout/tagout work, including research, development, isolation, independent verification, zero-energy verification, and work-leader duties.
  • Provide contractor oversight.
  • Communicate daily plant and equipment status and maintenance needs to the Operations Center.
  • Visit multiple sites as needed and perform rotational on-call duties.
  • Maintain environmental, health, and safety records, spreadsheets, and documents.
  • Perform startup duties to commission new sites, including punch lists, procedure and preventive-maintenance development, system walkdowns, assisting startup personnel, and starting and stopping units using multiple control systems.
  • Serve as integration lead for new sites and ensure Deriva standards are met before turnover from the construction group.
  • Prepare service reports for site visits, emergency repairs, equipment modifications, and equipment-improvement investigations.
  • Maintain a safe, event-free work environment by adhering to company protocols.
  • Enforce procedures and processes in accordance with site-specific operations and maintenance standards and guidelines.
  • Develop and review site-specific procedures.
Desired Qualifications
  • An associate's degree or technical degree, or four years of relevant experience in lieu of a degree.
  • Strong background in electrical and electronic equipment troubleshooting and repair.
  • Ability to direct owner and contractor associates effectively.
  • Problem-solving ability and motivation to work independently.
  • Strong organizational skills.
  • Experience using electrical test and measurement equipment and troubleshooting from schematics.
  • Working knowledge of measurement techniques, inverter controls and maintenance, and photovoltaic system functionality.
  • Experience with programmable logic controller controls and computer networking.
  • Working knowledge of power distribution systems.
  • Electrical design experience.
  • Maximo computerized maintenance management system experience.
  • Proficiency with Microsoft Office Suite, including Word, Excel, and PowerPoint.
  • Knowledge of general safety and environmental practices.

About the company

Deriva Energy develops, owns and operates wind, solar and battery storage projects across the United States for utilities, businesses and other power buyers. It manages projects from land agreements, permits and grid connections through financing, construction and operation. Customers buy renewable electricity through power purchase agreements, while other asset owners pay for maintenance, field repairs and remote operations support. Its technical teams also train renewable energy technicians and maintain the high voltage equipment that connects generating assets to the grid. The business formed in 2008 and is headquartered in Charlotte, North Carolina, under Brookfield ownership.

Company Size

501-1,000

Company Stage

N/A

Total Funding

$127M

Headquarters

Charlotte, North Carolina

Founded

2008

Get referred to Deriva Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • In August 2026, Deriva announced approval for Frontier, its 302 megawatt battery project with utility OG&E.
  • March 2026 brought completion of Deriva's solar portfolio sale to Clearway, converting operating assets into sale proceeds.
  • Deriva's entry wind technician role accepts high school graduates who complete its academy training within one year.

What critics are saying

  • Deriva's Frontier II wind posting requires several daily climbs to heights of 300 feet or more.
  • Deriva must finish developing and constructing Frontier before handing ownership to utility OG&E.
  • Deriva's senior gearbox role requires 50% travel and readiness for 40 plus hours of driving weekly.

What makes Deriva Energy unique

  • Deriva uses its proprietary GenHook LT crane for component exchanges at the top of wind turbines.
  • Deriva's generation control center monitors alarms and starts, stops and resets renewable equipment around the clock.
  • Deriva's training center holds wind industry certification and teaches wind, solar and storage technicians from other employers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) Company Match
  • Employee Assistance Program
  • Health Savings Account/Flexible Spending Account
  • Life insurance
  • Paid time off
  • Parental leave
  • Hybrid Work Options

Company News

Kenya Today
Oct 22nd, 2026
Deriva Energy secures $540 million for 350 MW Sullivan County solar project.

