Simplify Logo
Crusoe

Crusoe

Climate-aligned HPC powered by wasted energy

Technical Trainer - Digital Infrastructure Group, Summer 2026

InternshipPosted on 2/25/2026
$42.25/hr

+ Housing Stipend

Bachelor's, Master's, MBA
San Francisco, CA, USA
In Person

May 18–Aug 7; Jun 1–Aug 21; Jun 15–Sep 4, 2026 internships run full-time on-site in SF.

About the job

Requirements
  • BS, MBA, or MS program in Computer Science, Data Analytics, Industrial Engineering, or a related quantitative field graduating between Fall 2026-Spring 2027
  • Technical Fluency: Ability to read/write code and discuss data architecture comfortably
  • Data Stack: Hands-on with Python and SQL; experience calling REST APIs and parsing JSON
  • AI Knowledge: Working understanding of large language models, prompt design, and agentic patterns (RAG, function calling, planning)
  • Analytics: Ability to build basic dashboards (Tableau/Sigma) and compute product metrics
Responsibilities
  • Develop an agent capable of meeting prep, decision memos, action-item capture, and stakeholder Q&A
  • Design workflows involving tool use, multi-agent coordination, and long-term memory
  • Map business processes (BPMN) to identify automation candidates and quantify business value
  • Handle the end-to-end lifecycle: data preparation with SQL, logic with Python/Dataiku, and lightweight user interfaces
  • Instrument success with key performance indicators (latency, precision/recall, cost) and provide a final run-book for IT supportability
Desired Qualifications
  • Bias to Action: You prefer a "fast experiment" over a long meeting
  • High Agency: You can take ambiguity, build a backlog, and manage your own project plan
  • Executive Presence: You write concisely and present with confidence

About the company

Crusoe Energy Systems uses wasted, stranded, or clean energy sources to power high-performance computing and AI workloads. It turns otherwise unused energy into scalable computing resources and offers technical support to enterprises in AI and data-intensive fields. Unlike traditional data centers, Crusoe colocates infrastructure at energy sources to capture excess energy and convert it into computer power, reducing emissions. Its goal is to help the energy transition by providing climate-aligned, reliable computing while boosting resource efficiency.

Company Size

1,001-5,000

Company Stage

Series F

Total Funding

$18.7B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 15, 2026 Perplexity expands Crusoe's named-customer roster and utilization.
  • Jane Street's roughly $13 billion five-year deal signals durable enterprise demand.
  • Crusoe reported nearly 5 gigawatts contracted capacity, with pipeline above 40 gigawatts.

What critics are saying

  • Texas audits on August 8, 2026 target data-center permits, energy, water, and ownership.
  • Goodnight campus gas plans imply 4.5 million tons yearly CO2, fueling political backlash.
  • A $30 billion valuation and $1.375 billion raise create huge execution pressure by 2027.

What makes Crusoe unique

  • Crusoe vertically integrates power, manufacturing, and cloud, unlike pure-play neoclouds.
  • September 2026 Perplexity ties training and inference onto one Crusoe platform.
  • Tulsa plants make switchgear in-house, shortening data-center deployment cycles.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Industry competitive pay

Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents

Paid life insurance, short-term and long-term disability

Parental leave

Stock options in a fast-growing, well-funded technology company

Pet-friendly offices

Teladoc

401(k) with a 4% match

Unlimited time off

Cell phone reimbursement

Tuition reimbursement

Company paid commuter benefit; $100 per month

Calm

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-1%

2 year growth

2%
Yahoo Finance
Sep 15th, 2026
Crusoe signs multiyear Perplexity cloud deal for Nvidia AI chips

Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.

Yahoo Finance
Sep 14th, 2026
Crusoe opens second Tulsa facility, doubles workforce to 300 for AI infrastructure manufacturing

Crusoe has opened its second manufacturing facility in Tulsa, Oklahoma, adding 400,000 square feet to its operations and bringing its national manufacturing footprint to roughly 1 million square feet. The AI infrastructure company has hired more than 300 local workers across its two Tulsa sites, up from the 100 initially expected when the first facility opened in 2024. The facilities produce electrical equipment for AI infrastructure, including medium-voltage switchgear, low-voltage switchboards, electrical enclosures, industrial controls, and custom-fabricated copper busbar. The company has supplied more than 2,500 switchboards to its Stargate Project site in Abilene, Texas. Crusoe now employs more than 1,800 people, with 15,000 skilled workers across its sites. The company manufactures components in-house to reduce production time and maintain quality control.

Bloomberg Law
Sep 3rd, 2026
Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation

Crusoe, a cloud-computing provider and data center developer doing business with OpenAI, Microsoft Corp. and Meta Platforms Inc., has raised over $3 billion in a funding round that values the startup at roughly $30 billion, according to people familiar with the situation.

Yahoo Finance
Jul 31st, 2026
Crusoe plans $1B expansion of Google-linked Texas data centre with two new buildings

Crusoe has registered two additional data-centre buildings at its Goodnight campus near Claude, Texas, with estimated construction costs totalling $1 billion, according to state filings. The buildings would add approximately 1.61 million square feet to the Armstrong County development, also known as Project Llano. Each single-storey structure is planned at roughly 805,380 square feet, with multiple data halls, office space and support areas. Public reporting has linked Google to the campus development through intermediary Ensign Infrastructure. Building 3 is scheduled for completion on 1 August, whilst Building 4 has a March 2027 completion date. Power plans include grid-supplied electricity and potential on-site generation, with a natural-gas plant proposal for up to 933 MW capacity. Separately, Crusoe announced a partnership with Aalo Atomics to examine modular nuclear generation for future data centres.

Yahoo Finance
Jul 21st, 2026
Crusoe and ON.energy to deploy 5GW of AI UPS™ across multiple hyperscale campuses

Crusoe and ON.energy have announced a partnership to deploy 5 gigawatts of AI UPS™ technology across multiple hyperscale campuses, with commissioning starting in 2026 and continuing into 2027. AI data centres create unprecedented grid challenges. During training, thousands of GPUs ramp up and down in synchronised bursts, causing power demand fluctuations hundreds to thousands of times daily. These load swings can propagate through interconnection points into transmission systems. ON.energy's patented AI UPS™ is a medium-voltage uninterruptible power system that sits between power sources and data centres. It decouples facilities from the grid, protecting equipment during voltage faults whilst preventing GPU load swings from affecting the grid. The technology has been validated against ERCOT's Large Load Interconnection requirements, meeting grid stability and voltage ride-through standards.

INACTIVE