Deriva Energy secures $540 million for 350 MW Sullivan County solar project. Deriva Energy closed a $540 million financing package for its 350 MW utility-scale solar farm under construction in Sullivan County, Indiana, marking the developer's largest project to date. Deriva Energy announced the closing of approximately $540 million in debt financing for its Sullivan County Power Project, a 350 MW utility-scale solar photovoltaic farm currently under construction in Sullivan County, Indiana. The financing was arranged by Deriva's Capital Markets team and includes commitments from a five-bank consortium comprising Royal Bank of Canada, DNB Bank ASA, Mizuho Bank Ltd., National Westminster Bank PLC and Wells Fargo Securities, with RBC serving as administrative and collateral agent. Deriva's Chief Financial Officer Paul Tivnan highlighted the project's strong financing attributes and the competitive terms secured from top-tier relationship banks. Senior Director Thomas Hopkins, head of Deriva's Capital Markets & Treasury, said the deal reflects months of collaboration with lenders and external advisors and builds on financing structures used across the company's portfolio. Legal counsel for the borrower was provided by Skadden, while Milbank represented the lenders in the transaction. Upon completion, the Sullivan County Power Project will be Deriva Energy's largest single construction undertaking, adding to its near-7 GW operating footprint across major U.S. power markets. The financing positions the project to progress through construction toward commercial operation, reinforcing Indiana's status as a fast-growing hub for utility-scale solar investment.

Enerdatics
Oct 16th, 2026
Deriva borrows $280 million to build a battery it will not keep.

Deriva borrows $280 million to build a battery it will not keep. Deriva Energy has borrowed $280 million to build the largest battery in Oklahoma. When it is finished, Oklahoma Gas and Electric will own it. The loan is sized for a handover rather than for a holding period, which is why the per-MW figure looks nothing like the rest of the US storage market. Key takeaways * Deriva Energy has secured a $280 million debt facility from Canadian Imperial Bank of Commerce and KeyBanc Capital Markets for the construction of the Frontier battery project in Kay County, Oklahoma. * Frontier is a 302 MW / 1,208 MWh standalone battery, giving it exactly four hours of duration, and is expected to become the largest battery storage facility in Oklahoma and in the SPP region. * Oklahoma Gas and Electric will acquire the project from Deriva Energy after development and construction under a Build Transfer Agreement, so Deriva is financing an asset it will not own at commercial operations. * The facility equates to about $0.93 million per MW, against $2.28 million per MW for DESRI's $290 million debt package on the 127 MW Roccasecca battery in February 2026 and $3.48 million per MW for NineDot Energy's $431 million package on a 124 MW portfolio in the same month. * Enerdatics records 136 US battery storage financings since the start of 2024. Frontier was selected through a competitive procurement process and is expected to reach commercial operations in late 2027. What is a Build Transfer Agreement and why use one? A Build Transfer Agreement is a contract under which a developer builds a project and then sells the finished asset to a pre-agreed buyer, usually a regulated utility, at a price set before construction starts. The utility ends up owning the plant without having taken development risk. The developer books a return on development and construction rather than on decades of operation. For a regulated utility the appeal is specific. A utility earns a regulated return on assets in its rate base, so owning the battery is worth more to Oklahoma Gas and Electric than contracting for its services would be. But utilities are poorly suited to early-stage development risk, which runs through siting, permitting and interconnection. A build transfer lets a developer carry that risk and hands the utility an asset at the point where the risk has been retired. Deriva is developing Frontier in partnership with OG&E, and the project was selected competitively to improve grid reliability and meet growing demand, so the utility's requirement came first. Why is $0.93 million per MW so far below the market? Because the loan only has to survive until handover. A conventional project financing is sized against the cash flows the asset will generate over many years, and it sits in a capital structure that has to work for a long-term owner. A construction facility on a build transfer is repaid from the sale proceeds when the utility takes title. The lender's exposure ends at completion, the debt never has to be refinanced against operating revenue, and the amount required is construction cost less whatever equity the developer puts in, not a multiple of future earnings. The comparison makes the point. Enerdatics records DESRI raising $290 million for the 127 MW Roccasecca battery in February 2026, about $2.28 million per MW, and NineDot Energy raising $431 million for a 124 MW portfolio in the same month, about $3.48 million per MW. Both of those are smaller in megawatts than Frontier and larger in dollars. Duration and market differ, and a New York City battery carries costs a rural Oklahoma site does not. But a gap of three to four times is too wide to be explained by siting alone. The structure explains it. Elsewhere in the market, contracted storage held for the long term borrows differently again: the 150 MW / 600 MWh Prospect Power battery in Virginia raised $242 million of project debt alongside tax equity in September 2025, about $1.61 million per MW for an asset with a 15-year PPA and an owner intending to keep it. Does four hours of duration change the economics? It changes what the battery is for. Duration is energy capacity divided by power capacity, and Frontier's 1,208 MWh across 302 MW is exactly four hours. Most US batteries financed over the past two years have been two-hour systems. A two-hour battery captures the daily price spike and sells frequency and capacity services. A four-hour battery can shift bulk energy across the whole evening peak, and in capacity accounting it is usually credited at or near its full power rating rather than derated. In SPP that matters because the region's problem is not a short evening ramp. SPP carries a large wind fleet whose output swings across hours rather than minutes, and the grid reliability justification in the procurement points at sustained support rather than fast response. A four-hour asset selected competitively by a utility that intends to own it is being bought as a capacity resource. Per unit of energy the facility works out at about $232 per kWh, a construction debt figure rather than a capital cost, but the number that scales with what the battery delivers. Enerdatics records 136 US battery storage financings since the start of 2024, and the structures inside that count are increasingly varied. Capital is arriving at every layer, sometimes nowhere near a battery cell: SMT Energy's $268 million equity raise from Climate Adaptive Infrastructure in September 2026 was the largest equity cheque Enerdatics records into a US battery developer since the start of 2024, and none of it was earmarked for building one. What does the deal signal for US storage? The deal signals that build transfer is becoming a standard route for utility-owned storage in the middle of the country. A regulated utility that wants the asset on its balance sheet, and a developer that wants to recycle capital quickly, both get what they want, and the bank lending into it is taking construction risk against a committed purchaser rather than market risk against a merchant revenue stack. The financing cost per MW should be expected to look low in these transactions, and anyone benchmarking storage debt without checking who owns the asset at completion will draw the wrong conclusion. The second signal is about Oklahoma. Frontier will be the largest battery in the state and in SPP, procured competitively by the incumbent utility rather than developed on merchant hopes. Oklahoma has mostly appeared in Enerdatics' records through generation and tax credit activity, including Recurrent Energy's $103 million sale of North Fork solar production tax credits in June 2024. A 302 MW four-hour battery entering the rate base is a different kind of entry, and it sets a reference point for the next utility procurement in the region. Frequently asked questions. How much has Deriva Energy raised for the Frontier battery? $280 million as a debt facility from Canadian Imperial Bank of Commerce and KeyBanc Capital Markets. CIBC acted as administrative agent and co-led the financing with KeyBanc as joint bookrunners. That equates to about $0.93 million per MW. Who will own the Frontier battery project? Oklahoma Gas and Electric will acquire it from Deriva Energy following development and construction under a Build Transfer Agreement. Deriva is developing the project in partnership with OG&E and will not own it at commercial operations. How large is the Frontier battery? 302 MW of power and 1,208 MWh of energy, or exactly four hours of duration, located in Kay County, Oklahoma. It is expected to be the largest battery storage facility in Oklahoma and in the SPP region, reaching commercial operations in late 2027. Enerdatics data platform The full record behind this deal is in Enerdatics. Start a free trial of the Enerdatics database to see this deal and the transactions around it. * 20,000+ deals across M&A, financings and PPAs * 153,600+ renewable energy projects * Every data point linked to its source document

Kizhakedath Media Services Pvt. Ltd.
Oct 15th, 2026
Renewables news: Cox, Deriva Energy, Hy24, EDF.

Renewables news: Cox, Deriva Energy, Hy24, EDF. October 15, 2026 The latest renewable energy news includes announcements on Cox, Deriva Energy, Hy24, EDF, Frontier Energy Storage project in Kay County, and others. Cox Announces $2.9 Billion Investment in El Salvador, Including Solar and Battery Storage Discover more Switch Power Plans Renewables Spanish energy and water infrastructure company Cox has signed four agreements with the government of El Salvador covering approximately $2.9 billion in planned investments. The renewable-energy component includes two solar photovoltaic plants with an initial combined capacity of 200 MW, expandable to 400 MW. Battery storage developments will initially provide 440-500 MWh, with potential expansion to 1,000 MWh. The wider programme also includes a $1.8 billion liquefied natural gas terminal and power plant and $600 million in water infrastructure. Cox will work with state-owned utility CEL on the solar projects. The company intends to arrange financing through international banks and development institutions. Implementation is planned over approximately three years. Deriva Energy Secures $280 Million Financing for 302 MW Battery Storage Project in Oklahoma US renewable-energy developer Deriva Energy has closed $280 million in financing for its 302 MW Frontier Energy Storage project in Kay County, Oklahoma. The battery facility is expected to become the largest installation within the Southwest Power Pool electricity market. Canadian Imperial Bank of Commerce and KeyBanc Capital Markets acted as coordinating lead arrangers and joint bookrunners, with CIBC also serving as administrative agent. Construction has commenced, and substantial completion is expected in late 2027. Oklahoma Gas & Electric will acquire the completed project under a build-transfer agreement. Deriva, backed by Brookfield, operates or is constructing approximately 7 GW of wind, solar and battery storage assets and maintains a multi-gigawatt development pipeline. Discover more wind farms wind-energy Explore Wind Power Hy24 Agrees to Acquire EDF's Hynamics Hydrogen Business, Targeting Q1 2027 Closing French hydrogen investment manager Hy24 has signed an agreement with EDF Pulse Ventures to acquire Hynamics, the low-carbon hydrogen development subsidiary of EDF. The transaction will be executed through Hy24's Clean Hydrogen Infrastructure fund. Established in 2019, Hynamics develops and operates hydrogen production projects serving industrial customers and heavy transportation applications in France and the United Kingdom. Its technology portfolio includes water electrolysis systems using low-carbon electricity. Hy24 intends to expand Hynamics' project development, financing and commercial operations across European markets. Completion is targeted for the first quarter of 2027, subject to regulatory approvals and customary conditions. The parties did not disclose transaction consideration, Hynamics' revenue or the number of employees transferring. Discover more Learn Engineering

WGLT
Jun 25th, 2025
Deriva Energy proposes 300-megawatt solar farm in eastern McLean County

Deriva Energy proposes 300-megawatt solar farm in eastern McLean County.

PR Newswire
May 22nd, 2025
Deriva Energy Completes Financing For Two Established Projects

CHARLOTTE, N.C., May 19, 2025 /PRNewswire/ -- Deriva Energy, LLC, a leader in clean power generation, operations and development, today announced that it has completed a $127 million debt financing for a portfolio of two operating energy assets.Principal Asset ManagementSM and MetLife Investment Management provided Senior Secured Notes to the portfolio, which is comprised of two projects owned and operated by Deriva, Ledyard Wind and Pisgah Ridge Solar. Ledyard Wind is a 207 MW wind facility in Kossuth County, Iowa, and Pisgah Ridge is a 250 MW solar facility located in Navarro County, Texas. Both projects began commercial operations in 2022 and sell power under long-term power purchase agreements with two high quality corporate purchasers.Thomas Hopkins, Director of Capital Markets at Deriva, said: "This transaction marks a significant accomplishment for the company and was completed during a period of heightened market turbulence driven by uncertainty over tariffs and international trade policy. We are grateful for the partnership of our investors, whose experience in renewable energy financings was extremely valuable, and we look forward to long and productive relationships with them."Mansi Patel, Senior Managing Director and Head of Infrastructure Debt, for Principal Asset Management said: "We are thrilled to have led the structuring of this transaction, supporting Deriva's high-quality portfolio assets with a tailored financing solution. We are excited to continue to grow our firm's strong relationship."This is the second debt financing arranged with Principal Asset Management and MetLife Investment Management since Brookfield's purchase of Deriva in October 2023; both firms invested in a $207 million Deriva debt transaction in October 2024.About Deriva EnergyDeriva Energy (formerly Duke Energy Renewables, LLC) is an established industry leader in clean energy, with over 6,200 megawatts of operating assets and over 10,500 MW of assets in development across the U.S. Headquartered in Charlotte, North Carolina, Deriva is a portfolio company of Brookfield, one of the world's largest owners and operators of renewable power and climate transition assets